Skip to main content

Train & bus from Vapi to Jamui

No direct train, no direct bus and 200 bus + train combinations connect Vapi and Jamui. Fastest: 37 h 13 min via Mumbai. Fares from ₹410 (est.). First departure 00:22, last 23:53.

No direct train — best combinations below.

Times for a typical Wednesday — check your dateCheck your travel date

Quick picks

  • Fastest

    Train 59460→ Mumbai →Train 1236204:27–17:40 · 37 h 13 min · from ₹475 (est.)
  • Cheapest

    Train 19049→ Varanasi →Train 63264→ Patna →Train 5320418:28–21:29 · 51 h 1 min · from ₹410 (est.)
  • Fewest changes

    Train 59460→ Mumbai →Train 1236204:27–17:40 · 37 h 13 min · from ₹475 (est.)

Bus + train and other combinations (200)

via Mumbai · 1 route · best 37 h 13 min

  1. Option 1: 4:27 AM5:40 PM+1 day

    37 h 13 min1 changeSmallest buffer: 242 minfrom ₹475 (est.)

    via Mumbai

    • Best
    • Fastest
    • Fewest changes
    1. 4:27 AMSJNSanjan

      Train59460Veraval Mumbai Central Passenger Express

      Starts from Veraval (VRL) on Tue, 17 Nov at 13:20 (1:20 PM) · you board on day 2

      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Mumbai Central (BCT) at Wed, 18 Nov 07:40

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 2 h 1 min · 129 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹20(est.)

      23 stops — Show or hide intermediate stops
      1. 4:31 AMUBRUmbargam Road
      2. 4:34 AMBRRDBordi Road
      3. 4:38 AMGVDGholvad
      4. 4:45 AMDRDDahanu Road
      5. 4:54 AMVGNVangaon
      6. 5:01 AMBORBoisar
      7. 5:04 AMUOIUmroli
      8. 5:10 AMPLGPalghar · 2 min halt
      9. 5:20 AMKLVKelva Road
      10. 5:27 AMSAHSaphale
      11. 5:35 AMVTNVaitarana
      12. 5:43 AMVRVirar
      13. 5:47 AMNSPNalla Sopara
      14. 5:52 AMBSRVasai Road
      15. 5:55 AMNIGNaigaon
      16. 6:00 AMBYRBhayandar
      17. 6:03 AMMIRAMira Road
      18. 6:07 AMDICDahisar
      19. 6:09 AMBVIBorivali · 2 min halt
      20. 6:15 AMKILEKandivli
      21. 6:17 AMMDDMalad
      22. 6:21 AMGMNGoregaon
      23. 6:25 AMJOSJogeshwari
      6:28 AMADHAndheri
    2. Change at Mumbai

      • Local transit: 50 min · Andheri (ADH) → Dadar (DR)
      • Safety buffer: 242 min (4 h 2 min) Total wait: 292 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Mumbai?

      Find a room near Dadar
    3. 11:20 AMDRDadar

      Train12362Asansol SF Express

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

      Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

      Runs: Wed

      Indian Railways · 30 h 20 min · 1880 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹455SL ₹8453A ₹2,1952A ₹3,090(est.)

      14 stops — Show or hide intermediate stops
      1. 11:57 AMKYNKalyan Jn · 3 min halt
      2. 3:33 PMMMRManmad Jn · 2 min halt
      3. 5:55 PMBSLBhusaval Jn · 5 min halt
      4. 7:57 PMKNWKhandwa · 3 min halt
      5. 10:25 PMETItarsi Jn · 10 min halt
      6. 1:25 AMJBPJabalpur · 10 min halt
      7. 2:55 AMKTEKatni · 5 min halt
      8. 4:25 AMSTASatna · 5 min halt
      9. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
      10. 8:45 AMMZPMirzapur · 5 min halt
      11. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      12. 11:25 AMBXRBuxar · 2 min halt
      13. 1:28 PMPNBEPatna Jn · 7 min halt
      14. 4:00 PMKIULKiul Jn · 2 min halt
      5:40 PM+1 dayJAJJhajha

via Delhi · 6 routes · best 37 h 55 min

  1. Option 1: 6:55 PM8:50 AM+2 days

    37 h 55 min1 changeSmallest buffer: 417 minfrom ₹2,240 (est.)

    via Delhi

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → Anand Vihar Terminal (ANVT)
      • Safety buffer: 417 min (6 h 57 min) Total wait: 457 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near Anand Vihar Terminal
    3. 5:20 PM+1 dayANVTAnand Vihar Terminal

      Train12236Anand Vihar - Madhupur Humsafar Express

      Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

      Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

      Runs: Thu

      Indian Railways · 15 h 30 min · 1166 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹310SL ₹5903A ₹1,520(est.)

      8 stops — Show or hide intermediate stops
      1. 10:12 PMCNBKanpur Central · 5 min halt
      2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
      3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      4. 3:40 AMBXRBuxar · 2 min halt
      5. 4:25 AMARAAra · 2 min halt
      6. 5:13 AMPNBEPatna Jn · 7 min halt
      7. 6:21 AMMKAMokama · 2 min halt
      8. 6:50 AMKIULKiul Jn · 2 min halt
      8:50 AM+2 daysJAJJhajha
All 6 combinations via Delhi
  1. Option 2: 6:55 PM9:39 AM+2 days

    38 h 44 min1 changeSmallest buffer: 347 minfrom ₹2,240 (est.)

    via Delhi

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 65 min · Hazrat Nizamuddin Jn (NZM) → Shakurbasti (SSB)
      • Safety buffer: 347 min (5 h 47 min) Total wait: 412 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near Shakurbasti
    3. 4:35 PM+1 daySSBShakurbasti

      Train12304Poorva Express

      Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

      Runs: Sun, Wed, Thu, Sat

      Indian Railways · 17 h 4 min · 1164 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹310SL ₹5903A ₹1,5152A ₹2,1201A ₹3,520(est.)

      15 stops — Show or hide intermediate stops
      1. 5:15 PMNDLSNew Delhi · 25 min halt
      2. 7:13 PMALJNAligarh Jn · 2 min halt
      3. 8:13 PMTDLTundla Jn · 2 min halt
      4. 9:08 PMETWEtawah · 2 min halt
      5. 10:55 PMCNBKanpur Central · 10 min halt
      6. 1:15 AMPRYJPrayagraj Jn · 5 min halt
      7. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      8. 5:03 AMBXRBuxar · 2 min halt
      9. 5:45 AMARAAra · 5 min halt
      10. 6:22 AMDNRDanapur · 2 min halt
      11. 6:48 AMPNBEPatna Jn · 7 min halt
      12. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
      13. 7:49 AMBARHBarh · 2 min halt
      14. 8:10 AMMKAMokama · 2 min halt
      15. 9:08 AMKIULKiul Jn · 2 min halt
      9:39 AM+2 daysJMUJamui
  2. Option 3: 6:55 PM10:55 AM+2 days

    40 h1 changeSmallest buffer: 347 minfrom ₹2,245 (est.)

    via Delhi

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 65 min · Hazrat Nizamuddin Jn (NZM) → Shakurbasti (SSB)
      • Safety buffer: 347 min (5 h 47 min) Total wait: 412 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near Shakurbasti
    3. 4:35 PM+1 daySSBShakurbasti

      Train12304Poorva Express

      Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

      Runs: Sun, Wed, Thu, Sat

      Indian Railways · 18 h 20 min · 1190 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹315SL ₹6003A ₹1,5402A ₹2,1551A ₹3,580(est.)

      16 stops — Show or hide intermediate stops
      1. 5:15 PMNDLSNew Delhi · 25 min halt
      2. 7:13 PMALJNAligarh Jn · 2 min halt
      3. 8:13 PMTDLTundla Jn · 2 min halt
      4. 9:08 PMETWEtawah · 2 min halt
      5. 10:55 PMCNBKanpur Central · 10 min halt
      6. 1:15 AMPRYJPrayagraj Jn · 5 min halt
      7. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      8. 5:03 AMBXRBuxar · 2 min halt
      9. 5:45 AMARAAra · 5 min halt
      10. 6:22 AMDNRDanapur · 2 min halt
      11. 6:48 AMPNBEPatna Jn · 7 min halt
      12. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
      13. 7:49 AMBARHBarh · 2 min halt
      14. 8:10 AMMKAMokama · 2 min halt
      15. 9:08 AMKIULKiul Jn · 2 min halt
      16. 9:39 AMJMUJamui · 2 min halt
      10:55 AM+2 daysJAJJhajha
Search another date

via Delhi · 7 routes · best 37 h 55 min

  1. Option 1: 6:55 PM8:50 AM+2 days

    37 h 55 min2 changesSmallest buffer: 189 minfrom ₹2,825 (est.)

    via Delhi · Kanpur

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → New Delhi (NDLS)
      • Safety buffer: 277 min (4 h 37 min) Total wait: 317 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near New Delhi
    3. 3:00 PM+1 dayNDLSNew Delhi

      Train22416New Delhi - Varanasi Vande Bharat Express

      Starts from New Delhi (NDLS) on Thu, 19 Nov at 15:00 (3:00 PM) · you board on day 1

      Ends at Varanasi Jn (BSB) at Thu, 19 Nov 23:05

      Runs: Sun, Mon, Wed, Thu, Fri, Sat

      Indian Railways · 4 h 8 min · 440 km

      Scheduled timetable. From the published timetable. Delays are possible.

      CC ₹685(est.)

      7:08 PM+1 dayCNBKanpur Central
    4. Change at Kanpur

      • Same station, no local travel
      • Safety buffer: 189 min (3 h 9 min) Total wait: 189 min
    5. 10:17 PM+1 dayCNBKanpur Central

      Train12236Anand Vihar - Madhupur Humsafar Express

      Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

      Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

      Runs: Thu

      Indian Railways · 10 h 33 min · 738 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹210SL ₹4103A ₹1,045(est.)

      7 stops — Show or hide intermediate stops
      1. 12:23 AMPRYJPrayagraj Jn · 2 min halt
      2. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      3. 3:40 AMBXRBuxar · 2 min halt
      4. 4:25 AMARAAra · 2 min halt
      5. 5:13 AMPNBEPatna Jn · 7 min halt
      6. 6:21 AMMKAMokama · 2 min halt
      7. 6:50 AMKIULKiul Jn · 2 min halt
      8:50 AM+2 daysJAJJhajha
All 7 combinations via Delhi
  1. Option 2: 6:55 PM11:04 AM+2 days

    40 h 9 min2 changesSmallest buffer: 213 minfrom ₹2,240 (est.)

    via Delhi · Lakhisarai

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → Anand Vihar Terminal (ANVT)
      • Safety buffer: 417 min (6 h 57 min) Total wait: 457 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near Anand Vihar Terminal
    3. 5:20 PM+1 dayANVTAnand Vihar Terminal

      Train12236Anand Vihar - Madhupur Humsafar Express

      Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

      Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

      Runs: Thu

      Indian Railways · 13 h 30 min · 1113 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹300SL ₹5703A ₹1,465(est.)

      7 stops — Show or hide intermediate stops
      1. 10:12 PMCNBKanpur Central · 5 min halt
      2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
      3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      4. 3:40 AMBXRBuxar · 2 min halt
      5. 4:25 AMARAAra · 2 min halt
      6. 5:13 AMPNBEPatna Jn · 7 min halt
      7. 6:21 AMMKAMokama · 2 min halt
      6:50 AM+2 daysKIULKiul Jn
    4. Change at Lakhisarai

      • Same station, no local travel
      • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min
    5. 10:23 AM+2 daysKIULKiul Jn

      Train53624Gaya - Jhajha Passenger

      Starts from Gaya Jn (GAYA) on Fri, 20 Nov at 05:15 (5:15 AM) · you board on day 1

      Ends at Jhajha (JAJ) at Fri, 20 Nov 12:20

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 41 min · 19 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10(est.)

      4 stops — Show or hide intermediate stops
      1. 10:29 AMMHLTMahesh Leta Halt · 1 min halt
      2. 10:34 AMLCKLakhochak Halt · 1 min halt
      3. 10:40 AMBSQPBansipur · 1 min halt
      4. 10:51 AMMNPMananpur · 1 min halt
      11:04 AM+2 daysBFMBhalui
  2. Option 3: 6:55 PM11:10 AM+2 days

    40 h 15 min2 changesSmallest buffer: 213 minfrom ₹2,240 (est.)

    via Delhi · Lakhisarai

    1. 6:55 PMVAPIVapi

      Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

      Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

      Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

      Runs: Daily

      Indian Railways · 14 h 48 min · 1213 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹1,9302A ₹2,7101A ₹4,505(est.)

      9 stops — Show or hide intermediate stops
      1. 7:13 PMBLValsad · 2 min halt
      2. 8:10 PMSTSurat · 5 min halt
      3. 8:53 PMBHBharuch Jn · 2 min halt
      4. 9:44 PMBRCVadodara Jn · 10 min halt
      5. 11:38 PMDHDDahod · 2 min halt
      6. 1:13 AMRTMRatlam Jn · 2 min halt
      7. 4:05 AMKOTAKota Jn · 10 min halt
      8. 5:23 AMSWMSawai Madhopur · 2 min halt
      9. 7:53 AMMTJMathura Jn · 2 min halt
      9:43 AM+1 dayNZMHazrat Nizamuddin Jn
    2. Change at Delhi

      • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → Anand Vihar Terminal (ANVT)
      • Safety buffer: 417 min (6 h 57 min) Total wait: 457 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Delhi?

      Find a room near Anand Vihar Terminal
    3. 5:20 PM+1 dayANVTAnand Vihar Terminal

      Train12236Anand Vihar - Madhupur Humsafar Express

      Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

      Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

      Runs: Thu

      Indian Railways · 13 h 30 min · 1113 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹300SL ₹5703A ₹1,465(est.)

      7 stops — Show or hide intermediate stops
      1. 10:12 PMCNBKanpur Central · 5 min halt
      2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
      3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      4. 3:40 AMBXRBuxar · 2 min halt
      5. 4:25 AMARAAra · 2 min halt
      6. 5:13 AMPNBEPatna Jn · 7 min halt
      7. 6:21 AMMKAMokama · 2 min halt
      6:50 AM+2 daysKIULKiul Jn
    4. Change at Lakhisarai

      • Same station, no local travel
      • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min
    5. 10:23 AM+2 daysKIULKiul Jn

      Train53624Gaya - Jhajha Passenger

      Starts from Gaya Jn (GAYA) on Fri, 20 Nov at 05:15 (5:15 AM) · you board on day 1

      Ends at Jhajha (JAJ) at Fri, 20 Nov 12:20

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 47 min · 22 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10(est.)

      5 stops — Show or hide intermediate stops
      1. 10:29 AMMHLTMahesh Leta Halt · 1 min halt
      2. 10:34 AMLCKLakhochak Halt · 1 min halt
      3. 10:40 AMBSQPBansipur · 1 min halt
      4. 10:51 AMMNPMananpur · 1 min halt
      5. 11:04 AMBFMBhalui · 1 min halt
      11:10 AM+2 daysKDERKunder Halt
Search another date

via Godhra · 3 routes · best 38 h 4 min

    All 3 combinations via Godhra
    1. Option 2: 7:35 PM9:39 AM+2 days

      38 h 4 min2 changesSmallest buffer: 183 minfrom ₹575 (est.)

      via Godhra · Agra

      1. 7:35 PMVAPIVapi

        Train12995Ajmer SF Express

        Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

        Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

        Runs: Sun, Wed, Fri

        Indian Railways · 4 h 22 min · 299 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹100SL ₹2153A ₹5202A ₹710(est.)

        4 stops — Show or hide intermediate stops
        1. 7:58 PMBLValsad · 2 min halt
        2. 9:05 PMSTSurat · 5 min halt
        3. 9:48 PMBHBharuch Jn · 2 min halt
        4. 10:42 PMBRCVadodara Jn · 10 min halt
        11:57 PMGDAGodhra Jn
      2. Change at Godhra

        • Same station, no local travel
        • Safety buffer: 183 min (3 h 3 min) Total wait: 183 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Godhra?

        Find a room near Godhra Jn
      3. 3:00 AM+1 dayGDAGodhra Jn

        Train09441Ahmedabad - Rajgir Special

        Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 23:55 (11:55 PM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Rajgir (RGD) at Fri, 20 Nov 11:45

        Runs: Wed

        Indian Railways · 11 h 47 min · 787 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹210SL ₹405(est.)

        8 stops — Show or hide intermediate stops
        1. 3:48 AMDHDDahod · 2 min halt
        2. 5:10 AMRTMRatlam Jn · 5 min halt
        3. 7:15 AMBWMBhawani Mandi · 2 min halt
        4. 7:35 AMRMARamganj Mandi · 2 min halt
        5. 8:30 AMKOTAKota Jn · 5 min halt
        6. 9:48 AMSWMSawai Madhopur · 2 min halt
        7. 11:47 AMHANHindaun City · 2 min halt
        8. 1:00 PMBXNBayana Jn · 2 min halt
        2:47 PM+1 dayIDHIdgah Agra Jn
      4. Change at Agra

        • Local transit: 95 min · Idgah Agra Jn (IDH) → Tundla Jn (TDL)
        • Safety buffer: 233 min (3 h 53 min) Total wait: 328 min

        Station change — you must travel to a different station or bus stand

        Partner link

        Long wait at Agra?

        Find a room near Tundla Jn
      5. 8:15 PM+1 dayTDLTundla Jn

        Train12304Poorva Express

        Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

        Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

        Runs: Sun, Wed, Thu, Sat

        Indian Railways · 13 h 24 min · 943 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹265SL ₹5053A ₹1,2902A ₹1,8051A ₹2,990(est.)

        12 stops — Show or hide intermediate stops
        1. 9:08 PMETWEtawah · 2 min halt
        2. 10:55 PMCNBKanpur Central · 10 min halt
        3. 1:15 AMPRYJPrayagraj Jn · 5 min halt
        4. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        5. 5:03 AMBXRBuxar · 2 min halt
        6. 5:45 AMARAAra · 5 min halt
        7. 6:22 AMDNRDanapur · 2 min halt
        8. 6:48 AMPNBEPatna Jn · 7 min halt
        9. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
        10. 7:49 AMBARHBarh · 2 min halt
        11. 8:10 AMMKAMokama · 2 min halt
        12. 9:08 AMKIULKiul Jn · 2 min halt
        9:39 AM+2 daysJMUJamui
    2. Option 3: 7:35 PM10:55 AM+2 days

      39 h 20 min2 changesSmallest buffer: 183 minfrom ₹580 (est.)

      via Godhra · Agra

      1. 7:35 PMVAPIVapi

        Train12995Ajmer SF Express

        Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

        Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

        Runs: Sun, Wed, Fri

        Indian Railways · 4 h 22 min · 299 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹100SL ₹2153A ₹5202A ₹710(est.)

        4 stops — Show or hide intermediate stops
        1. 7:58 PMBLValsad · 2 min halt
        2. 9:05 PMSTSurat · 5 min halt
        3. 9:48 PMBHBharuch Jn · 2 min halt
        4. 10:42 PMBRCVadodara Jn · 10 min halt
        11:57 PMGDAGodhra Jn
      2. Change at Godhra

        • Same station, no local travel
        • Safety buffer: 183 min (3 h 3 min) Total wait: 183 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Godhra?

        Find a room near Godhra Jn
      3. 3:00 AM+1 dayGDAGodhra Jn

        Train09441Ahmedabad - Rajgir Special

        Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 23:55 (11:55 PM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Rajgir (RGD) at Fri, 20 Nov 11:45

        Runs: Wed

        Indian Railways · 11 h 47 min · 787 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹210SL ₹405(est.)

        8 stops — Show or hide intermediate stops
        1. 3:48 AMDHDDahod · 2 min halt
        2. 5:10 AMRTMRatlam Jn · 5 min halt
        3. 7:15 AMBWMBhawani Mandi · 2 min halt
        4. 7:35 AMRMARamganj Mandi · 2 min halt
        5. 8:30 AMKOTAKota Jn · 5 min halt
        6. 9:48 AMSWMSawai Madhopur · 2 min halt
        7. 11:47 AMHANHindaun City · 2 min halt
        8. 1:00 PMBXNBayana Jn · 2 min halt
        2:47 PM+1 dayIDHIdgah Agra Jn
      4. Change at Agra

        • Local transit: 95 min · Idgah Agra Jn (IDH) → Tundla Jn (TDL)
        • Safety buffer: 233 min (3 h 53 min) Total wait: 328 min

        Station change — you must travel to a different station or bus stand

        Partner link

        Long wait at Agra?

        Find a room near Tundla Jn
      5. 8:15 PM+1 dayTDLTundla Jn

        Train12304Poorva Express

        Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

        Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

        Runs: Sun, Wed, Thu, Sat

        Indian Railways · 14 h 40 min · 969 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹270SL ₹5153A ₹1,3252A ₹1,8451A ₹3,060(est.)

        13 stops — Show or hide intermediate stops
        1. 9:08 PMETWEtawah · 2 min halt
        2. 10:55 PMCNBKanpur Central · 10 min halt
        3. 1:15 AMPRYJPrayagraj Jn · 5 min halt
        4. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        5. 5:03 AMBXRBuxar · 2 min halt
        6. 5:45 AMARAAra · 5 min halt
        7. 6:22 AMDNRDanapur · 2 min halt
        8. 6:48 AMPNBEPatna Jn · 7 min halt
        9. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
        10. 7:49 AMBARHBarh · 2 min halt
        11. 8:10 AMMKAMokama · 2 min halt
        12. 9:08 AMKIULKiul Jn · 2 min halt
        13. 9:39 AMJMUJamui · 2 min halt
        10:55 AM+2 daysJAJJhajha
    3. Option 4: 7:35 PM2:25 PM+2 days

      42 h 50 min2 changesSmallest buffer: 183 minfrom ₹560 (est.)

      via Godhra · Prayagraj

      1. 7:35 PMVAPIVapi

        Train12995Ajmer SF Express

        Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

        Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

        Runs: Sun, Wed, Fri

        Indian Railways · 4 h 22 min · 299 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹100SL ₹2153A ₹5202A ₹710(est.)

        4 stops — Show or hide intermediate stops
        1. 7:58 PMBLValsad · 2 min halt
        2. 9:05 PMSTSurat · 5 min halt
        3. 9:48 PMBHBharuch Jn · 2 min halt
        4. 10:42 PMBRCVadodara Jn · 10 min halt
        11:57 PMGDAGodhra Jn
      2. Change at Godhra

        • Same station, no local travel
        • Safety buffer: 183 min (3 h 3 min) Total wait: 183 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Godhra?

        Find a room near Godhra Jn
      3. 3:00 AM+1 dayGDAGodhra Jn

        Train09441Ahmedabad - Rajgir Special

        Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 23:55 (11:55 PM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Rajgir (RGD) at Fri, 20 Nov 11:45

        Runs: Wed

        Indian Railways · 20 h 42 min · 1232 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹310SL ₹585(est.)

        11 stops — Show or hide intermediate stops
        1. 3:48 AMDHDDahod · 2 min halt
        2. 5:10 AMRTMRatlam Jn · 5 min halt
        3. 7:15 AMBWMBhawani Mandi · 2 min halt
        4. 7:35 AMRMARamganj Mandi · 2 min halt
        5. 8:30 AMKOTAKota Jn · 5 min halt
        6. 9:48 AMSWMSawai Madhopur · 2 min halt
        7. 11:47 AMHANHindaun City · 2 min halt
        8. 1:00 PMBXNBayana Jn · 2 min halt
        9. 2:47 PMIDHIdgah Agra Jn · 5 min halt
        10. 4:22 PMTDLTundla Jn · 10 min halt
        11. 8:02 PMGOYGovindpuri · 10 min halt
        11:42 PM+1 daySFGSubedarganj
      4. Change at Prayagraj

        • Local transit: 25 min · Subedarganj (SFG) → Prayagraj Jn (PRYJ)
        • Safety buffer: 233 min (3 h 53 min) Total wait: 258 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Prayagraj?

        Find a room near Prayagraj Jn
      5. 4:00 AM+2 daysPRYJPrayagraj Jn

        Train11106Pratham Swatantrata Sangram Express

        Starts from Jhansi Jn (JHS) on Thu, 19 Nov at 20:40 (8:40 PM) · you board on day 2

        This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 21:45

        Runs: Daily · Running days not verified — check before booking

        Indian Railways · 10 h 25 min · 548 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹150SL ₹2953A ₹775(est.)

        5 stops — Show or hide intermediate stops
        1. 7:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
        2. 8:42 AMBXRBuxar · 2 min halt
        3. 9:27 AMARAAra · 2 min halt
        4. 10:40 AMPNBEPatna Jn · 10 min halt
        5. 12:38 PMKIULKiul Jn · 2 min halt
        2:25 PM+2 daysJAJJhajha

    via Ratlam · 3 routes · best 38 h 4 min

      All 3 combinations via Ratlam
      1. Option 2: 7:35 PM9:39 AM+2 days

        38 h 4 min2 changesSmallest buffer: 190 minfrom ₹580 (est.)

        via Ratlam · Kanpur

        • Different change city
        1. 7:35 PMVAPIVapi

          Train12995Ajmer SF Express

          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

          Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

          Runs: Sun, Wed, Fri

          Indian Railways · 6 h 55 min · 486 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹150SL ₹3003A ₹7452A ₹1,025(est.)

          6 stops — Show or hide intermediate stops
          1. 7:58 PMBLValsad · 2 min halt
          2. 9:05 PMSTSurat · 5 min halt
          3. 9:48 PMBHBharuch Jn · 2 min halt
          4. 10:42 PMBRCVadodara Jn · 10 min halt
          5. 11:57 PMGDAGodhra Jn · 2 min halt
          6. 12:47 AMDHDDahod · 2 min halt
          2:30 AM+1 dayRTMRatlam Jn
        2. Change at Ratlam

          • Same station, no local travel
          • Safety buffer: 220 min (3 h 40 min) Total wait: 220 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Ratlam?

          Find a room near Ratlam Jn
        3. 6:10 AM+1 dayRTMRatlam Jn

          Train19569Okha Varanasi Express

          Starts from Okha (OKHA) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 2

          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Varanasi Jn (BSB) at Fri, 20 Nov 05:00

          Runs: Daily · Running days not verified — check before booking

          Indian Railways · 13 h 45 min · 859 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹225SL ₹4353A ₹1,1452A ₹1,615(est.)

          6 stops — Show or hide intermediate stops
          1. 7:10 AMNADNagda Jn · 2 min halt
          2. 9:50 AMKOTAKota Jn · 10 min halt
          3. 11:15 AMSWMSawai Madhopur · 5 min halt
          4. 12:23 PMGGCGangapur City · 2 min halt
          5. 3:50 PMAFAgra Fort · 10 min halt
          6. 4:50 PMTDLTundla Jn · 5 min halt
          7:55 PM+1 dayCNBKanpur Central
        4. Change at Kanpur

          • Same station, no local travel
          • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min
        5. 11:05 PM+1 dayCNBKanpur Central

          Train12304Poorva Express

          Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

          Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

          Runs: Sun, Wed, Thu, Sat

          Indian Railways · 10 h 34 min · 712 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹205SL ₹4003A ₹1,0152A ₹1,4101A ₹2,330(est.)

          10 stops — Show or hide intermediate stops
          1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
          2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
          3. 5:03 AMBXRBuxar · 2 min halt
          4. 5:45 AMARAAra · 5 min halt
          5. 6:22 AMDNRDanapur · 2 min halt
          6. 6:48 AMPNBEPatna Jn · 7 min halt
          7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
          8. 7:49 AMBARHBarh · 2 min halt
          9. 8:10 AMMKAMokama · 2 min halt
          10. 9:08 AMKIULKiul Jn · 2 min halt
          9:39 AM+2 daysJMUJamui
      2. Option 3: 7:35 PM10:55 AM+2 days

        39 h 20 min2 changesSmallest buffer: 190 minfrom ₹585 (est.)

        via Ratlam · Kanpur

        1. 7:35 PMVAPIVapi

          Train12995Ajmer SF Express

          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

          Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

          Runs: Sun, Wed, Fri

          Indian Railways · 6 h 55 min · 486 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹150SL ₹3003A ₹7452A ₹1,025(est.)

          6 stops — Show or hide intermediate stops
          1. 7:58 PMBLValsad · 2 min halt
          2. 9:05 PMSTSurat · 5 min halt
          3. 9:48 PMBHBharuch Jn · 2 min halt
          4. 10:42 PMBRCVadodara Jn · 10 min halt
          5. 11:57 PMGDAGodhra Jn · 2 min halt
          6. 12:47 AMDHDDahod · 2 min halt
          2:30 AM+1 dayRTMRatlam Jn
        2. Change at Ratlam

          • Same station, no local travel
          • Safety buffer: 220 min (3 h 40 min) Total wait: 220 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Ratlam?

          Find a room near Ratlam Jn
        3. 6:10 AM+1 dayRTMRatlam Jn

          Train19569Okha Varanasi Express

          Starts from Okha (OKHA) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 2

          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Varanasi Jn (BSB) at Fri, 20 Nov 05:00

          Runs: Daily · Running days not verified — check before booking

          Indian Railways · 13 h 45 min · 859 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹225SL ₹4353A ₹1,1452A ₹1,615(est.)

          6 stops — Show or hide intermediate stops
          1. 7:10 AMNADNagda Jn · 2 min halt
          2. 9:50 AMKOTAKota Jn · 10 min halt
          3. 11:15 AMSWMSawai Madhopur · 5 min halt
          4. 12:23 PMGGCGangapur City · 2 min halt
          5. 3:50 PMAFAgra Fort · 10 min halt
          6. 4:50 PMTDLTundla Jn · 5 min halt
          7:55 PM+1 dayCNBKanpur Central
        4. Change at Kanpur

          • Same station, no local travel
          • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min
        5. 11:05 PM+1 dayCNBKanpur Central

          Train12304Poorva Express

          Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

          Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

          Runs: Sun, Wed, Thu, Sat

          Indian Railways · 11 h 50 min · 738 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹210SL ₹4103A ₹1,0452A ₹1,4551A ₹2,405(est.)

          11 stops — Show or hide intermediate stops
          1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
          2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
          3. 5:03 AMBXRBuxar · 2 min halt
          4. 5:45 AMARAAra · 5 min halt
          5. 6:22 AMDNRDanapur · 2 min halt
          6. 6:48 AMPNBEPatna Jn · 7 min halt
          7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
          8. 7:49 AMBARHBarh · 2 min halt
          9. 8:10 AMMKAMokama · 2 min halt
          10. 9:08 AMKIULKiul Jn · 2 min halt
          11. 9:39 AMJMUJamui · 2 min halt
          10:55 AM+2 daysJAJJhajha
      3. Option 4: 7:35 PM2:25 PM+2 days

        42 h 50 min2 changesSmallest buffer: 220 minfrom ₹575 (est.)

        via Ratlam · Kanpur

        1. 7:35 PMVAPIVapi

          Train12995Ajmer SF Express

          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:05 (5:05 PM) · you board on day 1

          Ends at Ajmer Jn (AII) at Thu, 19 Nov 10:05

          Runs: Sun, Wed, Fri

          Indian Railways · 6 h 55 min · 486 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹150SL ₹3003A ₹7452A ₹1,025(est.)

          6 stops — Show or hide intermediate stops
          1. 7:58 PMBLValsad · 2 min halt
          2. 9:05 PMSTSurat · 5 min halt
          3. 9:48 PMBHBharuch Jn · 2 min halt
          4. 10:42 PMBRCVadodara Jn · 10 min halt
          5. 11:57 PMGDAGodhra Jn · 2 min halt
          6. 12:47 AMDHDDahod · 2 min halt
          2:30 AM+1 dayRTMRatlam Jn
        2. Change at Ratlam

          • Same station, no local travel
          • Safety buffer: 220 min (3 h 40 min) Total wait: 220 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Ratlam?

          Find a room near Ratlam Jn
        3. 6:10 AM+1 dayRTMRatlam Jn

          Train19569Okha Varanasi Express

          Starts from Okha (OKHA) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 2

          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Varanasi Jn (BSB) at Fri, 20 Nov 05:00

          Runs: Daily · Running days not verified — check before booking

          Indian Railways · 13 h 45 min · 859 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹225SL ₹4353A ₹1,1452A ₹1,615(est.)

          6 stops — Show or hide intermediate stops
          1. 7:10 AMNADNagda Jn · 2 min halt
          2. 9:50 AMKOTAKota Jn · 10 min halt
          3. 11:15 AMSWMSawai Madhopur · 5 min halt
          4. 12:23 PMGGCGangapur City · 2 min halt
          5. 3:50 PMAFAgra Fort · 10 min halt
          6. 4:50 PMTDLTundla Jn · 5 min halt
          7:55 PM+1 dayCNBKanpur Central
        4. Change at Kanpur

          • Same station, no local travel
          • Safety buffer: 335 min (5 h 35 min) Total wait: 335 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Kanpur?

          Find a room near Kanpur Central
        5. 1:30 AM+2 daysCNBKanpur Central

          Train11106Pratham Swatantrata Sangram Express

          Starts from Jhansi Jn (JHS) on Thu, 19 Nov at 20:40 (8:40 PM) · you board on day 2

          This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 21:45

          Runs: Daily · Running days not verified — check before booking

          Indian Railways · 12 h 55 min · 743 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹200SL ₹3853A ₹1,005(est.)

          6 stops — Show or hide intermediate stops
          1. 3:55 AMPRYJPrayagraj Jn · 5 min halt
          2. 7:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
          3. 8:42 AMBXRBuxar · 2 min halt
          4. 9:27 AMARAAra · 2 min halt
          5. 10:40 AMPNBEPatna Jn · 10 min halt
          6. 12:38 PMKIULKiul Jn · 2 min halt
          2:25 PM+2 daysJAJJhajha

      via Varanasi · 3 routes · best 38 h 22 min

        All 3 combinations via Varanasi
        1. Option 2: 6:28 PM8:50 AM+2 days

          38 h 22 min1 changeSmallest buffer: 190 minfrom ₹480 (est.)

          via Varanasi

          • Different change city
          1. 6:28 PMVAPIVapi

            Train19049Mumbai Bandra T - Patna Exp

            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

            Runs: Daily · Running days not verified — check before booking

            Indian Railways · 29 h 2 min · 1477 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

            8 stops — Show or hide intermediate stops
            1. 7:13 PMBLValsad · 2 min halt
            2. 8:38 PMUDNUdhna Jn · 2 min halt
            3. 12:05 AMNDBNandurbar · 20 min halt
            4. 4:25 AMBSLBhusaval Jn · 5 min halt
            5. 11:11 AMNUNarsinghpur · 2 min halt
            6. 12:30 PMJBPJabalpur · 10 min halt
            7. 1:45 PMKTEKatni · 5 min halt
            8. 3:10 PMSTASatna · 10 min halt
            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
          2. Change at Varanasi

            • Same station, no local travel
            • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min

            Night-time change — plan safe waiting and local transport

            Partner link

            Long wait at Varanasi?

            Find a room near Pt. Deen Dayal Upadhyaya Jn
          3. 2:40 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

            Train12236Anand Vihar - Madhupur Humsafar Express

            Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 2

            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

            Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

            Runs: Thu

            Indian Railways · 6 h 10 min · 390 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹125SL ₹2553A ₹630(est.)

            5 stops — Show or hide intermediate stops
            1. 3:40 AMBXRBuxar · 2 min halt
            2. 4:25 AMARAAra · 2 min halt
            3. 5:13 AMPNBEPatna Jn · 7 min halt
            4. 6:21 AMMKAMokama · 2 min halt
            5. 6:50 AMKIULKiul Jn · 2 min halt
            8:50 AM+2 daysJAJJhajha
        2. Option 3: 6:28 PM9:39 AM+2 days

          39 h 11 min1 changeSmallest buffer: 255 minfrom ₹475 (est.)

          via Varanasi

          1. 6:28 PMVAPIVapi

            Train19049Mumbai Bandra T - Patna Exp

            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

            Runs: Daily · Running days not verified — check before booking

            Indian Railways · 29 h 2 min · 1477 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

            8 stops — Show or hide intermediate stops
            1. 7:13 PMBLValsad · 2 min halt
            2. 8:38 PMUDNUdhna Jn · 2 min halt
            3. 12:05 AMNDBNandurbar · 20 min halt
            4. 4:25 AMBSLBhusaval Jn · 5 min halt
            5. 11:11 AMNUNarsinghpur · 2 min halt
            6. 12:30 PMJBPJabalpur · 10 min halt
            7. 1:45 PMKTEKatni · 5 min halt
            8. 3:10 PMSTASatna · 10 min halt
            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
          2. Change at Varanasi

            • Same station, no local travel
            • Safety buffer: 255 min (4 h 15 min) Total wait: 255 min

            Night-time change — plan safe waiting and local transport

            Partner link

            Long wait at Varanasi?

            Find a room near Pt. Deen Dayal Upadhyaya Jn
          3. 3:45 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

            Train12304Poorva Express

            Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 2

            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

            Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

            Runs: Sun, Wed, Thu, Sat

            Indian Railways · 5 h 54 min · 365 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹120SL ₹2453A ₹6002A ₹8201A ₹1,340(est.)

            8 stops — Show or hide intermediate stops
            1. 5:03 AMBXRBuxar · 2 min halt
            2. 5:45 AMARAAra · 5 min halt
            3. 6:22 AMDNRDanapur · 2 min halt
            4. 6:48 AMPNBEPatna Jn · 7 min halt
            5. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
            6. 7:49 AMBARHBarh · 2 min halt
            7. 8:10 AMMKAMokama · 2 min halt
            8. 9:08 AMKIULKiul Jn · 2 min halt
            9:39 AM+2 daysJMUJamui
        3. Option 4: 6:28 PM2:25 PM+2 days

          43 h 57 min1 changeSmallest buffer: 470 minfrom ₹465 (est.)

          via Varanasi

          1. 6:28 PMVAPIVapi

            Train19049Mumbai Bandra T - Patna Exp

            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

            Runs: Daily · Running days not verified — check before booking

            Indian Railways · 29 h 2 min · 1477 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

            8 stops — Show or hide intermediate stops
            1. 7:13 PMBLValsad · 2 min halt
            2. 8:38 PMUDNUdhna Jn · 2 min halt
            3. 12:05 AMNDBNandurbar · 20 min halt
            4. 4:25 AMBSLBhusaval Jn · 5 min halt
            5. 11:11 AMNUNarsinghpur · 2 min halt
            6. 12:30 PMJBPJabalpur · 10 min halt
            7. 1:45 PMKTEKatni · 5 min halt
            8. 3:10 PMSTASatna · 10 min halt
            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
          2. Change at Varanasi

            • Same station, no local travel
            • Safety buffer: 470 min (7 h 50 min) Total wait: 470 min

            Partner link

            Long wait at Varanasi?

            Find a room near Pt. Deen Dayal Upadhyaya Jn
          3. 7:20 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

            Train11106Pratham Swatantrata Sangram Express

            Starts from Jhansi Jn (JHS) on Thu, 19 Nov at 20:40 (8:40 PM) · you board on day 2

            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

            Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 21:45

            Runs: Daily · Running days not verified — check before booking

            Indian Railways · 7 h 5 min · 395 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹110SL ₹2303A ₹590(est.)

            4 stops — Show or hide intermediate stops
            1. 8:42 AMBXRBuxar · 2 min halt
            2. 9:27 AMARAAra · 2 min halt
            3. 10:40 AMPNBEPatna Jn · 10 min halt
            4. 12:38 PMKIULKiul Jn · 2 min halt
            2:25 PM+2 daysJAJJhajha

        via Nashik · 20 routes · best 38 h 39 min

          All 20 combinations via Nashik
          1. Option 2: 7:00 PM9:39 AM+2 days

            38 h 39 min2 changesSmallest buffer: 210 minfrom ₹605 (est.)

            via Nashik · Ara

            1. 7:00 PMVapi Bus Stand

              BusState RTC (estimated) Ordinary

              State RTC (estimated) · 3 h 30 min · 139 km · Runs every 60 min

              Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

              Ordinary ₹160(est.)

              Buy at bus stand · every 60 min

              10:30 PMNashik Bus Stand
            2. Change at Nashik

              • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
              • Safety buffer: 220 min (3 h 40 min) Total wait: 255 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Nashik?

              Find a room near Nasik Road
            3. 2:45 AM+1 dayNKNasik Road

              Train12141Patliputra SF Express

              Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 2

              This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

              Runs: Daily

              Indian Railways · 23 h 35 min · 1477 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹370SL ₹7003A ₹1,8152A ₹2,5451A ₹4,225(est.)

              11 stops — Show or hide intermediate stops
              1. 3:43 AMMMRManmad Jn · 2 min halt
              2. 5:33 AMJLJalgaon Jn · 2 min halt
              3. 6:15 AMBSLBhusaval Jn · 5 min halt
              4. 10:55 AMETItarsi Jn · 10 min halt
              5. 2:20 PMJBPJabalpur · 10 min halt
              6. 5:35 PMSTASatna · 5 min halt
              7. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
              8. 12:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
              9. 1:00 AMZNAZamania · 2 min halt
              10. 1:20 AMGMRGahmar · 2 min halt
              11. 1:36 AMBXRBuxar · 2 min halt
              2:20 AM+2 daysARAAra
            4. Change at Ara

              • Same station, no local travel
              • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Ara?

              Find a room near Ara
            5. 5:50 AM+2 daysARAAra

              Train12304Poorva Express

              Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 2

              This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

              Runs: Sun, Wed, Thu, Sat

              Indian Railways · 3 h 49 min · 200 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹75SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

              6 stops — Show or hide intermediate stops
              1. 6:22 AMDNRDanapur · 2 min halt
              2. 6:48 AMPNBEPatna Jn · 7 min halt
              3. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
              4. 7:49 AMBARHBarh · 2 min halt
              5. 8:10 AMMKAMokama · 2 min halt
              6. 9:08 AMKIULKiul Jn · 2 min halt
              9:39 AM+2 daysJMUJamui
          2. Option 3: 7:00 PM9:39 AM+2 days

            38 h 39 min2 changesSmallest buffer: 202 minfrom ₹625 (est.)

            via Nashik · Prayagraj

            1. 7:00 PMVapi Bus Stand

              BusState RTC (estimated) Ordinary

              State RTC (estimated) · 3 h 30 min · 139 km · Runs every 60 min

              Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

              Ordinary ₹160(est.)

              Buy at bus stand · every 60 min

              10:30 PMNashik Bus Stand
            2. Change at Nashik

              • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
              • Safety buffer: 220 min (3 h 40 min) Total wait: 255 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Nashik?

              Find a room near Nasik Road
            3. 2:45 AM+1 dayNKNasik Road

              Train12141Patliputra SF Express

              Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 2

              This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

              Runs: Daily

              Indian Railways · 18 h 33 min · 1169 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹310SL ₹5903A ₹1,5202A ₹2,1301A ₹3,530(est.)

              6 stops — Show or hide intermediate stops
              1. 3:43 AMMMRManmad Jn · 2 min halt
              2. 5:33 AMJLJalgaon Jn · 2 min halt
              3. 6:15 AMBSLBhusaval Jn · 5 min halt
              4. 10:55 AMETItarsi Jn · 10 min halt
              5. 2:20 PMJBPJabalpur · 10 min halt
              6. 5:35 PMSTASatna · 5 min halt
              9:18 PM+1 dayPCOIPrayagraj Chheoki
            4. Change at Prayagraj

              • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
              • Safety buffer: 202 min (3 h 22 min) Total wait: 242 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Prayagraj?

              Find a room near Prayagraj Jn
            5. 1:20 AM+2 daysPRYJPrayagraj Jn

              Train12304Poorva Express

              Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 2

              This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

              Runs: Sun, Wed, Thu, Sat

              Indian Railways · 8 h 19 min · 517 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹155SL ₹3153A ₹7802A ₹1,0801A ₹1,775(est.)

              9 stops — Show or hide intermediate stops
              1. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
              2. 5:03 AMBXRBuxar · 2 min halt
              3. 5:45 AMARAAra · 5 min halt
              4. 6:22 AMDNRDanapur · 2 min halt
              5. 6:48 AMPNBEPatna Jn · 7 min halt
              6. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
              7. 7:49 AMBARHBarh · 2 min halt
              8. 8:10 AMMKAMokama · 2 min halt
              9. 9:08 AMKIULKiul Jn · 2 min halt
              9:39 AM+2 daysJMUJamui
          3. Option 4: 7:00 PM9:49 AM+2 days

            38 h 49 min2 changesSmallest buffer: 220 minfrom ₹840 (est.)

            via Nashik · Patna

            1. 7:00 PMVapi Bus Stand

              BusState RTC (estimated) Ordinary

              State RTC (estimated) · 3 h 30 min · 139 km · Runs every 60 min

              Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

              Ordinary ₹160(est.)

              Buy at bus stand · every 60 min

              10:30 PMNashik Bus Stand
            2. Change at Nashik

              • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
              • Safety buffer: 220 min (3 h 40 min) Total wait: 255 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Nashik?

              Find a room near Nasik Road
            3. 2:45 AM+1 dayNKNasik Road

              Train12141Patliputra SF Express

              Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 2

              This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

              Runs: Daily

              Indian Railways · 24 h 14 min · 1517 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹380SL ₹7153A ₹1,8502A ₹2,6001A ₹4,315(est.)

              12 stops — Show or hide intermediate stops
              1. 3:43 AMMMRManmad Jn · 2 min halt
              2. 5:33 AMJLJalgaon Jn · 2 min halt
              3. 6:15 AMBSLBhusaval Jn · 5 min halt
              4. 10:55 AMETItarsi Jn · 10 min halt
              5. 2:20 PMJBPJabalpur · 10 min halt
              6. 5:35 PMSTASatna · 5 min halt
              7. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
              8. 12:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
              9. 1:00 AMZNAZamania · 2 min halt
              10. 1:20 AMGMRGahmar · 2 min halt
              11. 1:36 AMBXRBuxar · 2 min halt
              12. 2:20 AMARAAra · 5 min halt
              2:59 AM+2 daysDNRDanapur
            4. Change at Patna

              • Local transit: 35 min · Danapur (DNR) → Patna Jn (PNBE)
              • Safety buffer: 266 min (4 h 26 min) Total wait: 301 min

              Night-time change — plan safe waiting and local transport

              Partner link

              Long wait at Patna?

              Find a room near Patna Jn
            5. 8:00 AM+2 daysPNBEPatna Jn

              Train22348Patna - Howrah Vande Bharat Express

              Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:00 (8:00 AM) · you board on day 1

              Ends at Howrah Jn (HWH) at Fri, 20 Nov 14:35

              Runs: Sun, Mon, Tue, Thu, Fri, Sat

              Indian Railways · 1 h 49 min · 151 km

              Scheduled timetable. From the published timetable. Delays are possible.

              CC ₹300(est.)

              4 stops — Show or hide intermediate stops
              1. 8:13 AMPNCPatna Saheb · 2 min halt
              2. 8:36 AMBKPBakhtiyarpur Jn · 2 min halt
              3. 9:03 AMMKAMokama · 2 min halt
              4. 9:28 AMLKRLuckeesarai Jn · 2 min halt
              9:49 AM+2 daysJMUJamui
          Search another date

          via Surat · 15 routes · best 38 h 39 min

            All 15 combinations via Surat
            1. Option 2: 7:00 PM9:39 AM+2 days

              38 h 39 min2 changesSmallest buffer: 199 minfrom ₹650 (est.)

              via Surat · Delhi

              1. 7:00 PMVAPIVapi

                Train22989Mahuva SF Express

                Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 16:45 (4:45 PM) · you board on day 1

                Ends at Mahuva Jn (MHV) at Thu, 19 Nov 08:30

                Runs: Wed, Fri

                Indian Railways · 1 h 23 min · 95 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹45SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                8:23 PMSTSurat
              2. Change at Surat

                • Same station, no local travel
                • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
              3. 11:53 PMSTSurat

                Train12449Goa Sampark Kranti Express

                Starts from Madgaon (MAO) on Wed, 18 Nov at 10:40 (10:40 AM) · you board on day 1

                Ends at Chandigarh (CDG) at Thu, 19 Nov 18:25

                Runs: Tue, Wed

                Indian Railways · 13 h 48 min · 1118 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹300SL ₹5703A ₹1,4702A ₹2,0601A ₹3,415(est.)

                3 stops — Show or hide intermediate stops
                1. 1:20 AMBRCVadodara Jn · 10 min halt
                2. 5:00 AMRTMRatlam Jn · 5 min halt
                3. 8:10 AMKOTAKota Jn · 10 min halt
                1:41 PM+1 dayNZMHazrat Nizamuddin Jn
              4. Change at Delhi

                • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → New Delhi (NDLS)
                • Safety buffer: 199 min (3 h 19 min) Total wait: 239 min

                Station change — you must travel to a different station or bus stand

              5. 5:40 PM+1 dayNDLSNew Delhi

                Train12304Poorva Express

                Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                Runs: Sun, Wed, Thu, Sat

                Indian Railways · 15 h 59 min · 1152 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹305SL ₹5853A ₹1,5052A ₹2,1051A ₹3,490(est.)

                14 stops — Show or hide intermediate stops
                1. 7:13 PMALJNAligarh Jn · 2 min halt
                2. 8:13 PMTDLTundla Jn · 2 min halt
                3. 9:08 PMETWEtawah · 2 min halt
                4. 10:55 PMCNBKanpur Central · 10 min halt
                5. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                6. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                7. 5:03 AMBXRBuxar · 2 min halt
                8. 5:45 AMARAAra · 5 min halt
                9. 6:22 AMDNRDanapur · 2 min halt
                10. 6:48 AMPNBEPatna Jn · 7 min halt
                11. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                12. 7:49 AMBARHBarh · 2 min halt
                13. 8:10 AMMKAMokama · 2 min halt
                14. 9:08 AMKIULKiul Jn · 2 min halt
                9:39 AM+2 daysJMUJamui
            2. Option 3: 5:42 PM8:50 AM+2 days

              39 h 8 min2 changesSmallest buffer: 220 minfrom ₹755 (est.)

              via Surat · Kanpur

              1. 5:42 PMVAPIVapi

                Train22961Mumbai Central - Ahmedabad Vande Bharat Express

                Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                Ends at Ahmedabad Jn (ADI) at Wed, 18 Nov 21:15

                Runs: Mon, Tue, Wed, Thu, Fri, Sat

                Indian Railways · 56 min · 95 km

                Scheduled timetable. From the published timetable. Delays are possible.

                CC ₹220EC ₹410(est.)

                6:38 PMSTSurat
              2. Change at Surat

                • Local transit: 40 min · Surat (ST) → Bhestan (BHET)
                • Safety buffer: 220 min (3 h 40 min) Total wait: 260 min

                Station change — you must travel to a different station or bus stand

                Partner link

                Long wait at Surat?

                Find a room near Bhestan
              3. 10:58 PMBHETBhestan

                Train12943Udyogkarmi SF Express

                Starts from Valsad (BL) on Wed, 18 Nov at 22:20 (10:20 PM) · you board on day 1

                Ends at Kanpur Central (CNB) at Thu, 19 Nov 18:25

                Runs: Wed

                Indian Railways · 19 h 27 min · 1245 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹325SL ₹6203A ₹1,5952A ₹2,230(est.)

                10 stops — Show or hide intermediate stops
                1. 1:20 AMNDBNandurbar · 5 min halt
                2. 3:42 AMJLJalgaon Jn · 3 min halt
                3. 4:15 AMBSLBhusaval Jn · 5 min halt
                4. 6:32 AMKNWKhandwa · 3 min halt
                5. 8:40 AMETItarsi Jn · 5 min halt
                6. 10:30 AMBPLBhopal Jn · 5 min halt
                7. 12:17 PMBINABina Jn · 5 min halt
                8. 2:05 PMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                9. 3:28 PMORAIOrai · 5 min halt
                10. 4:08 PMPHNPokhrayan · 2 min halt
                6:25 PM+1 dayCNBKanpur Central
              4. Change at Kanpur

                • Same station, no local travel
                • Safety buffer: 232 min (3 h 52 min) Total wait: 232 min
              5. 10:17 PM+1 dayCNBKanpur Central

                Train12236Anand Vihar - Madhupur Humsafar Express

                Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                Runs: Thu

                Indian Railways · 10 h 33 min · 738 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹210SL ₹4103A ₹1,045(est.)

                7 stops — Show or hide intermediate stops
                1. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                2. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                3. 3:40 AMBXRBuxar · 2 min halt
                4. 4:25 AMARAAra · 2 min halt
                5. 5:13 AMPNBEPatna Jn · 7 min halt
                6. 6:21 AMMKAMokama · 2 min halt
                7. 6:50 AMKIULKiul Jn · 2 min halt
                8:50 AM+2 daysJAJJhajha
            3. Option 4: 2:15 AM5:40 PM+1 day

              39 h 25 min2 changesSmallest buffer: 206 minfrom ₹490 (est.)

              via Surat · Bhusawal

              1. 2:15 AMVAPIVapi

                Train09011Bhuj Special Fare SF Special

                Starts from Bandra Terminus (BDTS) on Tue, 17 Nov at 23:55 (11:55 PM) · you board on day 2

                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                Ends at Bhuj (BHUJ) at Wed, 18 Nov 14:30

                Runs: Tue

                Indian Railways · 1 h 4 min · 95 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹30SL ₹1303A ₹475(est.)

                3:19 AMSTSurat
              2. Change at Surat

                • Local transit: 25 min · Surat (ST) → Udhna Jn (UDN)
                • Safety buffer: 206 min (3 h 26 min) Total wait: 231 min

                Night-time change — plan safe waiting and local transport

                Partner link

                Long wait at Surat?

                Find a room near Udhna Jn
              3. 7:10 AMUDNUdhna Jn

                Train19021Udhna - Brahmapur Amrit Bharat Express

                Starts from Udhna Jn (UDN) on Wed, 18 Nov at 07:10 (7:10 AM) · you board on day 1

                Ends at Brahmapur (BAM) at Thu, 19 Nov 13:55

                Runs: Daily

                Indian Railways · 5 h 50 min · 331 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹95SL ₹200(est.)

                9 stops — Show or hide intermediate stops
                1. 7:28 AMBIYBardoli · 2 min halt
                2. 7:53 AMVYAVyara · 2 min halt
                3. 8:28 AMNWUNavapur · 2 min halt
                4. 9:35 AMNDBNandurbar · 5 min halt
                5. 10:03 AMDDEDondaicha · 2 min halt
                6. 10:23 AMSNKSindkheda · 2 min halt
                7. 11:03 AMANAmalner · 2 min halt
                8. 11:38 AMDXGDharangaon · 2 min halt
                9. 12:32 PMJLJalgaon Jn · 3 min halt
                1:00 PMBSLBhusaval Jn
              4. Change at Bhusawal

                • Same station, no local travel
                • Safety buffer: 300 min (5 h) Total wait: 300 min

                Partner link

                Long wait at Bhusawal?

                Find a room near Bhusaval Jn
              5. 6:00 PMBSLBhusaval Jn

                Train12362Asansol SF Express

                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                Runs: Wed

                Indian Railways · 23 h 40 min · 1446 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹365SL ₹6903A ₹1,7852A ₹2,500(est.)

                11 stops — Show or hide intermediate stops
                1. 7:57 PMKNWKhandwa · 3 min halt
                2. 10:25 PMETItarsi Jn · 10 min halt
                3. 1:25 AMJBPJabalpur · 10 min halt
                4. 2:55 AMKTEKatni · 5 min halt
                5. 4:25 AMSTASatna · 5 min halt
                6. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                7. 8:45 AMMZPMirzapur · 5 min halt
                8. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                9. 11:25 AMBXRBuxar · 2 min halt
                10. 1:28 PMPNBEPatna Jn · 7 min halt
                11. 4:00 PMKIULKiul Jn · 2 min halt
                5:40 PM+1 dayJAJJhajha
            Search another date

            via Mathura · 2 routes · best 38 h 44 min

              All 2 combinations via Mathura
              1. Option 2: 6:55 PM9:39 AM+2 days

                38 h 44 min2 changesSmallest buffer: 285 minfrom ₹2,055 (est.)

                via Mathura · Agra

                1. 6:55 PMVAPIVapi

                  Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

                  Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

                  Runs: Daily

                  Indian Railways · 12 h 58 min · 1079 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  3A ₹1,7752A ₹2,4851A ₹4,125(est.)

                  8 stops — Show or hide intermediate stops
                  1. 7:13 PMBLValsad · 2 min halt
                  2. 8:10 PMSTSurat · 5 min halt
                  3. 8:53 PMBHBharuch Jn · 2 min halt
                  4. 9:44 PMBRCVadodara Jn · 10 min halt
                  5. 11:38 PMDHDDahod · 2 min halt
                  6. 1:13 AMRTMRatlam Jn · 2 min halt
                  7. 4:05 AMKOTAKota Jn · 10 min halt
                  8. 5:23 AMSWMSawai Madhopur · 2 min halt
                  7:53 AM+1 dayMTJMathura Jn
                2. Change at Mathura

                  • Same station, no local travel
                  • Safety buffer: 317 min (5 h 17 min) Total wait: 317 min

                  Partner link

                  Long wait at Mathura?

                  Find a room near Mathura Jn
                3. 1:10 PM+1 dayMTJMathura Jn

                  Train19326Indore SF Express

                  Starts from Amritsar Jn (ASR) on Thu, 19 Nov at 01:50 (1:50 AM) · you board on day 1

                  Ends at Indore Jn (INDB) at Fri, 20 Nov 00:55

                  Runs: Sun, Thu

                  Indian Railways · 45 min · 54 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹15SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                  1 stop — Show or hide intermediate stops
                  1. 1:43 PMRKMRaja KI Mandi · 2 min halt
                  1:55 PM+1 dayAGCAgra Cantt
                4. Change at Agra

                  • Local transit: 95 min · Agra Cantt (AGC) → Tundla Jn (TDL)
                  • Safety buffer: 285 min (4 h 45 min) Total wait: 380 min

                  Station change — you must travel to a different station or bus stand

                  Partner link

                  Long wait at Agra?

                  Find a room near Tundla Jn
                5. 8:15 PM+1 dayTDLTundla Jn

                  Train12304Poorva Express

                  Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                  Runs: Sun, Wed, Thu, Sat

                  Indian Railways · 13 h 24 min · 943 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹265SL ₹5053A ₹1,2902A ₹1,8051A ₹2,990(est.)

                  12 stops — Show or hide intermediate stops
                  1. 9:08 PMETWEtawah · 2 min halt
                  2. 10:55 PMCNBKanpur Central · 10 min halt
                  3. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                  4. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                  5. 5:03 AMBXRBuxar · 2 min halt
                  6. 5:45 AMARAAra · 5 min halt
                  7. 6:22 AMDNRDanapur · 2 min halt
                  8. 6:48 AMPNBEPatna Jn · 7 min halt
                  9. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                  10. 7:49 AMBARHBarh · 2 min halt
                  11. 8:10 AMMKAMokama · 2 min halt
                  12. 9:08 AMKIULKiul Jn · 2 min halt
                  9:39 AM+2 daysJMUJamui
              2. Option 3: 6:55 PM10:55 AM+2 days

                40 h2 changesSmallest buffer: 285 minfrom ₹2,060 (est.)

                via Mathura · Agra

                1. 6:55 PMVAPIVapi

                  Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

                  Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

                  Runs: Daily

                  Indian Railways · 12 h 58 min · 1079 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  3A ₹1,7752A ₹2,4851A ₹4,125(est.)

                  8 stops — Show or hide intermediate stops
                  1. 7:13 PMBLValsad · 2 min halt
                  2. 8:10 PMSTSurat · 5 min halt
                  3. 8:53 PMBHBharuch Jn · 2 min halt
                  4. 9:44 PMBRCVadodara Jn · 10 min halt
                  5. 11:38 PMDHDDahod · 2 min halt
                  6. 1:13 AMRTMRatlam Jn · 2 min halt
                  7. 4:05 AMKOTAKota Jn · 10 min halt
                  8. 5:23 AMSWMSawai Madhopur · 2 min halt
                  7:53 AM+1 dayMTJMathura Jn
                2. Change at Mathura

                  • Same station, no local travel
                  • Safety buffer: 317 min (5 h 17 min) Total wait: 317 min

                  Partner link

                  Long wait at Mathura?

                  Find a room near Mathura Jn
                3. 1:10 PM+1 dayMTJMathura Jn

                  Train19326Indore SF Express

                  Starts from Amritsar Jn (ASR) on Thu, 19 Nov at 01:50 (1:50 AM) · you board on day 1

                  Ends at Indore Jn (INDB) at Fri, 20 Nov 00:55

                  Runs: Sun, Thu

                  Indian Railways · 45 min · 54 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹15SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                  1 stop — Show or hide intermediate stops
                  1. 1:43 PMRKMRaja KI Mandi · 2 min halt
                  1:55 PM+1 dayAGCAgra Cantt
                4. Change at Agra

                  • Local transit: 95 min · Agra Cantt (AGC) → Tundla Jn (TDL)
                  • Safety buffer: 285 min (4 h 45 min) Total wait: 380 min

                  Station change — you must travel to a different station or bus stand

                  Partner link

                  Long wait at Agra?

                  Find a room near Tundla Jn
                5. 8:15 PM+1 dayTDLTundla Jn

                  Train12304Poorva Express

                  Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                  Runs: Sun, Wed, Thu, Sat

                  Indian Railways · 14 h 40 min · 969 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹270SL ₹5153A ₹1,3252A ₹1,8451A ₹3,060(est.)

                  13 stops — Show or hide intermediate stops
                  1. 9:08 PMETWEtawah · 2 min halt
                  2. 10:55 PMCNBKanpur Central · 10 min halt
                  3. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                  4. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                  5. 5:03 AMBXRBuxar · 2 min halt
                  6. 5:45 AMARAAra · 5 min halt
                  7. 6:22 AMDNRDanapur · 2 min halt
                  8. 6:48 AMPNBEPatna Jn · 7 min halt
                  9. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                  10. 7:49 AMBARHBarh · 2 min halt
                  11. 8:10 AMMKAMokama · 2 min halt
                  12. 9:08 AMKIULKiul Jn · 2 min halt
                  13. 9:39 AMJMUJamui · 2 min halt
                  10:55 AM+2 daysJAJJhajha

              via Valsad · 8 routes · best 38 h 45 min

                All 8 combinations via Valsad
                1. Option 2: 6:05 PM8:50 AM+2 days

                  38 h 45 min2 changesSmallest buffer: 202 minfrom ₹555 (est.)

                  via Valsad · Kanpur

                  1. 6:05 PMUVDUdvada

                    Train19417Borivali - Vatva Express

                    Starts from Borivali (BVI) on Wed, 18 Nov at 13:40 (1:40 PM) · you board on day 1

                    Ends at Vatva (VTA) at Thu, 19 Nov 02:45

                    Runs: Daily

                    Indian Railways · 8 min · 5 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹5SL ₹130(est.)

                    6:13 PMPADPardi
                  2. Change at Valsad

                    • Local transit: 45 min · Pardi (PAD) → Valsad (BL)
                    • Safety buffer: 202 min (3 h 22 min) Total wait: 247 min

                    Station change — you must travel to a different station or bus stand

                    Partner link

                    Long wait at Valsad?

                    Find a room near Valsad
                  3. 10:20 PMBLValsad

                    Train12943Udyogkarmi SF Express

                    Starts from Valsad (BL) on Wed, 18 Nov at 22:20 (10:20 PM) · you board on day 1

                    Ends at Kanpur Central (CNB) at Thu, 19 Nov 18:25

                    Runs: Wed

                    Indian Railways · 20 h 5 min · 1304 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹340SL ₹6403A ₹1,6502A ₹2,310(est.)

                    11 stops — Show or hide intermediate stops
                    1. 10:53 PMBHETBhestan · 5 min halt
                    2. 1:20 AMNDBNandurbar · 5 min halt
                    3. 3:42 AMJLJalgaon Jn · 3 min halt
                    4. 4:15 AMBSLBhusaval Jn · 5 min halt
                    5. 6:32 AMKNWKhandwa · 3 min halt
                    6. 8:40 AMETItarsi Jn · 5 min halt
                    7. 10:30 AMBPLBhopal Jn · 5 min halt
                    8. 12:17 PMBINABina Jn · 5 min halt
                    9. 2:05 PMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                    10. 3:28 PMORAIOrai · 5 min halt
                    11. 4:08 PMPHNPokhrayan · 2 min halt
                    6:25 PM+1 dayCNBKanpur Central
                  4. Change at Kanpur

                    • Same station, no local travel
                    • Safety buffer: 232 min (3 h 52 min) Total wait: 232 min
                  5. 10:17 PM+1 dayCNBKanpur Central

                    Train12236Anand Vihar - Madhupur Humsafar Express

                    Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                    Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                    Runs: Thu

                    Indian Railways · 10 h 33 min · 738 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹210SL ₹4103A ₹1,045(est.)

                    7 stops — Show or hide intermediate stops
                    1. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                    2. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                    3. 3:40 AMBXRBuxar · 2 min halt
                    4. 4:25 AMARAAra · 2 min halt
                    5. 5:13 AMPNBEPatna Jn · 7 min halt
                    6. 6:21 AMMKAMokama · 2 min halt
                    7. 6:50 AMKIULKiul Jn · 2 min halt
                    8:50 AM+2 daysJAJJhajha
                2. Option 3: 6:05 PM9:39 AM+2 days

                  39 h 34 min2 changesSmallest buffer: 202 minfrom ₹550 (est.)

                  via Valsad · Kanpur

                  1. 6:05 PMUVDUdvada

                    Train19417Borivali - Vatva Express

                    Starts from Borivali (BVI) on Wed, 18 Nov at 13:40 (1:40 PM) · you board on day 1

                    Ends at Vatva (VTA) at Thu, 19 Nov 02:45

                    Runs: Daily

                    Indian Railways · 8 min · 5 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹5SL ₹130(est.)

                    6:13 PMPADPardi
                  2. Change at Valsad

                    • Local transit: 45 min · Pardi (PAD) → Valsad (BL)
                    • Safety buffer: 202 min (3 h 22 min) Total wait: 247 min

                    Station change — you must travel to a different station or bus stand

                    Partner link

                    Long wait at Valsad?

                    Find a room near Valsad
                  3. 10:20 PMBLValsad

                    Train12943Udyogkarmi SF Express

                    Starts from Valsad (BL) on Wed, 18 Nov at 22:20 (10:20 PM) · you board on day 1

                    Ends at Kanpur Central (CNB) at Thu, 19 Nov 18:25

                    Runs: Wed

                    Indian Railways · 20 h 5 min · 1304 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹340SL ₹6403A ₹1,6502A ₹2,310(est.)

                    11 stops — Show or hide intermediate stops
                    1. 10:53 PMBHETBhestan · 5 min halt
                    2. 1:20 AMNDBNandurbar · 5 min halt
                    3. 3:42 AMJLJalgaon Jn · 3 min halt
                    4. 4:15 AMBSLBhusaval Jn · 5 min halt
                    5. 6:32 AMKNWKhandwa · 3 min halt
                    6. 8:40 AMETItarsi Jn · 5 min halt
                    7. 10:30 AMBPLBhopal Jn · 5 min halt
                    8. 12:17 PMBINABina Jn · 5 min halt
                    9. 2:05 PMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                    10. 3:28 PMORAIOrai · 5 min halt
                    11. 4:08 PMPHNPokhrayan · 2 min halt
                    6:25 PM+1 dayCNBKanpur Central
                  4. Change at Kanpur

                    • Same station, no local travel
                    • Safety buffer: 280 min (4 h 40 min) Total wait: 280 min

                    Partner link

                    Long wait at Kanpur?

                    Find a room near Kanpur Central
                  5. 11:05 PM+1 dayCNBKanpur Central

                    Train12304Poorva Express

                    Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                    Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                    Runs: Sun, Wed, Thu, Sat

                    Indian Railways · 10 h 34 min · 712 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹205SL ₹4003A ₹1,0152A ₹1,4101A ₹2,330(est.)

                    10 stops — Show or hide intermediate stops
                    1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                    2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                    3. 5:03 AMBXRBuxar · 2 min halt
                    4. 5:45 AMARAAra · 5 min halt
                    5. 6:22 AMDNRDanapur · 2 min halt
                    6. 6:48 AMPNBEPatna Jn · 7 min halt
                    7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                    8. 7:49 AMBARHBarh · 2 min halt
                    9. 8:10 AMMKAMokama · 2 min halt
                    10. 9:08 AMKIULKiul Jn · 2 min halt
                    9:39 AM+2 daysJMUJamui
                3. Option 4: 6:05 PM10:55 AM+2 days

                  40 h 50 min2 changesSmallest buffer: 202 minfrom ₹555 (est.)

                  via Valsad · Kanpur

                  1. 6:05 PMUVDUdvada

                    Train19417Borivali - Vatva Express

                    Starts from Borivali (BVI) on Wed, 18 Nov at 13:40 (1:40 PM) · you board on day 1

                    Ends at Vatva (VTA) at Thu, 19 Nov 02:45

                    Runs: Daily

                    Indian Railways · 8 min · 5 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹5SL ₹130(est.)

                    6:13 PMPADPardi
                  2. Change at Valsad

                    • Local transit: 45 min · Pardi (PAD) → Valsad (BL)
                    • Safety buffer: 202 min (3 h 22 min) Total wait: 247 min

                    Station change — you must travel to a different station or bus stand

                    Partner link

                    Long wait at Valsad?

                    Find a room near Valsad
                  3. 10:20 PMBLValsad

                    Train12943Udyogkarmi SF Express

                    Starts from Valsad (BL) on Wed, 18 Nov at 22:20 (10:20 PM) · you board on day 1

                    Ends at Kanpur Central (CNB) at Thu, 19 Nov 18:25

                    Runs: Wed

                    Indian Railways · 20 h 5 min · 1304 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹340SL ₹6403A ₹1,6502A ₹2,310(est.)

                    11 stops — Show or hide intermediate stops
                    1. 10:53 PMBHETBhestan · 5 min halt
                    2. 1:20 AMNDBNandurbar · 5 min halt
                    3. 3:42 AMJLJalgaon Jn · 3 min halt
                    4. 4:15 AMBSLBhusaval Jn · 5 min halt
                    5. 6:32 AMKNWKhandwa · 3 min halt
                    6. 8:40 AMETItarsi Jn · 5 min halt
                    7. 10:30 AMBPLBhopal Jn · 5 min halt
                    8. 12:17 PMBINABina Jn · 5 min halt
                    9. 2:05 PMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                    10. 3:28 PMORAIOrai · 5 min halt
                    11. 4:08 PMPHNPokhrayan · 2 min halt
                    6:25 PM+1 dayCNBKanpur Central
                  4. Change at Kanpur

                    • Same station, no local travel
                    • Safety buffer: 280 min (4 h 40 min) Total wait: 280 min

                    Partner link

                    Long wait at Kanpur?

                    Find a room near Kanpur Central
                  5. 11:05 PM+1 dayCNBKanpur Central

                    Train12304Poorva Express

                    Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                    Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                    Runs: Sun, Wed, Thu, Sat

                    Indian Railways · 11 h 50 min · 738 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹210SL ₹4103A ₹1,0452A ₹1,4551A ₹2,405(est.)

                    11 stops — Show or hide intermediate stops
                    1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                    2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                    3. 5:03 AMBXRBuxar · 2 min halt
                    4. 5:45 AMARAAra · 5 min halt
                    5. 6:22 AMDNRDanapur · 2 min halt
                    6. 6:48 AMPNBEPatna Jn · 7 min halt
                    7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                    8. 7:49 AMBARHBarh · 2 min halt
                    9. 8:10 AMMKAMokama · 2 min halt
                    10. 9:08 AMKIULKiul Jn · 2 min halt
                    11. 9:39 AMJMUJamui · 2 min halt
                    10:55 AM+2 daysJAJJhajha
                Search another date

                via Mumbai · 49 routes · best 38 h 53 min

                  All 49 combinations via Mumbai
                  1. Option 2: 4:27 AM7:20 PM+1 day

                    38 h 53 min2 changesSmallest buffer: 180 minfrom ₹470 (est.)

                    via Mumbai · Lakhisarai

                    1. 4:27 AMSJNSanjan

                      Train59460Veraval Mumbai Central Passenger Express

                      Starts from Veraval (VRL) on Tue, 17 Nov at 13:20 (1:20 PM) · you board on day 2

                      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Mumbai Central (BCT) at Wed, 18 Nov 07:40

                      Runs: Daily · Running days not verified — check before booking

                      Indian Railways · 2 h 1 min · 129 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹20(est.)

                      23 stops — Show or hide intermediate stops
                      1. 4:31 AMUBRUmbargam Road
                      2. 4:34 AMBRRDBordi Road
                      3. 4:38 AMGVDGholvad
                      4. 4:45 AMDRDDahanu Road
                      5. 4:54 AMVGNVangaon
                      6. 5:01 AMBORBoisar
                      7. 5:04 AMUOIUmroli
                      8. 5:10 AMPLGPalghar · 2 min halt
                      9. 5:20 AMKLVKelva Road
                      10. 5:27 AMSAHSaphale
                      11. 5:35 AMVTNVaitarana
                      12. 5:43 AMVRVirar
                      13. 5:47 AMNSPNalla Sopara
                      14. 5:52 AMBSRVasai Road
                      15. 5:55 AMNIGNaigaon
                      16. 6:00 AMBYRBhayandar
                      17. 6:03 AMMIRAMira Road
                      18. 6:07 AMDICDahisar
                      19. 6:09 AMBVIBorivali · 2 min halt
                      20. 6:15 AMKILEKandivli
                      21. 6:17 AMMDDMalad
                      22. 6:21 AMGMNGoregaon
                      23. 6:25 AMJOSJogeshwari
                      6:28 AMADHAndheri
                    2. Change at Mumbai

                      • Local transit: 50 min · Andheri (ADH) → Dadar (DR)
                      • Safety buffer: 242 min (4 h 2 min) Total wait: 292 min

                      Station change — you must travel to a different station or bus stand

                      Partner link

                      Long wait at Mumbai?

                      Find a room near Dadar
                    3. 11:20 AMDRDadar

                      Train12362Asansol SF Express

                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                      Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                      Runs: Wed

                      Indian Railways · 28 h 40 min · 1827 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹440SL ₹8303A ₹2,1452A ₹3,015(est.)

                      13 stops — Show or hide intermediate stops
                      1. 11:57 AMKYNKalyan Jn · 3 min halt
                      2. 3:33 PMMMRManmad Jn · 2 min halt
                      3. 5:55 PMBSLBhusaval Jn · 5 min halt
                      4. 7:57 PMKNWKhandwa · 3 min halt
                      5. 10:25 PMETItarsi Jn · 10 min halt
                      6. 1:25 AMJBPJabalpur · 10 min halt
                      7. 2:55 AMKTEKatni · 5 min halt
                      8. 4:25 AMSTASatna · 5 min halt
                      9. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                      10. 8:45 AMMZPMirzapur · 5 min halt
                      11. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                      12. 11:25 AMBXRBuxar · 2 min halt
                      13. 1:28 PMPNBEPatna Jn · 7 min halt
                      4:00 PM+1 dayKIULKiul Jn
                    4. Change at Lakhisarai

                      • Same station, no local travel
                      • Safety buffer: 180 min (3 h) Total wait: 180 min
                    5. 7:00 PM+1 dayKIULKiul Jn

                      Train13022Mithila Express

                      Starts from Raxaul Jn (RXL) on Thu, 19 Nov at 10:10 (10:10 AM) · you board on day 1

                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:00

                      Runs: Daily

                      Indian Railways · 20 min · 27 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹10SL ₹1303A ₹4752A ₹665(est.)

                      7:20 PM+1 dayJMUJamui
                  2. Option 3: 1:40 AM4:55 PM+1 day

                    39 h 15 min2 changesSmallest buffer: 190 minfrom ₹545 (est.)

                    via Mumbai · Varanasi

                    1. 1:40 AMVAPIVapi

                      Train22946Saurashtra Mail

                      Starts from Okha (OKHA) on Tue, 17 Nov at 11:05 (11:05 AM) · you board on day 2

                      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Mumbai Central (MMCT) at Wed, 18 Nov 04:55

                      Runs: Daily

                      Indian Railways · 2 h 30 min · 163 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹60SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                      2 stops — Show or hide intermediate stops
                      1. 2:38 AMPLGPalghar · 2 min halt
                      2. 3:30 AMBVIBorivali · 5 min halt
                      4:10 AMDDRDadar
                    2. Change at Mumbai

                      • Local transit: 35 min · Dadar (DDR) → Mumbai Ltt (LTT)
                      • Safety buffer: 190 min (3 h 10 min) Total wait: 225 min

                      Night-time change — plan safe waiting and local transport

                      Partner link

                      Long wait at Mumbai?

                      Find a room near Mumbai Ltt
                    3. 7:55 AMLTTMumbai Ltt

                      Train22554Mumbai Ltt - Raxaul Antyodaya Express

                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                      Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                      Runs: Wed

                      Indian Railways · 23 h 3 min · 1481 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹375SL ₹7053A ₹1,8152A ₹2,5501A ₹4,230(est.)

                      10 stops — Show or hide intermediate stops
                      1. 8:32 AMKYNKalyan Jn · 3 min halt
                      2. 11:48 AMMMRManmad Jn · 2 min halt
                      3. 2:10 PMBSLBhusaval Jn · 5 min halt
                      4. 4:12 PMKNWKhandwa · 3 min halt
                      5. 6:40 PMETItarsi Jn · 10 min halt
                      6. 10:30 PMJBPJabalpur · 10 min halt
                      7. 11:50 PMKTEKatni · 5 min halt
                      8. 1:05 AMSTASatna · 5 min halt
                      9. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                      10. 5:20 AMMZPMirzapur · 5 min halt
                      6:58 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                    4. Change at Varanasi

                      • Same station, no local travel
                      • Safety buffer: 222 min (3 h 42 min) Total wait: 222 min
                    5. 10:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                      Train04054Howrah Special Fare Puja Special

                      Starts from New Delhi (NDLS) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 2

                      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Howrah Jn (HWH) at Thu, 19 Nov 23:40

                      Runs: Mon, Wed, Sat

                      Indian Railways · 6 h 15 min · 390 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹110SL ₹2253A ₹585(est.)

                      5 stops — Show or hide intermediate stops
                      1. 11:40 AMBXRBuxar · 2 min halt
                      2. 12:25 PMARAAra · 2 min halt
                      3. 1:25 PMPNBEPatna Jn · 10 min halt
                      4. 2:13 PMBKPBakhtiyarpur Jn · 2 min halt
                      5. 3:43 PMKIULKiul Jn · 2 min halt
                      4:55 PM+1 dayJAJJhajha
                  3. Option 4: 1:40 AM4:55 PM+1 day

                    39 h 15 min2 changesSmallest buffer: 180 minfrom ₹525 (est.)

                    via Mumbai · Patna

                    1. 1:40 AMVAPIVapi

                      Train22946Saurashtra Mail

                      Starts from Okha (OKHA) on Tue, 17 Nov at 11:05 (11:05 AM) · you board on day 2

                      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Mumbai Central (MMCT) at Wed, 18 Nov 04:55

                      Runs: Daily

                      Indian Railways · 2 h 30 min · 163 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹60SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                      2 stops — Show or hide intermediate stops
                      1. 2:38 AMPLGPalghar · 2 min halt
                      2. 3:30 AMBVIBorivali · 5 min halt
                      4:10 AMDDRDadar
                    2. Change at Mumbai

                      • Local transit: 35 min · Dadar (DDR) → Mumbai Ltt (LTT)
                      • Safety buffer: 190 min (3 h 10 min) Total wait: 225 min

                      Night-time change — plan safe waiting and local transport

                      Partner link

                      Long wait at Mumbai?

                      Find a room near Mumbai Ltt
                    3. 7:55 AMLTTMumbai Ltt

                      Train22554Mumbai Ltt - Raxaul Antyodaya Express

                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                      Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                      Runs: Wed

                      Indian Railways · 26 h 5 min · 1692 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹415SL ₹7803A ₹2,0152A ₹2,8351A ₹4,705(est.)

                      11 stops — Show or hide intermediate stops
                      1. 8:32 AMKYNKalyan Jn · 3 min halt
                      2. 11:48 AMMMRManmad Jn · 2 min halt
                      3. 2:10 PMBSLBhusaval Jn · 5 min halt
                      4. 4:12 PMKNWKhandwa · 3 min halt
                      5. 6:40 PMETItarsi Jn · 10 min halt
                      6. 10:30 PMJBPJabalpur · 10 min halt
                      7. 11:50 PMKTEKatni · 5 min halt
                      8. 1:05 AMSTASatna · 5 min halt
                      9. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                      10. 5:20 AMMZPMirzapur · 5 min halt
                      11. 6:58 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                      10:00 AM+1 dayPPTAPatliputra
                    4. Change at Patna

                      • Local transit: 35 min · Patliputra (PPTA) → Patna Jn (PNBE)
                      • Safety buffer: 180 min (3 h) Total wait: 215 min

                      Station change — you must travel to a different station or bus stand

                    5. 1:35 PM+1 dayPNBEPatna Jn

                      Train04054Howrah Special Fare Puja Special

                      Starts from New Delhi (NDLS) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 2

                      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Howrah Jn (HWH) at Thu, 19 Nov 23:40

                      Runs: Mon, Wed, Sat

                      Indian Railways · 3 h 20 min · 176 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹50SL ₹1303A ₹475(est.)

                      2 stops — Show or hide intermediate stops
                      1. 2:13 PMBKPBakhtiyarpur Jn · 2 min halt
                      2. 3:43 PMKIULKiul Jn · 2 min halt
                      4:55 PM+1 dayJAJJhajha
                  Search another date

                  via Bhusawal · 1 route · best 39 h 3 min

                    All 1 combinations via Bhusawal
                    1. Option 2: 2:37 AM5:40 PM+1 day

                      39 h 3 min1 changeSmallest buffer: 360 minfrom ₹480 (est.)

                      via Bhusawal

                      • Different change city
                      1. 2:37 AMVAPIVapi

                        Train19003Khandesh Express

                        Starts from Dadar (DDR) on Wed, 18 Nov at 00:05 (12:05 AM) · you board on day 1

                        Ends at Bhusaval Jn (BSL) at Wed, 18 Nov 12:00

                        Runs: Sun, Mon, Tue, Wed, Thu, Sat

                        Indian Railways · 9 h 23 min · 418 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹115SL ₹2403A ₹6152A ₹8651A ₹1,415(est.)

                        14 stops — Show or hide intermediate stops
                        1. 3:00 AMBLValsad · 2 min halt
                        2. 3:41 AMNVSNavsari · 2 min halt
                        3. 4:12 AMBHETBhestan · 5 min halt
                        4. 4:49 AMCHMChalthan · 1 min halt
                        5. 5:18 AMBIYBardoli · 2 min halt
                        6. 5:46 AMVYAVyara · 2 min halt
                        7. 6:23 AMNWUNavapur · 2 min halt
                        8. 7:25 AMNDBNandurbar · 5 min halt
                        9. 7:58 AMDDEDondaicha · 2 min halt
                        10. 8:18 AMSNKSindkheda · 2 min halt
                        11. 8:33 AMNDNNardana · 2 min halt
                        12. 9:10 AMANAmalner · 2 min halt
                        13. 10:39 AMDXGDharangaon · 2 min halt
                        14. 11:20 AMJLJalgaon Jn · 3 min halt
                        12:00 PMBSLBhusaval Jn
                      2. Change at Bhusawal

                        • Same station, no local travel
                        • Safety buffer: 360 min (6 h) Total wait: 360 min

                        Partner link

                        Long wait at Bhusawal?

                        Find a room near Bhusaval Jn
                      3. 6:00 PMBSLBhusaval Jn

                        Train12362Asansol SF Express

                        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                        Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                        Runs: Wed

                        Indian Railways · 23 h 40 min · 1446 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹365SL ₹6903A ₹1,7852A ₹2,500(est.)

                        11 stops — Show or hide intermediate stops
                        1. 7:57 PMKNWKhandwa · 3 min halt
                        2. 10:25 PMETItarsi Jn · 10 min halt
                        3. 1:25 AMJBPJabalpur · 10 min halt
                        4. 2:55 AMKTEKatni · 5 min halt
                        5. 4:25 AMSTASatna · 5 min halt
                        6. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                        7. 8:45 AMMZPMirzapur · 5 min halt
                        8. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                        9. 11:25 AMBXRBuxar · 2 min halt
                        10. 1:28 PMPNBEPatna Jn · 7 min halt
                        11. 4:00 PMKIULKiul Jn · 2 min halt
                        5:40 PM+1 dayJAJJhajha

                    via Vadodara · 3 routes · best 39 h 8 min

                      All 3 combinations via Vadodara
                      1. Option 2: 5:42 PM8:50 AM+2 days

                        39 h 8 min2 changesSmallest buffer: 232 minfrom ₹2,380 (est.)

                        via Vadodara · Delhi

                        1. 5:42 PMVAPIVapi

                          Train22961Mumbai Central - Ahmedabad Vande Bharat Express

                          Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                          Ends at Ahmedabad Jn (ADI) at Wed, 18 Nov 21:15

                          Runs: Mon, Tue, Wed, Thu, Fri, Sat

                          Indian Railways · 2 h 25 min · 224 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          CC ₹410EC ₹780(est.)

                          1 stop — Show or hide intermediate stops
                          1. 6:38 PMSTSurat · 5 min halt
                          8:07 PMBRCVadodara Jn
                        2. Change at Vadodara

                          • Same station, no local travel
                          • Safety buffer: 232 min (3 h 52 min) Total wait: 232 min
                        3. 11:59 PMBRCVadodara Jn

                          Train12431Trivandrum - Hazrat Nizamuddin Rajdhani Express

                          Starts from Thiruvananthapuram Central (TVC) on Tue, 17 Nov at 19:15 (7:15 PM) · you board on day 2

                          This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                          Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 12:30

                          Runs: Tue, Thu, Fri

                          Indian Railways · 12 h 31 min · 989 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          3A ₹1,6602A ₹2,3301A ₹3,865(est.)

                          2 stops — Show or hide intermediate stops
                          1. 3:47 AMRTMRatlam Jn · 3 min halt
                          2. 6:45 AMKOTAKota Jn · 10 min halt
                          12:30 PM+1 dayNZMHazrat Nizamuddin Jn
                        4. Change at Delhi

                          • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → Anand Vihar Terminal (ANVT)
                          • Safety buffer: 250 min (4 h 10 min) Total wait: 290 min

                          Station change — you must travel to a different station or bus stand

                          Partner link

                          Long wait at Delhi?

                          Find a room near Anand Vihar Terminal
                        5. 5:20 PM+1 dayANVTAnand Vihar Terminal

                          Train12236Anand Vihar - Madhupur Humsafar Express

                          Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                          Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                          Runs: Thu

                          Indian Railways · 15 h 30 min · 1166 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹310SL ₹5903A ₹1,520(est.)

                          8 stops — Show or hide intermediate stops
                          1. 10:12 PMCNBKanpur Central · 5 min halt
                          2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                          3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                          4. 3:40 AMBXRBuxar · 2 min halt
                          5. 4:25 AMARAAra · 2 min halt
                          6. 5:13 AMPNBEPatna Jn · 7 min halt
                          7. 6:21 AMMKAMokama · 2 min halt
                          8. 6:50 AMKIULKiul Jn · 2 min halt
                          8:50 AM+2 daysJAJJhajha
                      2. Option 3: 3:20 PM8:50 AM+2 days

                        41 h 30 min2 changesSmallest buffer: 253 minfrom ₹665 (est.)

                        via Vadodara · Delhi

                        1. 3:20 PMVAPIVapi

                          Train12480Suryanagari SF Express

                          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:25 (1:25 PM) · you board on day 1

                          Ends at Jodhpur Jn (JU) at Thu, 19 Nov 05:15

                          Runs: Daily

                          Indian Railways · 2 h 56 min · 225 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹80SL ₹1753A ₹5202A ₹7101A ₹1,155(est.)

                          1 stop — Show or hide intermediate stops
                          1. 4:40 PMSTSurat · 5 min halt
                          6:16 PMBRCVadodara Jn
                        2. Change at Vadodara

                          • Same station, no local travel
                          • Safety buffer: 253 min (4 h 13 min) Total wait: 253 min

                          Partner link

                          Long wait at Vadodara?

                          Find a room near Vadodara Jn
                        3. 10:29 PMBRCVadodara Jn

                          Train12907Maharashtra Sampark Kranti Express

                          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 17:30 (5:30 PM) · you board on day 1

                          Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 10:15

                          Runs: Sun, Wed

                          Indian Railways · 11 h 46 min · 988 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹275SL ₹5253A ₹1,3452A ₹1,8801A ₹3,115(est.)

                          2 stops — Show or hide intermediate stops
                          1. 1:48 AMRTMRatlam Jn · 5 min halt
                          2. 4:35 AMKOTAKota Jn · 5 min halt
                          10:15 AM+1 dayNZMHazrat Nizamuddin Jn
                        4. Change at Delhi

                          • Local transit: 40 min · Hazrat Nizamuddin Jn (NZM) → Anand Vihar Terminal (ANVT)
                          • Safety buffer: 385 min (6 h 25 min) Total wait: 425 min

                          Station change — you must travel to a different station or bus stand

                          Partner link

                          Long wait at Delhi?

                          Find a room near Anand Vihar Terminal
                        5. 5:20 PM+1 dayANVTAnand Vihar Terminal

                          Train12236Anand Vihar - Madhupur Humsafar Express

                          Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                          Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                          Runs: Thu

                          Indian Railways · 15 h 30 min · 1166 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹310SL ₹5903A ₹1,520(est.)

                          8 stops — Show or hide intermediate stops
                          1. 10:12 PMCNBKanpur Central · 5 min halt
                          2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                          3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                          4. 3:40 AMBXRBuxar · 2 min halt
                          5. 4:25 AMARAAra · 2 min halt
                          6. 5:13 AMPNBEPatna Jn · 7 min halt
                          7. 6:21 AMMKAMokama · 2 min halt
                          8. 6:50 AMKIULKiul Jn · 2 min halt
                          8:50 AM+2 daysJAJJhajha
                      3. Option 4: 6:55 PM2:25 PM+2 days

                        43 h 30 min2 changesSmallest buffer: 251 minfrom ₹1,115 (est.)

                        via Vadodara · Kanpur

                        1. 6:55 PMVAPIVapi

                          Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express

                          Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 17:10 (5:10 PM) · you board on day 1

                          Ends at Hazrat Nizamuddin Jn (NZM) at Thu, 19 Nov 09:43

                          Runs: Daily

                          Indian Railways · 2 h 49 min · 224 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          3A ₹6302A ₹8651A ₹1,410(est.)

                          3 stops — Show or hide intermediate stops
                          1. 7:13 PMBLValsad · 2 min halt
                          2. 8:10 PMSTSurat · 5 min halt
                          3. 8:53 PMBHBharuch Jn · 2 min halt
                          9:44 PMBRCVadodara Jn
                        2. Change at Vadodara

                          • Same station, no local travel
                          • Safety buffer: 251 min (4 h 11 min) Total wait: 251 min

                          Night-time change — plan safe waiting and local transport

                          Partner link

                          Long wait at Vadodara?

                          Find a room near Vadodara Jn
                        3. 1:55 AM+1 dayBRCVadodara Jn

                          Train19569Okha Varanasi Express

                          Starts from Okha (OKHA) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 2

                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                          Ends at Varanasi Jn (BSB) at Fri, 20 Nov 05:00

                          Runs: Daily · Running days not verified — check before booking

                          Indian Railways · 18 h · 1110 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹285SL ₹5403A ₹1,4202A ₹2,005(est.)

                          7 stops — Show or hide intermediate stops
                          1. 5:55 AMRTMRatlam Jn · 15 min halt
                          2. 7:10 AMNADNagda Jn · 2 min halt
                          3. 9:50 AMKOTAKota Jn · 10 min halt
                          4. 11:15 AMSWMSawai Madhopur · 5 min halt
                          5. 12:23 PMGGCGangapur City · 2 min halt
                          6. 3:50 PMAFAgra Fort · 10 min halt
                          7. 4:50 PMTDLTundla Jn · 5 min halt
                          7:55 PM+1 dayCNBKanpur Central
                        4. Change at Kanpur

                          • Same station, no local travel
                          • Safety buffer: 335 min (5 h 35 min) Total wait: 335 min

                          Night-time change — plan safe waiting and local transport

                          Partner link

                          Long wait at Kanpur?

                          Find a room near Kanpur Central
                        5. 1:30 AM+2 daysCNBKanpur Central

                          Train11106Pratham Swatantrata Sangram Express

                          Starts from Jhansi Jn (JHS) on Thu, 19 Nov at 20:40 (8:40 PM) · you board on day 2

                          This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                          Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 21:45

                          Runs: Daily · Running days not verified — check before booking

                          Indian Railways · 12 h 55 min · 743 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹200SL ₹3853A ₹1,005(est.)

                          6 stops — Show or hide intermediate stops
                          1. 3:55 AMPRYJPrayagraj Jn · 5 min halt
                          2. 7:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
                          3. 8:42 AMBXRBuxar · 2 min halt
                          4. 9:27 AMARAAra · 2 min halt
                          5. 10:40 AMPNBEPatna Jn · 10 min halt
                          6. 12:38 PMKIULKiul Jn · 2 min halt
                          2:25 PM+2 daysJAJJhajha

                      via Patna · 13 routes · best 39 h 11 min

                        All 13 combinations via Patna
                        1. Option 2: 6:28 PM9:39 AM+2 days

                          39 h 11 min1 changeSmallest buffer: 205 minfrom ₹460 (est.)

                          via Patna

                          1. 6:28 PMVAPIVapi

                            Train19049Mumbai Bandra T - Patna Exp

                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                            Runs: Daily · Running days not verified — check before booking

                            Indian Railways · 33 h 2 min · 1689 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                            9 stops — Show or hide intermediate stops
                            1. 7:13 PMBLValsad · 2 min halt
                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                            3. 12:05 AMNDBNandurbar · 20 min halt
                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                            5. 11:11 AMNUNarsinghpur · 2 min halt
                            6. 12:30 PMJBPJabalpur · 10 min halt
                            7. 1:45 PMKTEKatni · 5 min halt
                            8. 3:10 PMSTASatna · 10 min halt
                            9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                            3:30 AM+2 daysPNBEPatna Jn
                          2. Change at Patna

                            • Same station, no local travel
                            • Safety buffer: 205 min (3 h 25 min) Total wait: 205 min

                            Night-time change — plan safe waiting and local transport

                            Partner link

                            Long wait at Patna?

                            Find a room near Patna Jn
                          3. 6:55 AM+2 daysPNBEPatna Jn

                            Train12304Poorva Express

                            Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 2

                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                            Runs: Sun, Wed, Thu, Sat

                            Indian Railways · 2 h 44 min · 151 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹60SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                            4 stops — Show or hide intermediate stops
                            1. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                            2. 7:49 AMBARHBarh · 2 min halt
                            3. 8:10 AMMKAMokama · 2 min halt
                            4. 9:08 AMKIULKiul Jn · 2 min halt
                            9:39 AM+2 daysJMUJamui
                        2. Option 3: 6:28 PM9:49 AM+2 days

                          39 h 21 min1 changeSmallest buffer: 270 minfrom ₹700 (est.)

                          via Patna

                          1. 6:28 PMVAPIVapi

                            Train19049Mumbai Bandra T - Patna Exp

                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                            Runs: Daily · Running days not verified — check before booking

                            Indian Railways · 33 h 2 min · 1689 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                            9 stops — Show or hide intermediate stops
                            1. 7:13 PMBLValsad · 2 min halt
                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                            3. 12:05 AMNDBNandurbar · 20 min halt
                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                            5. 11:11 AMNUNarsinghpur · 2 min halt
                            6. 12:30 PMJBPJabalpur · 10 min halt
                            7. 1:45 PMKTEKatni · 5 min halt
                            8. 3:10 PMSTASatna · 10 min halt
                            9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                            3:30 AM+2 daysPNBEPatna Jn
                          2. Change at Patna

                            • Same station, no local travel
                            • Safety buffer: 270 min (4 h 30 min) Total wait: 270 min

                            Night-time change — plan safe waiting and local transport

                            Partner link

                            Long wait at Patna?

                            Find a room near Patna Jn
                          3. 8:00 AM+2 daysPNBEPatna Jn

                            Train22348Patna - Howrah Vande Bharat Express

                            Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:00 (8:00 AM) · you board on day 1

                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 14:35

                            Runs: Sun, Mon, Tue, Thu, Fri, Sat

                            Indian Railways · 1 h 49 min · 151 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            CC ₹300(est.)

                            4 stops — Show or hide intermediate stops
                            1. 8:13 AMPNCPatna Saheb · 2 min halt
                            2. 8:36 AMBKPBakhtiyarpur Jn · 2 min halt
                            3. 9:03 AMMKAMokama · 2 min halt
                            4. 9:28 AMLKRLuckeesarai Jn · 2 min halt
                            9:49 AM+2 daysJMUJamui
                        3. Option 4: 6:28 PM11:21 AM+2 days

                          40 h 53 min1 changeSmallest buffer: 300 minfrom ₹445 (est.)

                          via Patna

                          1. 6:28 PMVAPIVapi

                            Train19049Mumbai Bandra T - Patna Exp

                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                            Runs: Daily · Running days not verified — check before booking

                            Indian Railways · 33 h 2 min · 1689 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                            9 stops — Show or hide intermediate stops
                            1. 7:13 PMBLValsad · 2 min halt
                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                            3. 12:05 AMNDBNandurbar · 20 min halt
                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                            5. 11:11 AMNUNarsinghpur · 2 min halt
                            6. 12:30 PMJBPJabalpur · 10 min halt
                            7. 1:45 PMKTEKatni · 5 min halt
                            8. 3:10 PMSTASatna · 10 min halt
                            9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                            3:30 AM+2 daysPNBEPatna Jn
                          2. Change at Patna

                            • Same station, no local travel
                            • Safety buffer: 300 min (5 h) Total wait: 300 min

                            Night-time change — plan safe waiting and local transport

                            Partner link

                            Long wait at Patna?

                            Find a room near Patna Jn
                          3. 8:30 AM+2 daysPNBEPatna Jn

                            Train13332Dhanbad Intercity Express

                            Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:30 (8:30 AM) · you board on day 1

                            Ends at Dhanbad Jn (DHN) at Fri, 20 Nov 17:05

                            Runs: Daily

                            Indian Railways · 2 h 51 min · 151 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                            10 stops — Show or hide intermediate stops
                            1. 8:38 AMRJPBRajendra Nagar Terminal · 2 min halt
                            2. 9:03 AMKOOKhusropur · 2 min halt
                            3. 9:28 AMBKPBakhtiyarpur Jn · 2 min halt
                            4. 9:45 AMBARHBarh · 2 min halt
                            5. 10:05 AMMKAMokama · 2 min halt
                            6. 10:15 AMHTZHathidah Jn · 2 min halt
                            7. 10:29 AMBRYABarhiya · 2 min halt
                            8. 10:49 AMLKRLuckeesarai Jn · 2 min halt
                            9. 10:55 AMKIULKiul Jn · 2 min halt
                            10. 11:08 AMMNPMananpur · 2 min halt
                            11:21 AM+2 daysJMUJamui
                        Search another date

                        via Satna · 8 routes · best 39 h 21 min

                          All 8 combinations via Satna
                          1. Option 2: 6:28 PM9:49 AM+2 days

                            39 h 21 min2 changesSmallest buffer: 210 minfrom ₹635 (est.)

                            via Satna · Begusarai

                            1. 6:28 PMVAPIVapi

                              Train19049Mumbai Bandra T - Patna Exp

                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                              Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                              Runs: Daily · Running days not verified — check before booking

                              Indian Railways · 20 h 42 min · 1166 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹295SL ₹5603A ₹1,4752A ₹2,080(est.)

                              7 stops — Show or hide intermediate stops
                              1. 7:13 PMBLValsad · 2 min halt
                              2. 8:38 PMUDNUdhna Jn · 2 min halt
                              3. 12:05 AMNDBNandurbar · 20 min halt
                              4. 4:25 AMBSLBhusaval Jn · 5 min halt
                              5. 11:11 AMNUNarsinghpur · 2 min halt
                              6. 12:30 PMJBPJabalpur · 10 min halt
                              7. 1:45 PMKTEKatni · 5 min halt
                              3:10 PM+1 daySTASatna
                            2. Change at Satna

                              • Same station, no local travel
                              • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                            3. 6:40 PM+1 daySTASatna

                              Train06211Darbhanga Special Fare Festival Special

                              Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:05 (8:05 PM) · you board on day 3

                              This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                              Ends at Darbhanga Jn (DBG) at Fri, 20 Nov 11:30

                              Runs: Tue

                              Indian Railways · 10 h 52 min · 617 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹165SL ₹3303A ₹8552A ₹1,2051A ₹1,985(est.)

                              8 stops — Show or hide intermediate stops
                              1. 9:50 PMPCOIPrayagraj Chheoki · 5 min halt
                              2. 11:43 PMMZPMirzapur · 2 min halt
                              3. 1:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                              4. 2:18 AMBXRBuxar · 2 min halt
                              5. 3:05 AMARAAra · 2 min halt
                              6. 3:55 AMDNRDanapur · 2 min halt
                              7. 4:18 AMPNBEPatna Jn · 7 min halt
                              8. 5:00 AMBKPBakhtiyarpur Jn · 2 min halt
                              5:32 AM+2 daysMKAMokama
                            4. Change at Begusarai

                              • Same station, no local travel
                              • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min

                              Partner link

                              Long wait at Begusarai?

                              Find a room near Mokama
                            5. 9:05 AM+2 daysMKAMokama

                              Train22348Patna - Howrah Vande Bharat Express

                              Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:00 (8:00 AM) · you board on day 1

                              Ends at Howrah Jn (HWH) at Fri, 20 Nov 14:35

                              Runs: Sun, Mon, Tue, Thu, Fri, Sat

                              Indian Railways · 44 min · 62 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              CC ₹175(est.)

                              1 stop — Show or hide intermediate stops
                              1. 9:28 AMLKRLuckeesarai Jn · 2 min halt
                              9:49 AM+2 daysJMUJamui
                          2. Option 3: 6:28 PM11:21 AM+2 days

                            40 h 53 min2 changesSmallest buffer: 210 minfrom ₹485 (est.)

                            via Satna · Patna

                            1. 6:28 PMVAPIVapi

                              Train19049Mumbai Bandra T - Patna Exp

                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                              Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                              Runs: Daily · Running days not verified — check before booking

                              Indian Railways · 20 h 42 min · 1166 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹295SL ₹5603A ₹1,4752A ₹2,080(est.)

                              7 stops — Show or hide intermediate stops
                              1. 7:13 PMBLValsad · 2 min halt
                              2. 8:38 PMUDNUdhna Jn · 2 min halt
                              3. 12:05 AMNDBNandurbar · 20 min halt
                              4. 4:25 AMBSLBhusaval Jn · 5 min halt
                              5. 11:11 AMNUNarsinghpur · 2 min halt
                              6. 12:30 PMJBPJabalpur · 10 min halt
                              7. 1:45 PMKTEKatni · 5 min halt
                              3:10 PM+1 daySTASatna
                            2. Change at Satna

                              • Same station, no local travel
                              • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                            3. 6:40 PM+1 daySTASatna

                              Train06211Darbhanga Special Fare Festival Special

                              Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:05 (8:05 PM) · you board on day 3

                              This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                              Ends at Darbhanga Jn (DBG) at Fri, 20 Nov 11:30

                              Runs: Tue

                              Indian Railways · 9 h 38 min · 528 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹145SL ₹2903A ₹7502A ₹1,0551A ₹1,730(est.)

                              6 stops — Show or hide intermediate stops
                              1. 9:50 PMPCOIPrayagraj Chheoki · 5 min halt
                              2. 11:43 PMMZPMirzapur · 2 min halt
                              3. 1:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                              4. 2:18 AMBXRBuxar · 2 min halt
                              5. 3:05 AMARAAra · 2 min halt
                              6. 3:55 AMDNRDanapur · 2 min halt
                              4:18 AM+2 daysPNBEPatna Jn
                            4. Change at Patna

                              • Same station, no local travel
                              • Safety buffer: 252 min (4 h 12 min) Total wait: 252 min

                              Night-time change — plan safe waiting and local transport

                              Partner link

                              Long wait at Patna?

                              Find a room near Patna Jn
                            5. 8:30 AM+2 daysPNBEPatna Jn

                              Train13332Dhanbad Intercity Express

                              Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:30 (8:30 AM) · you board on day 1

                              Ends at Dhanbad Jn (DHN) at Fri, 20 Nov 17:05

                              Runs: Daily

                              Indian Railways · 2 h 51 min · 151 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                              10 stops — Show or hide intermediate stops
                              1. 8:38 AMRJPBRajendra Nagar Terminal · 2 min halt
                              2. 9:03 AMKOOKhusropur · 2 min halt
                              3. 9:28 AMBKPBakhtiyarpur Jn · 2 min halt
                              4. 9:45 AMBARHBarh · 2 min halt
                              5. 10:05 AMMKAMokama · 2 min halt
                              6. 10:15 AMHTZHathidah Jn · 2 min halt
                              7. 10:29 AMBRYABarhiya · 2 min halt
                              8. 10:49 AMLKRLuckeesarai Jn · 2 min halt
                              9. 10:55 AMKIULKiul Jn · 2 min halt
                              10. 11:08 AMMNPMananpur · 2 min halt
                              11:21 AM+2 daysJMUJamui
                          3. Option 4: 6:28 PM11:34 AM+2 days

                            41 h 6 min2 changesSmallest buffer: 210 minfrom ₹490 (est.)

                            via Satna · Patna

                            1. 6:28 PMVAPIVapi

                              Train19049Mumbai Bandra T - Patna Exp

                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                              Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                              Runs: Daily · Running days not verified — check before booking

                              Indian Railways · 20 h 42 min · 1166 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹295SL ₹5603A ₹1,4752A ₹2,080(est.)

                              7 stops — Show or hide intermediate stops
                              1. 7:13 PMBLValsad · 2 min halt
                              2. 8:38 PMUDNUdhna Jn · 2 min halt
                              3. 12:05 AMNDBNandurbar · 20 min halt
                              4. 4:25 AMBSLBhusaval Jn · 5 min halt
                              5. 11:11 AMNUNarsinghpur · 2 min halt
                              6. 12:30 PMJBPJabalpur · 10 min halt
                              7. 1:45 PMKTEKatni · 5 min halt
                              3:10 PM+1 daySTASatna
                            2. Change at Satna

                              • Same station, no local travel
                              • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                            3. 6:40 PM+1 daySTASatna

                              Train06211Darbhanga Special Fare Festival Special

                              Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:05 (8:05 PM) · you board on day 3

                              This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                              Ends at Darbhanga Jn (DBG) at Fri, 20 Nov 11:30

                              Runs: Tue

                              Indian Railways · 9 h 38 min · 528 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹145SL ₹2903A ₹7502A ₹1,0551A ₹1,730(est.)

                              6 stops — Show or hide intermediate stops
                              1. 9:50 PMPCOIPrayagraj Chheoki · 5 min halt
                              2. 11:43 PMMZPMirzapur · 2 min halt
                              3. 1:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                              4. 2:18 AMBXRBuxar · 2 min halt
                              5. 3:05 AMARAAra · 2 min halt
                              6. 3:55 AMDNRDanapur · 2 min halt
                              4:18 AM+2 daysPNBEPatna Jn
                            4. Change at Patna

                              • Same station, no local travel
                              • Safety buffer: 252 min (4 h 12 min) Total wait: 252 min

                              Night-time change — plan safe waiting and local transport

                              Partner link

                              Long wait at Patna?

                              Find a room near Patna Jn
                            5. 8:30 AM+2 daysPNBEPatna Jn

                              Train13332Dhanbad Intercity Express

                              Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:30 (8:30 AM) · you board on day 1

                              Ends at Dhanbad Jn (DHN) at Fri, 20 Nov 17:05

                              Runs: Daily

                              Indian Railways · 3 h 4 min · 165 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹50SL ₹1303A ₹4752A ₹665(est.)

                              11 stops — Show or hide intermediate stops
                              1. 8:38 AMRJPBRajendra Nagar Terminal · 2 min halt
                              2. 9:03 AMKOOKhusropur · 2 min halt
                              3. 9:28 AMBKPBakhtiyarpur Jn · 2 min halt
                              4. 9:45 AMBARHBarh · 2 min halt
                              5. 10:05 AMMKAMokama · 2 min halt
                              6. 10:15 AMHTZHathidah Jn · 2 min halt
                              7. 10:29 AMBRYABarhiya · 2 min halt
                              8. 10:49 AMLKRLuckeesarai Jn · 2 min halt
                              9. 10:55 AMKIULKiul Jn · 2 min halt
                              10. 11:08 AMMNPMananpur · 2 min halt
                              11. 11:21 AMJMUJamui · 2 min halt
                              11:34 AM+2 daysGHRGidhaur
                          Search another date

                          via Kalyan · 11 routes · best 39 h 30 min

                            All 11 combinations via Kalyan
                            1. Option 2: 1:25 AM4:55 PM+1 day

                              39 h 30 min2 changesSmallest buffer: 222 minfrom ₹520 (est.)

                              via Kalyan · Varanasi

                              • Earliest arrival
                              1. 1:25 AMVAPIVapi

                                Train11089Pune Express

                                Starts from Bhagat KI Kothi (BGKT) on Tue, 17 Nov at 12:15 (12:15 PM) · you board on day 2

                                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Pune Jn (PUNE) at Wed, 18 Nov 07:35

                                Runs: Tue

                                Indian Railways · 2 h 57 min · 163 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                                3 stops — Show or hide intermediate stops
                                1. 2:03 AMDRDDahanu Road · 2 min halt
                                2. 3:15 AMBSRVasai Road · 5 min halt
                                3. 3:48 AMBIRDBhivandi Road · 2 min halt
                                4:22 AMKYNKalyan Jn
                              2. Change at Kalyan

                                • Same station, no local travel
                                • Safety buffer: 253 min (4 h 13 min) Total wait: 253 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Kalyan?

                                Find a room near Kalyan Jn
                              3. 8:35 AMKYNKalyan Jn

                                Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                Runs: Wed

                                Indian Railways · 22 h 23 min · 1444 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹365SL ₹6903A ₹1,7802A ₹2,5001A ₹4,150(est.)

                                9 stops — Show or hide intermediate stops
                                1. 11:48 AMMMRManmad Jn · 2 min halt
                                2. 2:10 PMBSLBhusaval Jn · 5 min halt
                                3. 4:12 PMKNWKhandwa · 3 min halt
                                4. 6:40 PMETItarsi Jn · 10 min halt
                                5. 10:30 PMJBPJabalpur · 10 min halt
                                6. 11:50 PMKTEKatni · 5 min halt
                                7. 1:05 AMSTASatna · 5 min halt
                                8. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                9. 5:20 AMMZPMirzapur · 5 min halt
                                6:58 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                              4. Change at Varanasi

                                • Same station, no local travel
                                • Safety buffer: 222 min (3 h 42 min) Total wait: 222 min
                              5. 10:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                Train04054Howrah Special Fare Puja Special

                                Starts from New Delhi (NDLS) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Howrah Jn (HWH) at Thu, 19 Nov 23:40

                                Runs: Mon, Wed, Sat

                                Indian Railways · 6 h 15 min · 390 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹110SL ₹2253A ₹585(est.)

                                5 stops — Show or hide intermediate stops
                                1. 11:40 AMBXRBuxar · 2 min halt
                                2. 12:25 PMARAAra · 2 min halt
                                3. 1:25 PMPNBEPatna Jn · 10 min halt
                                4. 2:13 PMBKPBakhtiyarpur Jn · 2 min halt
                                5. 3:43 PMKIULKiul Jn · 2 min halt
                                4:55 PM+1 dayJAJJhajha
                            2. Option 3: 1:25 AM4:55 PM+1 day

                              39 h 30 min2 changesSmallest buffer: 180 minfrom ₹505 (est.)

                              via Kalyan · Patna

                              1. 1:25 AMVAPIVapi

                                Train11089Pune Express

                                Starts from Bhagat KI Kothi (BGKT) on Tue, 17 Nov at 12:15 (12:15 PM) · you board on day 2

                                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Pune Jn (PUNE) at Wed, 18 Nov 07:35

                                Runs: Tue

                                Indian Railways · 2 h 57 min · 163 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                                3 stops — Show or hide intermediate stops
                                1. 2:03 AMDRDDahanu Road · 2 min halt
                                2. 3:15 AMBSRVasai Road · 5 min halt
                                3. 3:48 AMBIRDBhivandi Road · 2 min halt
                                4:22 AMKYNKalyan Jn
                              2. Change at Kalyan

                                • Same station, no local travel
                                • Safety buffer: 253 min (4 h 13 min) Total wait: 253 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Kalyan?

                                Find a room near Kalyan Jn
                              3. 8:35 AMKYNKalyan Jn

                                Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                Runs: Wed

                                Indian Railways · 25 h 25 min · 1655 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹410SL ₹7653A ₹1,9802A ₹2,7851A ₹4,625(est.)

                                10 stops — Show or hide intermediate stops
                                1. 11:48 AMMMRManmad Jn · 2 min halt
                                2. 2:10 PMBSLBhusaval Jn · 5 min halt
                                3. 4:12 PMKNWKhandwa · 3 min halt
                                4. 6:40 PMETItarsi Jn · 10 min halt
                                5. 10:30 PMJBPJabalpur · 10 min halt
                                6. 11:50 PMKTEKatni · 5 min halt
                                7. 1:05 AMSTASatna · 5 min halt
                                8. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                9. 5:20 AMMZPMirzapur · 5 min halt
                                10. 6:58 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                10:00 AM+1 dayPPTAPatliputra
                              4. Change at Patna

                                • Local transit: 35 min · Patliputra (PPTA) → Patna Jn (PNBE)
                                • Safety buffer: 180 min (3 h) Total wait: 215 min

                                Station change — you must travel to a different station or bus stand

                              5. 1:35 PM+1 dayPNBEPatna Jn

                                Train04054Howrah Special Fare Puja Special

                                Starts from New Delhi (NDLS) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Howrah Jn (HWH) at Thu, 19 Nov 23:40

                                Runs: Mon, Wed, Sat

                                Indian Railways · 3 h 20 min · 176 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹50SL ₹1303A ₹475(est.)

                                2 stops — Show or hide intermediate stops
                                1. 2:13 PMBKPBakhtiyarpur Jn · 2 min halt
                                2. 3:43 PMKIULKiul Jn · 2 min halt
                                4:55 PM+1 dayJAJJhajha
                            3. Option 4: 1:25 AM5:25 PM+1 day

                              40 h2 changesSmallest buffer: 205 minfrom ₹520 (est.)

                              via Kalyan · Patna

                              1. 1:25 AMVAPIVapi

                                Train11089Pune Express

                                Starts from Bhagat KI Kothi (BGKT) on Tue, 17 Nov at 12:15 (12:15 PM) · you board on day 2

                                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Pune Jn (PUNE) at Wed, 18 Nov 07:35

                                Runs: Tue

                                Indian Railways · 2 h 57 min · 163 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                                3 stops — Show or hide intermediate stops
                                1. 2:03 AMDRDDahanu Road · 2 min halt
                                2. 3:15 AMBSRVasai Road · 5 min halt
                                3. 3:48 AMBIRDBhivandi Road · 2 min halt
                                4:22 AMKYNKalyan Jn
                              2. Change at Kalyan

                                • Same station, no local travel
                                • Safety buffer: 253 min (4 h 13 min) Total wait: 253 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Kalyan?

                                Find a room near Kalyan Jn
                              3. 8:35 AMKYNKalyan Jn

                                Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                Runs: Wed

                                Indian Railways · 25 h 25 min · 1655 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹410SL ₹7653A ₹1,9802A ₹2,7851A ₹4,625(est.)

                                10 stops — Show or hide intermediate stops
                                1. 11:48 AMMMRManmad Jn · 2 min halt
                                2. 2:10 PMBSLBhusaval Jn · 5 min halt
                                3. 4:12 PMKNWKhandwa · 3 min halt
                                4. 6:40 PMETItarsi Jn · 10 min halt
                                5. 10:30 PMJBPJabalpur · 10 min halt
                                6. 11:50 PMKTEKatni · 5 min halt
                                7. 1:05 AMSTASatna · 5 min halt
                                8. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                9. 5:20 AMMZPMirzapur · 5 min halt
                                10. 6:58 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                10:00 AM+1 dayPPTAPatliputra
                              4. Change at Patna

                                • Local transit: 35 min · Patliputra (PPTA) → Patna Jn (PNBE)
                                • Safety buffer: 205 min (3 h 25 min) Total wait: 240 min

                                Station change — you must travel to a different station or bus stand

                                Partner link

                                Long wait at Patna?

                                Find a room near Patna Jn
                              5. 2:00 PM+1 dayPNBEPatna Jn

                                Train16360Ernakulam Junction Pnbe-ers Express

                                Same timings: 22644

                                Starts from Patna Jn (PNBE) on Thu, 19 Nov at 14:00 (2:00 PM) · you board on day 1

                                Ends at Ernakulam Jn (ERS) at Sat, 21 Nov 15:20

                                Runs: Thu, Fri

                                Indian Railways · 3 h 25 min · 177 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹65SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                4 stops — Show or hide intermediate stops
                                1. 2:15 PMPNCPatna Saheb · 4 min halt
                                2. 2:39 PMBKPBakhtiyarpur Jn · 2 min halt
                                3. 3:10 PMMKAMokama · 5 min halt
                                4. 4:10 PMKIULKiul Jn · 5 min halt
                                5:25 PM+1 dayJAJJhajha
                            Search another date

                            via Bharatpur · 2 routes · best 39 h 37 min

                              All 2 combinations via Bharatpur
                              1. Option 2: 12:57 PM4:34 AM+2 days

                                39 h 37 min2 changesSmallest buffer: 210 minfrom ₹595 (est.)

                                via Bharatpur · Varanasi

                                1. 12:57 PMVAPIVapi

                                  Train21907Kathgodam SF Express

                                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                  Ends at Kathgodam (KGM) at Thu, 19 Nov 13:50

                                  Runs: Wed

                                  Indian Railways · 15 h 3 min · 1046 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹285SL ₹5453A ₹1,4052A ₹1,960(est.)

                                  9 stops — Show or hide intermediate stops
                                  1. 1:20 PMBLValsad · 2 min halt
                                  2. 2:31 PMSTSurat · 5 min halt
                                  3. 4:20 PMBRCVadodara Jn · 10 min halt
                                  4. 8:10 PMRTMRatlam Jn · 10 min halt
                                  5. 9:53 PMSGZShamgarh · 2 min halt
                                  6. 10:33 PMRMARamganj Mandi · 2 min halt
                                  7. 11:40 PMKOTAKota Jn · 10 min halt
                                  8. 12:58 AMSWMSawai Madhopur · 2 min halt
                                  9. 1:40 AMGGCGangapur City · 5 min halt
                                  4:00 AM+1 dayBTEBharatpur Jn
                                2. Change at Bharatpur

                                  • Same station, no local travel
                                  • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min

                                  Night-time change — plan safe waiting and local transport

                                  Partner link

                                  Long wait at Bharatpur?

                                  Find a room near Bharatpur Jn
                                3. 7:30 AM+1 dayBTEBharatpur Jn

                                  Train22308Howrah SF Express

                                  Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                                  Runs: Sun, Wed, Sat

                                  Indian Railways · 10 h 43 min · 655 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹190SL ₹3753A ₹9452A ₹1,3151A ₹2,165(est.)

                                  8 stops — Show or hide intermediate stops
                                  1. 7:50 AMAHAchhnera Jn · 2 min halt
                                  2. 8:25 AMIDHIdgah Agra Jn · 10 min halt
                                  3. 9:50 AMTDLTundla Jn · 5 min halt
                                  4. 10:55 AMETWEtawah · 2 min halt
                                  5. 1:00 PMCNBKanpur Central · 10 min halt
                                  6. 2:10 PMFTPFatehpur · 2 min halt
                                  7. 3:40 PMPRYJPrayagraj Jn · 5 min halt
                                  8. 4:48 PMMZPMirzapur · 2 min halt
                                  6:13 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                4. Change at Varanasi

                                  • Same station, no local travel
                                  • Safety buffer: 252 min (4 h 12 min) Total wait: 252 min

                                  Partner link

                                  Long wait at Varanasi?

                                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                                5. 10:25 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                  Train12332Himgiri Express

                                  Starts from Jammutavi (JAT) on Wed, 18 Nov at 22:45 (10:45 PM) · you board on day 2

                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:15

                                  Runs: Daily · Running days not verified — check before booking

                                  Indian Railways · 6 h 9 min · 368 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹120SL ₹2453A ₹6002A ₹825(est.)

                                  8 stops — Show or hide intermediate stops
                                  1. 11:35 PMBXRBuxar · 2 min halt
                                  2. 12:20 AMARAAra · 2 min halt
                                  3. 12:51 AMDNRDanapur · 2 min halt
                                  4. 1:35 AMPNBEPatna Jn · 15 min halt
                                  5. 2:04 AMPNCPatna Saheb · 2 min halt
                                  6. 2:32 AMBKPBakhtiyarpur Jn · 2 min halt
                                  7. 3:11 AMMKAMokama · 2 min halt
                                  8. 4:12 AMKIULKiul Jn · 2 min halt
                                  4:34 AM+2 daysJMUJamui
                              2. Option 3: 12:57 PM5:35 AM+2 days

                                40 h 38 min2 changesSmallest buffer: 210 minfrom ₹600 (est.)

                                via Bharatpur · Varanasi

                                1. 12:57 PMVAPIVapi

                                  Train21907Kathgodam SF Express

                                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                  Ends at Kathgodam (KGM) at Thu, 19 Nov 13:50

                                  Runs: Wed

                                  Indian Railways · 15 h 3 min · 1046 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹285SL ₹5453A ₹1,4052A ₹1,960(est.)

                                  9 stops — Show or hide intermediate stops
                                  1. 1:20 PMBLValsad · 2 min halt
                                  2. 2:31 PMSTSurat · 5 min halt
                                  3. 4:20 PMBRCVadodara Jn · 10 min halt
                                  4. 8:10 PMRTMRatlam Jn · 10 min halt
                                  5. 9:53 PMSGZShamgarh · 2 min halt
                                  6. 10:33 PMRMARamganj Mandi · 2 min halt
                                  7. 11:40 PMKOTAKota Jn · 10 min halt
                                  8. 12:58 AMSWMSawai Madhopur · 2 min halt
                                  9. 1:40 AMGGCGangapur City · 5 min halt
                                  4:00 AM+1 dayBTEBharatpur Jn
                                2. Change at Bharatpur

                                  • Same station, no local travel
                                  • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min

                                  Night-time change — plan safe waiting and local transport

                                  Partner link

                                  Long wait at Bharatpur?

                                  Find a room near Bharatpur Jn
                                3. 7:30 AM+1 dayBTEBharatpur Jn

                                  Train22308Howrah SF Express

                                  Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                                  Runs: Sun, Wed, Sat

                                  Indian Railways · 10 h 43 min · 655 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹190SL ₹3753A ₹9452A ₹1,3151A ₹2,165(est.)

                                  8 stops — Show or hide intermediate stops
                                  1. 7:50 AMAHAchhnera Jn · 2 min halt
                                  2. 8:25 AMIDHIdgah Agra Jn · 10 min halt
                                  3. 9:50 AMTDLTundla Jn · 5 min halt
                                  4. 10:55 AMETWEtawah · 2 min halt
                                  5. 1:00 PMCNBKanpur Central · 10 min halt
                                  6. 2:10 PMFTPFatehpur · 2 min halt
                                  7. 3:40 PMPRYJPrayagraj Jn · 5 min halt
                                  8. 4:48 PMMZPMirzapur · 2 min halt
                                  6:13 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                4. Change at Varanasi

                                  • Same station, no local travel
                                  • Safety buffer: 252 min (4 h 12 min) Total wait: 252 min

                                  Partner link

                                  Long wait at Varanasi?

                                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                                5. 10:25 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                  Train12332Himgiri Express

                                  Starts from Jammutavi (JAT) on Wed, 18 Nov at 22:45 (10:45 PM) · you board on day 2

                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:15

                                  Runs: Daily · Running days not verified — check before booking

                                  Indian Railways · 7 h 10 min · 394 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹125SL ₹2553A ₹6352A ₹870(est.)

                                  9 stops — Show or hide intermediate stops
                                  1. 11:35 PMBXRBuxar · 2 min halt
                                  2. 12:20 AMARAAra · 2 min halt
                                  3. 12:51 AMDNRDanapur · 2 min halt
                                  4. 1:35 AMPNBEPatna Jn · 15 min halt
                                  5. 2:04 AMPNCPatna Saheb · 2 min halt
                                  6. 2:32 AMBKPBakhtiyarpur Jn · 2 min halt
                                  7. 3:11 AMMKAMokama · 2 min halt
                                  8. 4:12 AMKIULKiul Jn · 2 min halt
                                  9. 4:34 AMJMUJamui · 2 min halt
                                  5:35 AM+2 daysJAJJhajha

                              via Kanpur · 9 routes · best 39 h 38 min

                                All 9 combinations via Kanpur
                                1. Option 2: 3:53 PM7:31 AM+2 days

                                  39 h 38 min2 changesSmallest buffer: 187 minfrom ₹580 (est.)

                                  via Kanpur · Patna

                                  1. 3:53 PMVAPIVapi

                                    Train05092Gorakhpur Special Fare Festival Special

                                    Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                    Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                    Runs: Wed

                                    Indian Railways · 23 h 17 min · 1343 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                    8 stops — Show or hide intermediate stops
                                    1. 5:00 PMSTSurat · 5 min halt
                                    2. 6:40 PMBRCVadodara Jn · 5 min halt
                                    3. 11:30 PMRTMRatlam Jn · 5 min halt
                                    4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                    5. 3:30 AMKOTAKota Jn · 10 min halt
                                    6. 6:06 AMGGCGangapur City · 5 min halt
                                    7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                    8. 10:55 AMTDLTundla Jn · 5 min halt
                                    3:10 PM+1 dayCNBKanpur Central
                                  2. Change at Kanpur

                                    • Same station, no local travel
                                    • Safety buffer: 200 min (3 h 20 min) Total wait: 200 min
                                  3. 6:30 PM+1 dayCNBKanpur Central

                                    Train12368Vikramshila Express

                                    Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 13:15 (1:15 PM) · you board on day 1

                                    Ends at Bhagalpur (BGP) at Fri, 20 Nov 08:15

                                    Runs: Daily

                                    Indian Railways · 8 h 8 min · 571 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹170SL ₹3353A ₹8452A ₹1,1701A ₹1,925(est.)

                                    4 stops — Show or hide intermediate stops
                                    1. 11:28 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                    2. 12:40 AMBXRBuxar · 2 min halt
                                    3. 1:25 AMARAAra · 2 min halt
                                    4. 2:13 AMPNBEPatna Jn · 7 min halt
                                    2:38 AM+2 daysPNCPatna Saheb
                                  4. Change at Patna

                                    • Same station, no local travel
                                    • Safety buffer: 187 min (3 h 7 min) Total wait: 187 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Patna?

                                    Find a room near Patna Saheb
                                  5. 5:45 AM+2 daysPNCPatna Saheb

                                    Train12024Patna - Howrah Jan Shatabdi Express

                                    Starts from Patna Jn (PNBE) on Fri, 20 Nov at 05:30 (5:30 AM) · you board on day 1

                                    Ends at Howrah Jn (HWH) at Fri, 20 Nov 13:25

                                    Runs: Mon, Tue, Wed, Thu, Fri, Sat

                                    Indian Railways · 1 h 46 min · 141 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹80CC ₹255(est.)

                                    5 stops — Show or hide intermediate stops
                                    1. 6:06 AMBKPBakhtiyarpur Jn · 2 min halt
                                    2. 6:20 AMBARHBarh · 2 min halt
                                    3. 6:38 AMMKAMokama · 2 min halt
                                    4. 6:48 AMHTZHathidah Jn · 2 min halt
                                    5. 7:09 AMLKRLuckeesarai Jn · 2 min halt
                                    7:31 AM+2 daysJMUJamui
                                2. Option 3: 3:53 PM8:15 AM+2 days

                                  40 h 22 min2 changesSmallest buffer: 187 minfrom ₹590 (est.)

                                  via Kanpur · Patna

                                  1. 3:53 PMVAPIVapi

                                    Train05092Gorakhpur Special Fare Festival Special

                                    Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                    Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                    Runs: Wed

                                    Indian Railways · 23 h 17 min · 1343 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                    8 stops — Show or hide intermediate stops
                                    1. 5:00 PMSTSurat · 5 min halt
                                    2. 6:40 PMBRCVadodara Jn · 5 min halt
                                    3. 11:30 PMRTMRatlam Jn · 5 min halt
                                    4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                    5. 3:30 AMKOTAKota Jn · 10 min halt
                                    6. 6:06 AMGGCGangapur City · 5 min halt
                                    7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                    8. 10:55 AMTDLTundla Jn · 5 min halt
                                    3:10 PM+1 dayCNBKanpur Central
                                  2. Change at Kanpur

                                    • Same station, no local travel
                                    • Safety buffer: 200 min (3 h 20 min) Total wait: 200 min
                                  3. 6:30 PM+1 dayCNBKanpur Central

                                    Train12368Vikramshila Express

                                    Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 13:15 (1:15 PM) · you board on day 1

                                    Ends at Bhagalpur (BGP) at Fri, 20 Nov 08:15

                                    Runs: Daily

                                    Indian Railways · 8 h 8 min · 571 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹170SL ₹3353A ₹8452A ₹1,1701A ₹1,925(est.)

                                    4 stops — Show or hide intermediate stops
                                    1. 11:28 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                    2. 12:40 AMBXRBuxar · 2 min halt
                                    3. 1:25 AMARAAra · 2 min halt
                                    4. 2:13 AMPNBEPatna Jn · 7 min halt
                                    2:38 AM+2 daysPNCPatna Saheb
                                  4. Change at Patna

                                    • Same station, no local travel
                                    • Safety buffer: 187 min (3 h 7 min) Total wait: 187 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Patna?

                                    Find a room near Patna Saheb
                                  5. 5:45 AM+2 daysPNCPatna Saheb

                                    Train12024Patna - Howrah Jan Shatabdi Express

                                    Starts from Patna Jn (PNBE) on Fri, 20 Nov at 05:30 (5:30 AM) · you board on day 1

                                    Ends at Howrah Jn (HWH) at Fri, 20 Nov 13:25

                                    Runs: Mon, Tue, Wed, Thu, Fri, Sat

                                    Indian Railways · 2 h 30 min · 167 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹90CC ₹285(est.)

                                    6 stops — Show or hide intermediate stops
                                    1. 6:06 AMBKPBakhtiyarpur Jn · 2 min halt
                                    2. 6:20 AMBARHBarh · 2 min halt
                                    3. 6:38 AMMKAMokama · 2 min halt
                                    4. 6:48 AMHTZHathidah Jn · 2 min halt
                                    5. 7:09 AMLKRLuckeesarai Jn · 2 min halt
                                    6. 7:31 AMJMUJamui · 2 min halt
                                    8:15 AM+2 daysJAJJhajha
                                3. Option 4: 3:53 PM9:24 AM+2 days

                                  41 h 31 min2 changesSmallest buffer: 200 minfrom ₹540 (est.)

                                  via Kanpur · Patna

                                  1. 3:53 PMVAPIVapi

                                    Train05092Gorakhpur Special Fare Festival Special

                                    Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                    Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                    Runs: Wed

                                    Indian Railways · 23 h 17 min · 1343 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                    8 stops — Show or hide intermediate stops
                                    1. 5:00 PMSTSurat · 5 min halt
                                    2. 6:40 PMBRCVadodara Jn · 5 min halt
                                    3. 11:30 PMRTMRatlam Jn · 5 min halt
                                    4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                    5. 3:30 AMKOTAKota Jn · 10 min halt
                                    6. 6:06 AMGGCGangapur City · 5 min halt
                                    7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                    8. 10:55 AMTDLTundla Jn · 5 min halt
                                    3:10 PM+1 dayCNBKanpur Central
                                  2. Change at Kanpur

                                    • Same station, no local travel
                                    • Safety buffer: 200 min (3 h 20 min) Total wait: 200 min
                                  3. 6:30 PM+1 dayCNBKanpur Central

                                    Train12368Vikramshila Express

                                    Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 13:15 (1:15 PM) · you board on day 1

                                    Ends at Bhagalpur (BGP) at Fri, 20 Nov 08:15

                                    Runs: Daily

                                    Indian Railways · 8 h 8 min · 571 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹170SL ₹3353A ₹8452A ₹1,1701A ₹1,925(est.)

                                    4 stops — Show or hide intermediate stops
                                    1. 11:28 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                    2. 12:40 AMBXRBuxar · 2 min halt
                                    3. 1:25 AMARAAra · 2 min halt
                                    4. 2:13 AMPNBEPatna Jn · 7 min halt
                                    2:38 AM+2 daysPNCPatna Saheb
                                  4. Change at Patna

                                    • Same station, no local travel
                                    • Safety buffer: 220 min (3 h 40 min) Total wait: 220 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Patna?

                                    Find a room near Patna Saheb
                                  5. 6:18 AM+2 daysPNCPatna Saheb

                                    Train18184Buxar - Tatanagar Express

                                    Starts from Buxar (BXR) on Fri, 20 Nov at 03:30 (3:30 AM) · you board on day 1

                                    Ends at Tatanagar Jn (TATA) at Fri, 20 Nov 18:00

                                    Runs: Daily

                                    Indian Railways · 3 h 6 min · 140 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹40CC ₹2103A ₹475(est.)

                                    11 stops — Show or hide intermediate stops
                                    1. 6:31 AMFUTFatuha · 2 min halt
                                    2. 6:42 AMKOOKhusropur · 2 min halt
                                    3. 7:00 AMBKPBakhtiyarpur Jn · 2 min halt
                                    4. 7:16 AMBARHBarh · 2 min halt
                                    5. 7:40 AMMKAMokama · 2 min halt
                                    6. 7:52 AMHTZHathidah Jn · 2 min halt
                                    7. 8:04 AMBRYABarhiya · 2 min halt
                                    8. 8:20 AMMKBMankatha · 2 min halt
                                    9. 8:35 AMLKRLuckeesarai Jn · 2 min halt
                                    10. 8:55 AMKIULKiul Jn · 2 min halt
                                    11. 9:09 AMMNPMananpur · 2 min halt
                                    9:24 AM+2 daysJMUJamui
                                Search another date

                                via Palghar · 1 route · best 40 h

                                  All 1 combinations via Palghar
                                  1. Option 2: 1:40 AM5:40 PM+1 day

                                    40 h2 changesSmallest buffer: 201 minfrom ₹495 (est.)

                                    via Palghar · Kalyan

                                    1. 1:40 AMVAPIVapi

                                      Train22946Saurashtra Mail

                                      Starts from Okha (OKHA) on Tue, 17 Nov at 11:05 (11:05 AM) · you board on day 2

                                      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                      Ends at Mumbai Central (MMCT) at Wed, 18 Nov 04:55

                                      Runs: Daily

                                      Indian Railways · 58 min · 82 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹40SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                      2:38 AMPLGPalghar
                                    2. Change at Palghar

                                      • Same station, no local travel
                                      • Safety buffer: 201 min (3 h 21 min) Total wait: 201 min

                                      Night-time change — plan safe waiting and local transport

                                      Partner link

                                      Long wait at Palghar?

                                      Find a room near Palghar
                                    3. 5:59 AMPLGPalghar

                                      Train69164Dahanu Road - Panvel Local

                                      Starts from Dahanu Road (DRD) on Wed, 18 Nov at 05:25 (5:25 AM) · you board on day 1

                                      Ends at Panvel (PNVL) at Wed, 18 Nov 08:55

                                      Runs: Daily

                                      Indian Railways · 1 h 57 min · 75 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹10(est.)

                                      10 stops — Show or hide intermediate stops
                                      1. 6:08 AMKLVKelva Road · 1 min halt
                                      2. 6:14 AMSAHSaphale · 1 min halt
                                      3. 6:22 AMVTNVaitarana · 1 min halt
                                      4. 6:31 AMVRVirar · 1 min halt
                                      5. 6:37 AMNSPNalla Sopara · 1 min halt
                                      6. 6:55 AMBSRVasai Road · 1 min halt
                                      7. 7:12 AMJCNRJuchandra · 1 min halt
                                      8. 7:18 AMKARDKaman Road · 1 min halt
                                      9. 7:26 AMKHBVKharbao · 1 min halt
                                      10. 7:46 AMBIRDBhivandi Road · 1 min halt
                                      7:56 AMKOPRKopar
                                    4. Change at Kalyan

                                      • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                      • Safety buffer: 214 min (3 h 34 min) Total wait: 244 min

                                      Station change — you must travel to a different station or bus stand

                                      Partner link

                                      Long wait at Kalyan?

                                      Find a room near Kalyan Jn
                                    5. 12:00 PMKYNKalyan Jn

                                      Train12362Asansol SF Express

                                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                                      Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                                      Runs: Wed

                                      Indian Railways · 29 h 40 min · 1835 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹445SL ₹8303A ₹2,1552A ₹3,025(est.)

                                      13 stops — Show or hide intermediate stops
                                      1. 3:33 PMMMRManmad Jn · 2 min halt
                                      2. 5:55 PMBSLBhusaval Jn · 5 min halt
                                      3. 7:57 PMKNWKhandwa · 3 min halt
                                      4. 10:25 PMETItarsi Jn · 10 min halt
                                      5. 1:25 AMJBPJabalpur · 10 min halt
                                      6. 2:55 AMKTEKatni · 5 min halt
                                      7. 4:25 AMSTASatna · 5 min halt
                                      8. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                                      9. 8:45 AMMZPMirzapur · 5 min halt
                                      10. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                      11. 11:25 AMBXRBuxar · 2 min halt
                                      12. 1:28 PMPNBEPatna Jn · 7 min halt
                                      13. 4:00 PMKIULKiul Jn · 2 min halt
                                      5:40 PM+1 dayJAJJhajha

                                  via Dahanu · 2 routes · best 40 h 15 min

                                    All 2 combinations via Dahanu
                                    1. Option 2: 1:25 AM5:40 PM+1 day

                                      40 h 15 min2 changesSmallest buffer: 202 minfrom ₹475 (est.)

                                      via Dahanu · Kalyan

                                      1. 1:25 AMVAPIVapi

                                        Train11089Pune Express

                                        Starts from Bhagat KI Kothi (BGKT) on Tue, 17 Nov at 12:15 (12:15 PM) · you board on day 2

                                        This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                        Ends at Pune Jn (PUNE) at Wed, 18 Nov 07:35

                                        Runs: Tue

                                        Indian Railways · 38 min · 48 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹15SL ₹1303A ₹4752A ₹665(est.)

                                        2:03 AMDRDDahanu Road
                                      2. Change at Dahanu

                                        • Same station, no local travel
                                        • Safety buffer: 202 min (3 h 22 min) Total wait: 202 min

                                        Night-time change — plan safe waiting and local transport

                                        Partner link

                                        Long wait at Dahanu?

                                        Find a room near Dahanu Road
                                      3. 5:25 AMDRDDahanu Road

                                        Train69164Dahanu Road - Panvel Local

                                        Starts from Dahanu Road (DRD) on Wed, 18 Nov at 05:25 (5:25 AM) · you board on day 1

                                        Ends at Panvel (PNVL) at Wed, 18 Nov 08:55

                                        Runs: Daily

                                        Indian Railways · 2 h 31 min · 108 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹15(est.)

                                        14 stops — Show or hide intermediate stops
                                        1. 5:36 AMVGNVangaon · 1 min halt
                                        2. 5:44 AMBORBoisar · 1 min halt
                                        3. 5:50 AMUOIUmroli · 1 min halt
                                        4. 5:58 AMPLGPalghar · 1 min halt
                                        5. 6:08 AMKLVKelva Road · 1 min halt
                                        6. 6:14 AMSAHSaphale · 1 min halt
                                        7. 6:22 AMVTNVaitarana · 1 min halt
                                        8. 6:31 AMVRVirar · 1 min halt
                                        9. 6:37 AMNSPNalla Sopara · 1 min halt
                                        10. 6:55 AMBSRVasai Road · 1 min halt
                                        11. 7:12 AMJCNRJuchandra · 1 min halt
                                        12. 7:18 AMKARDKaman Road · 1 min halt
                                        13. 7:26 AMKHBVKharbao · 1 min halt
                                        14. 7:46 AMBIRDBhivandi Road · 1 min halt
                                        7:56 AMKOPRKopar
                                      4. Change at Kalyan

                                        • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                        • Safety buffer: 214 min (3 h 34 min) Total wait: 244 min

                                        Station change — you must travel to a different station or bus stand

                                        Partner link

                                        Long wait at Kalyan?

                                        Find a room near Kalyan Jn
                                      5. 12:00 PMKYNKalyan Jn

                                        Train12362Asansol SF Express

                                        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                                        Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                                        Runs: Wed

                                        Indian Railways · 29 h 40 min · 1835 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹445SL ₹8303A ₹2,1552A ₹3,025(est.)

                                        13 stops — Show or hide intermediate stops
                                        1. 3:33 PMMMRManmad Jn · 2 min halt
                                        2. 5:55 PMBSLBhusaval Jn · 5 min halt
                                        3. 7:57 PMKNWKhandwa · 3 min halt
                                        4. 10:25 PMETItarsi Jn · 10 min halt
                                        5. 1:25 AMJBPJabalpur · 10 min halt
                                        6. 2:55 AMKTEKatni · 5 min halt
                                        7. 4:25 AMSTASatna · 5 min halt
                                        8. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                                        9. 8:45 AMMZPMirzapur · 5 min halt
                                        10. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                        11. 11:25 AMBXRBuxar · 2 min halt
                                        12. 1:28 PMPNBEPatna Jn · 7 min halt
                                        13. 4:00 PMKIULKiul Jn · 2 min halt
                                        5:40 PM+1 dayJAJJhajha
                                    2. Option 3: 12:22 AM5:40 PM+1 day

                                      41 h 18 min2 changesSmallest buffer: 214 minfrom ₹470 (est.)

                                      via Dahanu · Kalyan

                                      1. 12:22 AMSJNSanjan

                                        Train59442Ahmedabad Mumbai Central Passenger

                                        Starts from Ahmedabad Jn (ADI) on Tue, 17 Nov at 12:05 (12:05 PM) · you board on day 2

                                        This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                        Ends at Mumbai Central (BCT) at Wed, 18 Nov 04:40

                                        Runs: Daily · Running days not verified — check before booking

                                        Indian Railways · 42 min · 26 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹10(est.)

                                        3 stops — Show or hide intermediate stops
                                        1. 12:28 AMUBRUmbargam Road · 2 min halt
                                        2. 12:37 AMBRRDBordi Road
                                        3. 12:44 AMGVDGholvad · 2 min halt
                                        1:04 AMDRDDahanu Road
                                      2. Change at Dahanu

                                        • Same station, no local travel
                                        • Safety buffer: 261 min (4 h 21 min) Total wait: 261 min

                                        Night-time change — plan safe waiting and local transport

                                        Partner link

                                        Long wait at Dahanu?

                                        Find a room near Dahanu Road
                                      3. 5:25 AMDRDDahanu Road

                                        Train69164Dahanu Road - Panvel Local

                                        Starts from Dahanu Road (DRD) on Wed, 18 Nov at 05:25 (5:25 AM) · you board on day 1

                                        Ends at Panvel (PNVL) at Wed, 18 Nov 08:55

                                        Runs: Daily

                                        Indian Railways · 2 h 31 min · 108 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹15(est.)

                                        14 stops — Show or hide intermediate stops
                                        1. 5:36 AMVGNVangaon · 1 min halt
                                        2. 5:44 AMBORBoisar · 1 min halt
                                        3. 5:50 AMUOIUmroli · 1 min halt
                                        4. 5:58 AMPLGPalghar · 1 min halt
                                        5. 6:08 AMKLVKelva Road · 1 min halt
                                        6. 6:14 AMSAHSaphale · 1 min halt
                                        7. 6:22 AMVTNVaitarana · 1 min halt
                                        8. 6:31 AMVRVirar · 1 min halt
                                        9. 6:37 AMNSPNalla Sopara · 1 min halt
                                        10. 6:55 AMBSRVasai Road · 1 min halt
                                        11. 7:12 AMJCNRJuchandra · 1 min halt
                                        12. 7:18 AMKARDKaman Road · 1 min halt
                                        13. 7:26 AMKHBVKharbao · 1 min halt
                                        14. 7:46 AMBIRDBhivandi Road · 1 min halt
                                        7:56 AMKOPRKopar
                                      4. Change at Kalyan

                                        • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                        • Safety buffer: 214 min (3 h 34 min) Total wait: 244 min

                                        Station change — you must travel to a different station or bus stand

                                        Partner link

                                        Long wait at Kalyan?

                                        Find a room near Kalyan Jn
                                      5. 12:00 PMKYNKalyan Jn

                                        Train12362Asansol SF Express

                                        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                                        Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                                        Runs: Wed

                                        Indian Railways · 29 h 40 min · 1835 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹445SL ₹8303A ₹2,1552A ₹3,025(est.)

                                        13 stops — Show or hide intermediate stops
                                        1. 3:33 PMMMRManmad Jn · 2 min halt
                                        2. 5:55 PMBSLBhusaval Jn · 5 min halt
                                        3. 7:57 PMKNWKhandwa · 3 min halt
                                        4. 10:25 PMETItarsi Jn · 10 min halt
                                        5. 1:25 AMJBPJabalpur · 10 min halt
                                        6. 2:55 AMKTEKatni · 5 min halt
                                        7. 4:25 AMSTASatna · 5 min halt
                                        8. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                                        9. 8:45 AMMZPMirzapur · 5 min halt
                                        10. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                        11. 11:25 AMBXRBuxar · 2 min halt
                                        12. 1:28 PMPNBEPatna Jn · 7 min halt
                                        13. 4:00 PMKIULKiul Jn · 2 min halt
                                        5:40 PM+1 dayJAJJhajha

                                    via Thane · 3 routes · best 40 h 35 min

                                      All 3 combinations via Thane
                                      1. Option 2: 1:05 AM5:40 PM+1 day

                                        40 h 35 min2 changesSmallest buffer: 208 minfrom ₹490 (est.)

                                        via Thane · Kalyan

                                        1. 1:05 AMVAPIVapi

                                          Train19038Avadh Express

                                          Starts from Barauni Jn (BJU) on Mon, 16 Nov at 07:20 (7:20 AM) · you board on day 3

                                          This train starts on Mon, 16 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                          Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 04:05

                                          Runs: Daily

                                          Indian Railways · 2 h 7 min · 139 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹40SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                          1 stop — Show or hide intermediate stops
                                          1. 2:13 AMBORBoisar · 2 min halt
                                          3:12 AMBVIBorivali
                                        2. Change at Thane

                                          • Local transit: 55 min · Borivali (BVI) → Thane (TNA)
                                          • Safety buffer: 208 min (3 h 28 min) Total wait: 263 min

                                          Night-time change — plan safe waiting and local transport

                                          Partner link

                                          Long wait at Thane?

                                          Find a room near Thane
                                        3. 7:35 AMTNAThane

                                          Train11007Deccan Express

                                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 07:00 (7:00 AM) · you board on day 1

                                          Ends at Pune Jn (PUNE) at Wed, 18 Nov 11:05

                                          Runs: Daily

                                          Indian Railways · 18 min · 21 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹5CC ₹100(est.)

                                          7:53 AMKYNKalyan Jn
                                        4. Change at Kalyan

                                          • Same station, no local travel
                                          • Safety buffer: 247 min (4 h 7 min) Total wait: 247 min

                                          Partner link

                                          Long wait at Kalyan?

                                          Find a room near Kalyan Jn
                                        5. 12:00 PMKYNKalyan Jn

                                          Train12362Asansol SF Express

                                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                                          Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                                          Runs: Wed

                                          Indian Railways · 29 h 40 min · 1835 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹445SL ₹8303A ₹2,1552A ₹3,025(est.)

                                          13 stops — Show or hide intermediate stops
                                          1. 3:33 PMMMRManmad Jn · 2 min halt
                                          2. 5:55 PMBSLBhusaval Jn · 5 min halt
                                          3. 7:57 PMKNWKhandwa · 3 min halt
                                          4. 10:25 PMETItarsi Jn · 10 min halt
                                          5. 1:25 AMJBPJabalpur · 10 min halt
                                          6. 2:55 AMKTEKatni · 5 min halt
                                          7. 4:25 AMSTASatna · 5 min halt
                                          8. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                                          9. 8:45 AMMZPMirzapur · 5 min halt
                                          10. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                          11. 11:25 AMBXRBuxar · 2 min halt
                                          12. 1:28 PMPNBEPatna Jn · 7 min halt
                                          13. 4:00 PMKIULKiul Jn · 2 min halt
                                          5:40 PM+1 dayJAJJhajha
                                      2. Option 3: 5:15 AM1:10 AM+2 days

                                        43 h 55 min2 changesSmallest buffer: 222 minfrom ₹525 (est.)

                                        via Thane · Varanasi

                                        1. 5:15 AMVAPIVapi

                                          Train12972Bandra Terminus SF Express

                                          Starts from Bhavnagar Terminus (BVC) on Tue, 17 Nov at 18:30 (6:30 PM) · you board on day 2

                                          This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                          Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 08:20

                                          Runs: Daily

                                          Indian Railways · 2 h 3 min · 139 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹55SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                          7:18 AMBVIBorivali
                                        2. Change at Thane

                                          • Local transit: 55 min · Borivali (BVI) → Thane (TNA)
                                          • Safety buffer: 222 min (3 h 42 min) Total wait: 277 min

                                          Station change — you must travel to a different station or bus stand

                                          Partner link

                                          Long wait at Thane?

                                          Find a room near Thane
                                        3. 11:55 AMTNAThane

                                          Train11061Pawan Express

                                          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                                          Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

                                          Runs: Daily

                                          Indian Railways · 24 h 48 min · 1456 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹355SL ₹6653A ₹1,7502A ₹2,470(est.)

                                          23 stops — Show or hide intermediate stops
                                          1. 12:12 PMKYNKalyan Jn · 3 min halt
                                          2. 2:50 PMNKNasik Road · 5 min halt
                                          3. 4:00 PMMMRManmad Jn · 5 min halt
                                          4. 4:53 PMCSNChalisgaon Jn · 2 min halt
                                          5. 5:28 PMPCPachora Jn · 2 min halt
                                          6. 6:13 PMJLJalgaon Jn · 2 min halt
                                          7. 6:45 PMBSLBhusaval Jn · 5 min halt
                                          8. 7:38 PMBAUBurhanpur · 2 min halt
                                          9. 8:57 PMKNWKhandwa · 3 min halt
                                          10. 11:20 PMETItarsi Jn · 10 min halt
                                          11. 12:18 AMPPIPipariya · 2 min halt
                                          12. 1:18 AMNUNarsinghpur · 2 min halt
                                          13. 2:40 AMJBPJabalpur · 10 min halt
                                          14. 4:00 AMKTEKatni · 5 min halt
                                          15. 4:48 AMMYRMaihar · 2 min halt
                                          16. 5:25 AMSTASatna · 5 min halt
                                          17. 7:25 AMMKPManikpur Jn · 2 min halt
                                          18. 8:59 AMNYNNaini · 1 min halt
                                          19. 9:30 AMPRYJPrayagraj Jn · 25 min halt
                                          20. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
                                          21. 11:08 AMGYNGyanpur Road · 2 min halt
                                          22. 11:53 AMBHLPBhulanpur · 1 min halt
                                          23. 12:25 PMBSBVaranasi Jn · 10 min halt
                                          12:43 PM+1 dayBCYVaranasi City
                                        4. Change at Varanasi

                                          • Local transit: 20 min · Varanasi City (BCY) → Varanasi Jn (BSB)
                                          • Safety buffer: 237 min (3 h 57 min) Total wait: 257 min

                                          Station change — you must travel to a different station or bus stand

                                          Partner link

                                          Long wait at Varanasi?

                                          Find a room near Varanasi Jn
                                        5. 5:00 PM+1 dayBSBVaranasi Jn

                                          Train13006Howrah Mail

                                          Starts from Amritsar Jn (ASR) on Wed, 18 Nov at 18:25 (6:25 PM) · you board on day 2

                                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 07:25

                                          Runs: Daily

                                          Indian Railways · 8 h 10 min · 409 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹115SL ₹2353A ₹6052A ₹8501A ₹1,390(est.)

                                          16 stops — Show or hide intermediate stops
                                          1. 5:12 PMKEIKashi · 1 min halt
                                          2. 5:50 PMDDUPt. Deen Dayal Upadhyaya Jn · 5 min halt
                                          3. 6:24 PMDHADheena · 2 min halt
                                          4. 6:36 PMZNAZamania · 2 min halt
                                          5. 6:50 PMDLNDildarnagar Jn · 2 min halt
                                          6. 7:00 PMBWHBhadaura · 2 min halt
                                          7. 7:10 PMGMRGahmar · 2 min halt
                                          8. 7:28 PMBXRBuxar · 2 min halt
                                          9. 7:45 PMDUREDumraon · 2 min halt
                                          10. 8:21 PMARAAra · 2 min halt
                                          11. 8:58 PMDNRDanapur · 2 min halt
                                          12. 9:28 PMPNBEPatna Jn · 7 min halt
                                          13. 9:53 PMPNCPatna Saheb · 5 min halt
                                          14. 10:26 PMBKPBakhtiyarpur Jn · 2 min halt
                                          15. 11:02 PMMKAMokama · 5 min halt
                                          16. 11:48 PMKIULKiul Jn · 2 min halt
                                          1:10 AM+2 daysJAJJhajha
                                      3. Option 4: 5:15 AM1:50 AM+2 days

                                        44 h 35 min2 changesSmallest buffer: 222 minfrom ₹520 (est.)

                                        via Thane · Varanasi

                                        1. 5:15 AMVAPIVapi

                                          Train12972Bandra Terminus SF Express

                                          Starts from Bhavnagar Terminus (BVC) on Tue, 17 Nov at 18:30 (6:30 PM) · you board on day 2

                                          This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                          Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 08:20

                                          Runs: Daily

                                          Indian Railways · 2 h 3 min · 139 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹55SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                          7:18 AMBVIBorivali
                                        2. Change at Thane

                                          • Local transit: 55 min · Borivali (BVI) → Thane (TNA)
                                          • Safety buffer: 222 min (3 h 42 min) Total wait: 277 min

                                          Station change — you must travel to a different station or bus stand

                                          Partner link

                                          Long wait at Thane?

                                          Find a room near Thane
                                        3. 11:55 AMTNAThane

                                          Train11061Pawan Express

                                          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                                          Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

                                          Runs: Daily

                                          Indian Railways · 24 h 48 min · 1456 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹355SL ₹6653A ₹1,7502A ₹2,470(est.)

                                          23 stops — Show or hide intermediate stops
                                          1. 12:12 PMKYNKalyan Jn · 3 min halt
                                          2. 2:50 PMNKNasik Road · 5 min halt
                                          3. 4:00 PMMMRManmad Jn · 5 min halt
                                          4. 4:53 PMCSNChalisgaon Jn · 2 min halt
                                          5. 5:28 PMPCPachora Jn · 2 min halt
                                          6. 6:13 PMJLJalgaon Jn · 2 min halt
                                          7. 6:45 PMBSLBhusaval Jn · 5 min halt
                                          8. 7:38 PMBAUBurhanpur · 2 min halt
                                          9. 8:57 PMKNWKhandwa · 3 min halt
                                          10. 11:20 PMETItarsi Jn · 10 min halt
                                          11. 12:18 AMPPIPipariya · 2 min halt
                                          12. 1:18 AMNUNarsinghpur · 2 min halt
                                          13. 2:40 AMJBPJabalpur · 10 min halt
                                          14. 4:00 AMKTEKatni · 5 min halt
                                          15. 4:48 AMMYRMaihar · 2 min halt
                                          16. 5:25 AMSTASatna · 5 min halt
                                          17. 7:25 AMMKPManikpur Jn · 2 min halt
                                          18. 8:59 AMNYNNaini · 1 min halt
                                          19. 9:30 AMPRYJPrayagraj Jn · 25 min halt
                                          20. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
                                          21. 11:08 AMGYNGyanpur Road · 2 min halt
                                          22. 11:53 AMBHLPBhulanpur · 1 min halt
                                          23. 12:25 PMBSBVaranasi Jn · 10 min halt
                                          12:43 PM+1 dayBCYVaranasi City
                                        4. Change at Varanasi

                                          • Local transit: 55 min · Varanasi City (BCY) → Pt. Deen Dayal Upadhyaya Jn (DDU)
                                          • Safety buffer: 317 min (5 h 17 min) Total wait: 372 min

                                          Station change — you must travel to a different station or bus stand

                                          Partner link

                                          Long wait at Varanasi?

                                          Find a room near Pt. Deen Dayal Upadhyaya Jn
                                        5. 6:55 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                          Train13048Vibhuti Express

                                          Starts from Prayagraj Rambag (PRRB) on Thu, 19 Nov at 15:40 (3:40 PM) · you board on day 1

                                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 07:35

                                          Runs: Daily

                                          Indian Railways · 6 h 55 min · 390 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹110SL ₹2253A ₹5852A ₹820(est.)

                                          17 stops — Show or hide intermediate stops
                                          1. 7:32 PMZNAZamania · 2 min halt
                                          2. 7:45 PMDLNDildarnagar Jn · 2 min halt
                                          3. 7:59 PMGMRGahmar · 2 min halt
                                          4. 8:09 PMCSAChausa · 2 min halt
                                          5. 8:20 PMBXRBuxar · 2 min halt
                                          6. 8:36 PMDUREDumraon · 2 min halt
                                          7. 8:52 PMRPRRaghunathpur · 2 min halt
                                          8. 9:08 PMBEABihiya · 2 min halt
                                          9. 9:26 PMARAAra · 2 min halt
                                          10. 9:45 PMBTABihta · 2 min halt
                                          11. 10:03 PMDNRDanapur · 2 min halt
                                          12. 10:23 PMPNBEPatna Jn · 7 min halt
                                          13. 10:51 PMFUTFatuha · 2 min halt
                                          14. 11:11 PMBKPBakhtiyarpur Jn · 2 min halt
                                          15. 11:26 PMBARHBarh · 2 min halt
                                          16. 11:46 PMMKAMokama · 2 min halt
                                          17. 12:18 AMKIULKiul Jn · 2 min halt
                                          1:50 AM+2 daysJAJJhajha

                                      via Varanasi · 8 routes · best 40 h 36 min

                                        All 8 combinations via Varanasi
                                        1. Option 2: 6:28 PM11:04 AM+2 days

                                          40 h 36 min2 changesSmallest buffer: 190 minfrom ₹475 (est.)

                                          via Varanasi · Lakhisarai

                                          1. 6:28 PMVAPIVapi

                                            Train19049Mumbai Bandra T - Patna Exp

                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 29 h 2 min · 1477 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

                                            8 stops — Show or hide intermediate stops
                                            1. 7:13 PMBLValsad · 2 min halt
                                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                                            3. 12:05 AMNDBNandurbar · 20 min halt
                                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                            5. 11:11 AMNUNarsinghpur · 2 min halt
                                            6. 12:30 PMJBPJabalpur · 10 min halt
                                            7. 1:45 PMKTEKatni · 5 min halt
                                            8. 3:10 PMSTASatna · 10 min halt
                                            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                          2. Change at Varanasi

                                            • Same station, no local travel
                                            • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Varanasi?

                                            Find a room near Pt. Deen Dayal Upadhyaya Jn
                                          3. 2:40 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                                            Train12236Anand Vihar - Madhupur Humsafar Express

                                            Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 2

                                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                                            Runs: Thu

                                            Indian Railways · 4 h 10 min · 337 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹110SL ₹2303A ₹565(est.)

                                            4 stops — Show or hide intermediate stops
                                            1. 3:40 AMBXRBuxar · 2 min halt
                                            2. 4:25 AMARAAra · 2 min halt
                                            3. 5:13 AMPNBEPatna Jn · 7 min halt
                                            4. 6:21 AMMKAMokama · 2 min halt
                                            6:50 AM+2 daysKIULKiul Jn
                                          4. Change at Lakhisarai

                                            • Same station, no local travel
                                            • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min
                                          5. 10:23 AM+2 daysKIULKiul Jn

                                            Train53624Gaya - Jhajha Passenger

                                            Starts from Gaya Jn (GAYA) on Fri, 20 Nov at 05:15 (5:15 AM) · you board on day 1

                                            Ends at Jhajha (JAJ) at Fri, 20 Nov 12:20

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 41 min · 19 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹10(est.)

                                            4 stops — Show or hide intermediate stops
                                            1. 10:29 AMMHLTMahesh Leta Halt · 1 min halt
                                            2. 10:34 AMLCKLakhochak Halt · 1 min halt
                                            3. 10:40 AMBSQPBansipur · 1 min halt
                                            4. 10:51 AMMNPMananpur · 1 min halt
                                            11:04 AM+2 daysBFMBhalui
                                        2. Option 3: 6:28 PM11:10 AM+2 days

                                          40 h 42 min2 changesSmallest buffer: 190 minfrom ₹475 (est.)

                                          via Varanasi · Lakhisarai

                                          1. 6:28 PMVAPIVapi

                                            Train19049Mumbai Bandra T - Patna Exp

                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 29 h 2 min · 1477 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

                                            8 stops — Show or hide intermediate stops
                                            1. 7:13 PMBLValsad · 2 min halt
                                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                                            3. 12:05 AMNDBNandurbar · 20 min halt
                                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                            5. 11:11 AMNUNarsinghpur · 2 min halt
                                            6. 12:30 PMJBPJabalpur · 10 min halt
                                            7. 1:45 PMKTEKatni · 5 min halt
                                            8. 3:10 PMSTASatna · 10 min halt
                                            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                          2. Change at Varanasi

                                            • Same station, no local travel
                                            • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Varanasi?

                                            Find a room near Pt. Deen Dayal Upadhyaya Jn
                                          3. 2:40 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                                            Train12236Anand Vihar - Madhupur Humsafar Express

                                            Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 2

                                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                                            Runs: Thu

                                            Indian Railways · 4 h 10 min · 337 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹110SL ₹2303A ₹565(est.)

                                            4 stops — Show or hide intermediate stops
                                            1. 3:40 AMBXRBuxar · 2 min halt
                                            2. 4:25 AMARAAra · 2 min halt
                                            3. 5:13 AMPNBEPatna Jn · 7 min halt
                                            4. 6:21 AMMKAMokama · 2 min halt
                                            6:50 AM+2 daysKIULKiul Jn
                                          4. Change at Lakhisarai

                                            • Same station, no local travel
                                            • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min
                                          5. 10:23 AM+2 daysKIULKiul Jn

                                            Train53624Gaya - Jhajha Passenger

                                            Starts from Gaya Jn (GAYA) on Fri, 20 Nov at 05:15 (5:15 AM) · you board on day 1

                                            Ends at Jhajha (JAJ) at Fri, 20 Nov 12:20

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 47 min · 22 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹10(est.)

                                            5 stops — Show or hide intermediate stops
                                            1. 10:29 AMMHLTMahesh Leta Halt · 1 min halt
                                            2. 10:34 AMLCKLakhochak Halt · 1 min halt
                                            3. 10:40 AMBSQPBansipur · 1 min halt
                                            4. 10:51 AMMNPMananpur · 1 min halt
                                            5. 11:04 AMBFMBhalui · 1 min halt
                                            11:10 AM+2 daysKDERKunder Halt
                                        3. Option 4: 6:28 PM12:20 PM+2 days

                                          41 h 52 min2 changesSmallest buffer: 190 minfrom ₹480 (est.)

                                          via Varanasi · Lakhisarai

                                          1. 6:28 PMVAPIVapi

                                            Train19049Mumbai Bandra T - Patna Exp

                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                            Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 29 h 2 min · 1477 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹355SL ₹6703A ₹1,7702A ₹2,500(est.)

                                            8 stops — Show or hide intermediate stops
                                            1. 7:13 PMBLValsad · 2 min halt
                                            2. 8:38 PMUDNUdhna Jn · 2 min halt
                                            3. 12:05 AMNDBNandurbar · 20 min halt
                                            4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                            5. 11:11 AMNUNarsinghpur · 2 min halt
                                            6. 12:30 PMJBPJabalpur · 10 min halt
                                            7. 1:45 PMKTEKatni · 5 min halt
                                            8. 3:10 PMSTASatna · 10 min halt
                                            11:30 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                          2. Change at Varanasi

                                            • Same station, no local travel
                                            • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Varanasi?

                                            Find a room near Pt. Deen Dayal Upadhyaya Jn
                                          3. 2:40 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                                            Train12236Anand Vihar - Madhupur Humsafar Express

                                            Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 2

                                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                                            Runs: Thu

                                            Indian Railways · 4 h 10 min · 337 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹110SL ₹2303A ₹565(est.)

                                            4 stops — Show or hide intermediate stops
                                            1. 3:40 AMBXRBuxar · 2 min halt
                                            2. 4:25 AMARAAra · 2 min halt
                                            3. 5:13 AMPNBEPatna Jn · 7 min halt
                                            4. 6:21 AMMKAMokama · 2 min halt
                                            6:50 AM+2 daysKIULKiul Jn
                                          4. Change at Lakhisarai

                                            • Same station, no local travel
                                            • Safety buffer: 230 min (3 h 50 min) Total wait: 230 min
                                          5. 10:40 AM+2 daysKIULKiul Jn

                                            Train17008Charlapalli Express

                                            Starts from Darbhanga Jn (DBG) on Fri, 20 Nov at 07:05 (7:05 AM) · you board on day 1

                                            Ends at Charlapalli (CHZ) at Sat, 21 Nov 20:00

                                            Runs: Tue, Fri

                                            Indian Railways · 1 h 40 min · 54 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹15SL ₹1303A ₹4752A ₹665(est.)

                                            12:20 PM+2 daysJAJJhajha
                                        Search another date

                                        via Kanpur · 2 routes · best 40 h 57 min

                                          All 2 combinations via Kanpur
                                          1. Option 2: 3:53 PM8:50 AM+2 days

                                            40 h 57 min1 changeSmallest buffer: 427 minfrom ₹540 (est.)

                                            via Kanpur

                                            1. 3:53 PMVAPIVapi

                                              Train05092Gorakhpur Special Fare Festival Special

                                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                              Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                              Runs: Wed

                                              Indian Railways · 23 h 17 min · 1343 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                              8 stops — Show or hide intermediate stops
                                              1. 5:00 PMSTSurat · 5 min halt
                                              2. 6:40 PMBRCVadodara Jn · 5 min halt
                                              3. 11:30 PMRTMRatlam Jn · 5 min halt
                                              4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                              5. 3:30 AMKOTAKota Jn · 10 min halt
                                              6. 6:06 AMGGCGangapur City · 5 min halt
                                              7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                              8. 10:55 AMTDLTundla Jn · 5 min halt
                                              3:10 PM+1 dayCNBKanpur Central
                                            2. Change at Kanpur

                                              • Same station, no local travel
                                              • Safety buffer: 427 min (7 h 7 min) Total wait: 427 min

                                              Partner link

                                              Long wait at Kanpur?

                                              Find a room near Kanpur Central
                                            3. 10:17 PM+1 dayCNBKanpur Central

                                              Train12236Anand Vihar - Madhupur Humsafar Express

                                              Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                                              Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                                              Runs: Thu

                                              Indian Railways · 10 h 33 min · 738 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹210SL ₹4103A ₹1,045(est.)

                                              7 stops — Show or hide intermediate stops
                                              1. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                                              2. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                              3. 3:40 AMBXRBuxar · 2 min halt
                                              4. 4:25 AMARAAra · 2 min halt
                                              5. 5:13 AMPNBEPatna Jn · 7 min halt
                                              6. 6:21 AMMKAMokama · 2 min halt
                                              7. 6:50 AMKIULKiul Jn · 2 min halt
                                              8:50 AM+2 daysJAJJhajha
                                          2. Option 3: 3:53 PM9:39 AM+2 days

                                            41 h 46 min1 changeSmallest buffer: 475 minfrom ₹535 (est.)

                                            via Kanpur

                                            1. 3:53 PMVAPIVapi

                                              Train05092Gorakhpur Special Fare Festival Special

                                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                              Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                              Runs: Wed

                                              Indian Railways · 23 h 17 min · 1343 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                              8 stops — Show or hide intermediate stops
                                              1. 5:00 PMSTSurat · 5 min halt
                                              2. 6:40 PMBRCVadodara Jn · 5 min halt
                                              3. 11:30 PMRTMRatlam Jn · 5 min halt
                                              4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                              5. 3:30 AMKOTAKota Jn · 10 min halt
                                              6. 6:06 AMGGCGangapur City · 5 min halt
                                              7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                              8. 10:55 AMTDLTundla Jn · 5 min halt
                                              3:10 PM+1 dayCNBKanpur Central
                                            2. Change at Kanpur

                                              • Same station, no local travel
                                              • Safety buffer: 475 min (7 h 55 min) Total wait: 475 min

                                              Partner link

                                              Long wait at Kanpur?

                                              Find a room near Kanpur Central
                                            3. 11:05 PM+1 dayCNBKanpur Central

                                              Train12304Poorva Express

                                              Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                                              Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                                              Runs: Sun, Wed, Thu, Sat

                                              Indian Railways · 10 h 34 min · 712 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹205SL ₹4003A ₹1,0152A ₹1,4101A ₹2,330(est.)

                                              10 stops — Show or hide intermediate stops
                                              1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                                              2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                              3. 5:03 AMBXRBuxar · 2 min halt
                                              4. 5:45 AMARAAra · 5 min halt
                                              5. 6:22 AMDNRDanapur · 2 min halt
                                              6. 6:48 AMPNBEPatna Jn · 7 min halt
                                              7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                                              8. 7:49 AMBARHBarh · 2 min halt
                                              9. 8:10 AMMKAMokama · 2 min halt
                                              10. 9:08 AMKIULKiul Jn · 2 min halt
                                              9:39 AM+2 daysJMUJamui

                                          via Umbargam · 1 route · best 41 h 18 min

                                            All 1 combinations via Umbargam
                                            1. Option 2: 12:22 AM5:40 PM+1 day

                                              41 h 18 min2 changesSmallest buffer: 242 minfrom ₹485 (est.)

                                              via Umbargam · Mumbai

                                              1. 12:22 AMSJNSanjan

                                                Train59442Ahmedabad Mumbai Central Passenger

                                                Starts from Ahmedabad Jn (ADI) on Tue, 17 Nov at 12:05 (12:05 PM) · you board on day 2

                                                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                                Ends at Mumbai Central (BCT) at Wed, 18 Nov 04:40

                                                Runs: Daily · Running days not verified — check before booking

                                                Indian Railways · 6 min · 6 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10(est.)

                                                12:28 AMUBRUmbargam Road
                                              2. Change at Umbargam

                                                • Same station, no local travel
                                                • Safety buffer: 243 min (4 h 3 min) Total wait: 243 min

                                                Night-time change — plan safe waiting and local transport

                                                Partner link

                                                Long wait at Umbargam?

                                                Find a room near Umbargam Road
                                              3. 4:31 AMUBRUmbargam Road

                                                Train59460Veraval Mumbai Central Passenger Express

                                                Starts from Veraval (VRL) on Tue, 17 Nov at 13:20 (1:20 PM) · you board on day 2

                                                This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                                Ends at Mumbai Central (BCT) at Wed, 18 Nov 07:40

                                                Runs: Daily · Running days not verified — check before booking

                                                Indian Railways · 1 h 57 min · 123 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹20(est.)

                                                22 stops — Show or hide intermediate stops
                                                1. 4:34 AMBRRDBordi Road
                                                2. 4:38 AMGVDGholvad
                                                3. 4:45 AMDRDDahanu Road
                                                4. 4:54 AMVGNVangaon
                                                5. 5:01 AMBORBoisar
                                                6. 5:04 AMUOIUmroli
                                                7. 5:10 AMPLGPalghar · 2 min halt
                                                8. 5:20 AMKLVKelva Road
                                                9. 5:27 AMSAHSaphale
                                                10. 5:35 AMVTNVaitarana
                                                11. 5:43 AMVRVirar
                                                12. 5:47 AMNSPNalla Sopara
                                                13. 5:52 AMBSRVasai Road
                                                14. 5:55 AMNIGNaigaon
                                                15. 6:00 AMBYRBhayandar
                                                16. 6:03 AMMIRAMira Road
                                                17. 6:07 AMDICDahisar
                                                18. 6:09 AMBVIBorivali · 2 min halt
                                                19. 6:15 AMKILEKandivli
                                                20. 6:17 AMMDDMalad
                                                21. 6:21 AMGMNGoregaon
                                                22. 6:25 AMJOSJogeshwari
                                                6:28 AMADHAndheri
                                              4. Change at Mumbai

                                                • Local transit: 50 min · Andheri (ADH) → Dadar (DR)
                                                • Safety buffer: 242 min (4 h 2 min) Total wait: 292 min

                                                Station change — you must travel to a different station or bus stand

                                                Partner link

                                                Long wait at Mumbai?

                                                Find a room near Dadar
                                              5. 11:20 AMDRDadar

                                                Train12362Asansol SF Express

                                                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                                                Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                                                Runs: Wed

                                                Indian Railways · 30 h 20 min · 1880 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹455SL ₹8453A ₹2,1952A ₹3,090(est.)

                                                14 stops — Show or hide intermediate stops
                                                1. 11:57 AMKYNKalyan Jn · 3 min halt
                                                2. 3:33 PMMMRManmad Jn · 2 min halt
                                                3. 5:55 PMBSLBhusaval Jn · 5 min halt
                                                4. 7:57 PMKNWKhandwa · 3 min halt
                                                5. 10:25 PMETItarsi Jn · 10 min halt
                                                6. 1:25 AMJBPJabalpur · 10 min halt
                                                7. 2:55 AMKTEKatni · 5 min halt
                                                8. 4:25 AMSTASatna · 5 min halt
                                                9. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                                                10. 8:45 AMMZPMirzapur · 5 min halt
                                                11. 10:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                12. 11:25 AMBXRBuxar · 2 min halt
                                                13. 1:28 PMPNBEPatna Jn · 7 min halt
                                                14. 4:00 PMKIULKiul Jn · 2 min halt
                                                5:40 PM+1 dayJAJJhajha

                                            via Nashik · 1 route · best 41 h 20 min

                                              All 1 combinations via Nashik
                                              1. Option 2: 6:00 PM11:20 AM+2 days

                                                41 h 20 min2 changesSmallest buffer: 215 minfrom ₹710 (est.)

                                                via Nashik · Koderma

                                                1. 6:00 PMVapi Bus Stand

                                                  BusState RTC (estimated) Ordinary

                                                  State RTC (estimated) · 3 h 30 min · 139 km · Runs every 60 min

                                                  Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                                  Ordinary ₹160(est.)

                                                  Buy at bus stand · every 60 min

                                                  9:30 PMNashik Bus Stand
                                                2. Change at Nashik

                                                  • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
                                                  • Safety buffer: 215 min (3 h 35 min) Total wait: 250 min

                                                  Night-time change — plan safe waiting and local transport

                                                  Partner link

                                                  Long wait at Nashik?

                                                  Find a room near Nasik Road
                                                3. 1:40 AM+1 dayNKNasik Road

                                                  Train12322Howrah Mail

                                                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                  Runs: Daily

                                                  Indian Railways · 25 h 48 min · 1596 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹395SL ₹7453A ₹1,9252A ₹2,7051A ₹4,490(est.)

                                                  29 stops — Show or hide intermediate stops
                                                  1. 2:37 AMMMRManmad Jn · 3 min halt
                                                  2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                  3. 4:48 AMJLJalgaon Jn · 2 min halt
                                                  4. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                  5. 6:08 AMBAUBurhanpur · 2 min halt
                                                  6. 7:23 AMKNWKhandwa · 2 min halt
                                                  7. 8:30 AMHDHarda · 2 min halt
                                                  8. 9:50 AMETItarsi Jn · 10 min halt
                                                  9. 10:46 AMPPIPipariya · 2 min halt
                                                  10. 11:20 AMGARGadarwara · 2 min halt
                                                  11. 11:40 AMKYKareli · 2 min halt
                                                  12. 11:54 AMNUNarsinghpur · 2 min halt
                                                  13. 12:20 PMSRIDSridham · 2 min halt
                                                  14. 1:20 PMJBPJabalpur · 10 min halt
                                                  15. 2:35 PMKTEKatni · 5 min halt
                                                  16. 3:28 PMMYRMaihar · 2 min halt
                                                  17. 4:20 PMSTASatna · 5 min halt
                                                  18. 5:50 PMMKPManikpur Jn · 2 min halt
                                                  19. 6:43 PMSRJShankargarh · 1 min halt
                                                  20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                  21. 8:20 PMBDLVindhyachal · 2 min halt
                                                  22. 8:35 PMMZPMirzapur · 5 min halt
                                                  23. 9:13 PMCARChunar · 2 min halt
                                                  24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                  25. 11:36 PMBBUBhabua Road · 2 min halt
                                                  26. 12:08 AMSSMSasaram · 2 min halt
                                                  27. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                  28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                  29. 2:05 AMGAYAGaya Jn · 5 min halt
                                                  3:28 AM+2 daysKQRKoderma
                                                4. Change at Koderma

                                                  • Local transit: 40 min · Koderma (KQR) → Koderma Bus Stand
                                                  • Safety buffer: 232 min (3 h 52 min) Total wait: 272 min

                                                  Night-time change — plan safe waiting and local transport

                                                  Partner link

                                                  Long wait at Koderma?

                                                  Find a room near Koderma Bus Stand
                                                5. 8:00 AM+2 daysKoderma Bus Stand

                                                  BusState RTC (estimated) Ordinary

                                                  State RTC (estimated) · 3 h 20 min · 133 km · Runs every 60 min

                                                  Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                                  Ordinary ₹155(est.)

                                                  Buy at bus stand · every 60 min

                                                  11:20 AM+2 daysJamui Bus Stand

                                              via Satna · 2 routes · best 41 h 32 min

                                                All 2 combinations via Satna
                                                1. Option 2: 6:28 PM12:00 PM+2 days

                                                  41 h 32 min2 changesSmallest buffer: 183 minfrom ₹555 (est.)

                                                  via Satna · Begusarai

                                                  1. 6:28 PMVAPIVapi

                                                    Train19049Mumbai Bandra T - Patna Exp

                                                    Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                                    Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                                    Runs: Daily · Running days not verified — check before booking

                                                    Indian Railways · 20 h 42 min · 1166 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹295SL ₹5603A ₹1,4752A ₹2,080(est.)

                                                    7 stops — Show or hide intermediate stops
                                                    1. 7:13 PMBLValsad · 2 min halt
                                                    2. 8:38 PMUDNUdhna Jn · 2 min halt
                                                    3. 12:05 AMNDBNandurbar · 20 min halt
                                                    4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                                    5. 11:11 AMNUNarsinghpur · 2 min halt
                                                    6. 12:30 PMJBPJabalpur · 10 min halt
                                                    7. 1:45 PMKTEKatni · 5 min halt
                                                    3:10 PM+1 daySTASatna
                                                  2. Change at Satna

                                                    • Same station, no local travel
                                                    • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                                                  3. 6:40 PM+1 daySTASatna

                                                    Train06211Darbhanga Special Fare Festival Special

                                                    Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:05 (8:05 PM) · you board on day 3

                                                    This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Darbhanga Jn (DBG) at Fri, 20 Nov 11:30

                                                    Runs: Tue

                                                    Indian Railways · 10 h 52 min · 617 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹165SL ₹3303A ₹8552A ₹1,2051A ₹1,985(est.)

                                                    8 stops — Show or hide intermediate stops
                                                    1. 9:50 PMPCOIPrayagraj Chheoki · 5 min halt
                                                    2. 11:43 PMMZPMirzapur · 2 min halt
                                                    3. 1:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                                                    4. 2:18 AMBXRBuxar · 2 min halt
                                                    5. 3:05 AMARAAra · 2 min halt
                                                    6. 3:55 AMDNRDanapur · 2 min halt
                                                    7. 4:18 AMPNBEPatna Jn · 7 min halt
                                                    8. 5:00 AMBKPBakhtiyarpur Jn · 2 min halt
                                                    5:32 AM+2 daysMKAMokama
                                                  4. Change at Begusarai

                                                    • Local transit: 85 min · Mokama (MKA) → Begusarai Bus Stand
                                                    • Safety buffer: 183 min (3 h 3 min) Total wait: 268 min

                                                    Station change — you must travel to a different station or bus stand

                                                    Partner link

                                                    Long wait at Begusarai?

                                                    Find a room near Begusarai Bus Stand
                                                  5. 10:00 AM+2 daysBegusarai Bus Stand

                                                    BusState RTC (estimated) Ordinary

                                                    State RTC (estimated) · 2 h · 82 km · Runs every 60 min

                                                    Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                                    Ordinary ₹95(est.)

                                                    Buy at bus stand · every 60 min

                                                    12:00 PM+2 daysJamui Bus Stand
                                                2. Option 3: 6:28 PM2:00 PM+2 days

                                                  43 h 32 min2 changesSmallest buffer: 210 minfrom ₹560 (est.)

                                                  via Satna · Begusarai

                                                  1. 6:28 PMVAPIVapi

                                                    Train19049Mumbai Bandra T - Patna Exp

                                                    Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                                    Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                                    Runs: Daily · Running days not verified — check before booking

                                                    Indian Railways · 20 h 42 min · 1166 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹295SL ₹5603A ₹1,4752A ₹2,080(est.)

                                                    7 stops — Show or hide intermediate stops
                                                    1. 7:13 PMBLValsad · 2 min halt
                                                    2. 8:38 PMUDNUdhna Jn · 2 min halt
                                                    3. 12:05 AMNDBNandurbar · 20 min halt
                                                    4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                                    5. 11:11 AMNUNarsinghpur · 2 min halt
                                                    6. 12:30 PMJBPJabalpur · 10 min halt
                                                    7. 1:45 PMKTEKatni · 5 min halt
                                                    3:10 PM+1 daySTASatna
                                                  2. Change at Satna

                                                    • Same station, no local travel
                                                    • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                                                  3. 6:40 PM+1 daySTASatna

                                                    Train06211Darbhanga Special Fare Festival Special

                                                    Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:05 (8:05 PM) · you board on day 3

                                                    This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Darbhanga Jn (DBG) at Fri, 20 Nov 11:30

                                                    Runs: Tue

                                                    Indian Railways · 12 h 25 min · 638 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹170SL ₹3353A ₹8802A ₹1,2401A ₹2,045(est.)

                                                    9 stops — Show or hide intermediate stops
                                                    1. 9:50 PMPCOIPrayagraj Chheoki · 5 min halt
                                                    2. 11:43 PMMZPMirzapur · 2 min halt
                                                    3. 1:00 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                                                    4. 2:18 AMBXRBuxar · 2 min halt
                                                    5. 3:05 AMARAAra · 2 min halt
                                                    6. 3:55 AMDNRDanapur · 2 min halt
                                                    7. 4:18 AMPNBEPatna Jn · 7 min halt
                                                    8. 5:00 AMBKPBakhtiyarpur Jn · 2 min halt
                                                    9. 5:32 AMMKAMokama · 2 min halt
                                                    7:05 AM+2 daysBJUBarauni Jn
                                                  4. Change at Begusarai

                                                    • Local transit: 60 min · Barauni Jn (BJU) → Begusarai Bus Stand
                                                    • Safety buffer: 235 min (3 h 55 min) Total wait: 295 min

                                                    Station change — you must travel to a different station or bus stand

                                                    Partner link

                                                    Long wait at Begusarai?

                                                    Find a room near Begusarai Bus Stand
                                                  5. 12:00 PM+2 daysBegusarai Bus Stand

                                                    BusState RTC (estimated) Ordinary

                                                    State RTC (estimated) · 2 h · 82 km · Runs every 60 min

                                                    Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                                    Ordinary ₹95(est.)

                                                    Buy at bus stand · every 60 min

                                                    2:00 PM+2 daysJamui Bus Stand

                                                via Agra · 1 route · best 41 h 46 min

                                                  All 1 combinations via Agra
                                                  1. Option 2: 3:53 PM9:39 AM+2 days

                                                    41 h 46 min1 changeSmallest buffer: 570 minfrom ₹545 (est.)

                                                    via Agra

                                                    1. 3:53 PMVAPIVapi

                                                      Train05092Gorakhpur Special Fare Festival Special

                                                      Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                      Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                      Runs: Wed

                                                      Indian Railways · 17 h 17 min · 1087 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹280SL ₹5303A ₹1,4002A ₹1,970(est.)

                                                      6 stops — Show or hide intermediate stops
                                                      1. 5:00 PMSTSurat · 5 min halt
                                                      2. 6:40 PMBRCVadodara Jn · 5 min halt
                                                      3. 11:30 PMRTMRatlam Jn · 5 min halt
                                                      4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                      5. 3:30 AMKOTAKota Jn · 10 min halt
                                                      6. 6:06 AMGGCGangapur City · 5 min halt
                                                      9:10 AM+1 dayIDHIdgah Agra Jn
                                                    2. Change at Agra

                                                      • Local transit: 95 min · Idgah Agra Jn (IDH) → Tundla Jn (TDL)
                                                      • Safety buffer: 570 min (9 h 30 min) Total wait: 665 min

                                                      Station change — you must travel to a different station or bus stand

                                                      Partner link

                                                      Long wait at Agra?

                                                      Find a room near Tundla Jn
                                                    3. 8:15 PM+1 dayTDLTundla Jn

                                                      Train12304Poorva Express

                                                      Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                                                      Runs: Sun, Wed, Thu, Sat

                                                      Indian Railways · 13 h 24 min · 943 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹265SL ₹5053A ₹1,2902A ₹1,8051A ₹2,990(est.)

                                                      12 stops — Show or hide intermediate stops
                                                      1. 9:08 PMETWEtawah · 2 min halt
                                                      2. 10:55 PMCNBKanpur Central · 10 min halt
                                                      3. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                                                      4. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                      5. 5:03 AMBXRBuxar · 2 min halt
                                                      6. 5:45 AMARAAra · 5 min halt
                                                      7. 6:22 AMDNRDanapur · 2 min halt
                                                      8. 6:48 AMPNBEPatna Jn · 7 min halt
                                                      9. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                                                      10. 7:49 AMBARHBarh · 2 min halt
                                                      11. 8:10 AMMKAMokama · 2 min halt
                                                      12. 9:08 AMKIULKiul Jn · 2 min halt
                                                      9:39 AM+2 daysJMUJamui

                                                  via Agra · 2 routes · best 41 h 46 min

                                                    All 2 combinations via Agra
                                                    1. Option 2: 3:53 PM9:39 AM+2 days

                                                      41 h 46 min2 changesSmallest buffer: 262 minfrom ₹535 (est.)

                                                      via Agra · Etawah

                                                      1. 3:53 PMVAPIVapi

                                                        Train05092Gorakhpur Special Fare Festival Special

                                                        Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                        Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                        Runs: Wed

                                                        Indian Railways · 17 h 17 min · 1087 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹280SL ₹5303A ₹1,4002A ₹1,970(est.)

                                                        6 stops — Show or hide intermediate stops
                                                        1. 5:00 PMSTSurat · 5 min halt
                                                        2. 6:40 PMBRCVadodara Jn · 5 min halt
                                                        3. 11:30 PMRTMRatlam Jn · 5 min halt
                                                        4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                        5. 3:30 AMKOTAKota Jn · 10 min halt
                                                        6. 6:06 AMGGCGangapur City · 5 min halt
                                                        9:10 AM+1 dayIDHIdgah Agra Jn
                                                      2. Change at Agra

                                                        • Local transit: 95 min · Idgah Agra Jn (IDH) → Tundla Jn (TDL)
                                                        • Safety buffer: 272 min (4 h 32 min) Total wait: 367 min

                                                        Station change — you must travel to a different station or bus stand

                                                        Partner link

                                                        Long wait at Agra?

                                                        Find a room near Tundla Jn
                                                      3. 3:17 PM+1 dayTDLTundla Jn

                                                        Train64704Aligarh - Govindpuri MEMU

                                                        Starts from Aligarh Jn (ALJN) on Thu, 19 Nov at 13:40 (1:40 PM) · you board on day 1

                                                        Ends at Govindpuri (GOY) at Thu, 19 Nov 20:15

                                                        Runs: Mon, Tue, Wed, Thu, Fri, Sat

                                                        Indian Railways · 1 h 31 min · 92 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹15(est.)

                                                        2 stops — Show or hide intermediate stops
                                                        1. 3:38 PMFZDFirozabad · 2 min halt
                                                        2. 4:10 PMSKBShikohabad Jn · 2 min halt
                                                        4:48 PM+1 dayETWEtawah
                                                      4. Change at Etawah

                                                        • Same station, no local travel
                                                        • Safety buffer: 262 min (4 h 22 min) Total wait: 262 min

                                                        Partner link

                                                        Long wait at Etawah?

                                                        Find a room near Etawah
                                                      5. 9:10 PM+1 dayETWEtawah

                                                        Train12304Poorva Express

                                                        Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                                                        Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                                                        Runs: Sun, Wed, Thu, Sat

                                                        Indian Railways · 12 h 29 min · 851 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹240SL ₹4653A ₹1,1802A ₹1,6451A ₹2,725(est.)

                                                        11 stops — Show or hide intermediate stops
                                                        1. 10:55 PMCNBKanpur Central · 10 min halt
                                                        2. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                                                        3. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                        4. 5:03 AMBXRBuxar · 2 min halt
                                                        5. 5:45 AMARAAra · 5 min halt
                                                        6. 6:22 AMDNRDanapur · 2 min halt
                                                        7. 6:48 AMPNBEPatna Jn · 7 min halt
                                                        8. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                                                        9. 7:49 AMBARHBarh · 2 min halt
                                                        10. 8:10 AMMKAMokama · 2 min halt
                                                        11. 9:08 AMKIULKiul Jn · 2 min halt
                                                        9:39 AM+2 daysJMUJamui
                                                    2. Option 3: 3:53 PM9:39 AM+2 days

                                                      41 h 46 min2 changesSmallest buffer: 215 minfrom ₹520 (est.)

                                                      via Agra · Kanpur

                                                      1. 3:53 PMVAPIVapi

                                                        Train05092Gorakhpur Special Fare Festival Special

                                                        Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                        Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                        Runs: Wed

                                                        Indian Railways · 17 h 17 min · 1087 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹280SL ₹5303A ₹1,4002A ₹1,970(est.)

                                                        6 stops — Show or hide intermediate stops
                                                        1. 5:00 PMSTSurat · 5 min halt
                                                        2. 6:40 PMBRCVadodara Jn · 5 min halt
                                                        3. 11:30 PMRTMRatlam Jn · 5 min halt
                                                        4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                        5. 3:30 AMKOTAKota Jn · 10 min halt
                                                        6. 6:06 AMGGCGangapur City · 5 min halt
                                                        9:10 AM+1 dayIDHIdgah Agra Jn
                                                      2. Change at Agra

                                                        • Local transit: 95 min · Idgah Agra Jn (IDH) → Tundla Jn (TDL)
                                                        • Safety buffer: 272 min (4 h 32 min) Total wait: 367 min

                                                        Station change — you must travel to a different station or bus stand

                                                        Partner link

                                                        Long wait at Agra?

                                                        Find a room near Tundla Jn
                                                      3. 3:17 PM+1 dayTDLTundla Jn

                                                        Train64704Aligarh - Govindpuri MEMU

                                                        Starts from Aligarh Jn (ALJN) on Thu, 19 Nov at 13:40 (1:40 PM) · you board on day 1

                                                        Ends at Govindpuri (GOY) at Thu, 19 Nov 20:15

                                                        Runs: Mon, Tue, Wed, Thu, Fri, Sat

                                                        Indian Railways · 3 h 23 min · 220 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹35(est.)

                                                        7 stops — Show or hide intermediate stops
                                                        1. 3:38 PMFZDFirozabad · 2 min halt
                                                        2. 4:10 PMSKBShikohabad Jn · 2 min halt
                                                        3. 4:48 PMETWEtawah · 2 min halt
                                                        4. 5:10 PMBNTBharthana · 2 min halt
                                                        5. 5:35 PMPHDPhaphund · 1 min halt
                                                        6. 5:50 PMJJKJhinjhak · 1 min halt
                                                        7. 6:10 PMRURARura · 1 min halt
                                                        6:40 PM+1 dayPNKDPanki Dham
                                                      4. Change at Kanpur

                                                        • Local transit: 50 min · Panki Dham (PNKD) → Kanpur Central (CNB)
                                                        • Safety buffer: 215 min (3 h 35 min) Total wait: 265 min

                                                        Station change — you must travel to a different station or bus stand

                                                        Partner link

                                                        Long wait at Kanpur?

                                                        Find a room near Kanpur Central
                                                      5. 11:05 PM+1 dayCNBKanpur Central

                                                        Train12304Poorva Express

                                                        Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 1

                                                        Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                                                        Runs: Sun, Wed, Thu, Sat

                                                        Indian Railways · 10 h 34 min · 712 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹205SL ₹4003A ₹1,0152A ₹1,4101A ₹2,330(est.)

                                                        10 stops — Show or hide intermediate stops
                                                        1. 1:15 AMPRYJPrayagraj Jn · 5 min halt
                                                        2. 3:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                        3. 5:03 AMBXRBuxar · 2 min halt
                                                        4. 5:45 AMARAAra · 5 min halt
                                                        5. 6:22 AMDNRDanapur · 2 min halt
                                                        6. 6:48 AMPNBEPatna Jn · 7 min halt
                                                        7. 7:34 AMBKPBakhtiyarpur Jn · 2 min halt
                                                        8. 7:49 AMBARHBarh · 2 min halt
                                                        9. 8:10 AMMKAMokama · 2 min halt
                                                        10. 9:08 AMKIULKiul Jn · 2 min halt
                                                        9:39 AM+2 daysJMUJamui

                                                    via Faridabad · 1 route · best 41 h 55 min

                                                      All 1 combinations via Faridabad
                                                      1. Option 2: 2:55 PM8:50 AM+2 days

                                                        41 h 55 min2 changesSmallest buffer: 231 minfrom ₹630 (est.)

                                                        via Faridabad · Delhi

                                                        1. 2:55 PMVAPIVapi

                                                          Train22917Haridwar SF Express

                                                          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 12:45 (12:45 PM) · you board on day 1

                                                          Ends at Haridwar Jn (HW) at Thu, 19 Nov 14:30

                                                          Runs: Wed

                                                          Indian Railways · 16 h 57 min · 1192 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹315SL ₹6003A ₹1,5402A ₹2,1601A ₹3,580(est.)

                                                          14 stops — Show or hide intermediate stops
                                                          1. 3:18 PMBLValsad · 2 min halt
                                                          2. 3:48 PMNVSNavsari · 2 min halt
                                                          3. 4:25 PMSTSurat · 5 min halt
                                                          4. 5:09 PMBHBharuch Jn · 2 min halt
                                                          5. 6:35 PMBRCVadodara Jn · 10 min halt
                                                          6. 10:35 PMRTMRatlam Jn · 10 min halt
                                                          7. 12:43 AMBWMBhawani Mandi · 2 min halt
                                                          8. 1:03 AMRMARamganj Mandi · 2 min halt
                                                          9. 2:00 AMKOTAKota Jn · 5 min halt
                                                          10. 3:18 AMSWMSawai Madhopur · 2 min halt
                                                          11. 4:00 AMGGCGangapur City · 5 min halt
                                                          12. 4:33 AMHANHindaun City · 2 min halt
                                                          13. 5:28 AMBTEBharatpur Jn · 2 min halt
                                                          14. 6:15 AMMTJMathura Jn · 2 min halt
                                                          7:52 AM+1 dayFDBFaridabad
                                                        2. Change at Faridabad

                                                          • Same station, no local travel
                                                          • Safety buffer: 231 min (3 h 51 min) Total wait: 231 min
                                                        3. 11:43 AM+1 dayFDBFaridabad

                                                          Train19023Mumbai Firozpur Janata Express

                                                          Starts from Mumbai Central (BCT) on Wed, 18 Nov at 07:25 (7:25 AM) · you board on day 2

                                                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                          Ends at Firozpur Cantt (FZR) at Thu, 19 Nov 22:20

                                                          Runs: Daily · Running days not verified — check before booking

                                                          Indian Railways · 23 min · 17 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹5SL ₹130(est.)

                                                          1 stop — Show or hide intermediate stops
                                                          1. 11:55 AMTKDTuglakabad · 2 min halt
                                                          12:06 PM+1 dayOKAOkhla
                                                        4. Change at Delhi

                                                          • Local transit: 50 min · Okhla (OKA) → Anand Vihar Terminal (ANVT)
                                                          • Safety buffer: 264 min (4 h 24 min) Total wait: 314 min

                                                          Station change — you must travel to a different station or bus stand

                                                          Partner link

                                                          Long wait at Delhi?

                                                          Find a room near Anand Vihar Terminal
                                                        5. 5:20 PM+1 dayANVTAnand Vihar Terminal

                                                          Train12236Anand Vihar - Madhupur Humsafar Express

                                                          Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 17:20 (5:20 PM) · you board on day 1

                                                          Ends at Madhupur Jn (MDP) at Fri, 20 Nov 10:20

                                                          Runs: Thu

                                                          Indian Railways · 15 h 30 min · 1166 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹310SL ₹5903A ₹1,520(est.)

                                                          8 stops — Show or hide intermediate stops
                                                          1. 10:12 PMCNBKanpur Central · 5 min halt
                                                          2. 12:23 AMPRYJPrayagraj Jn · 2 min halt
                                                          3. 2:33 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                          4. 3:40 AMBXRBuxar · 2 min halt
                                                          5. 4:25 AMARAAra · 2 min halt
                                                          6. 5:13 AMPNBEPatna Jn · 7 min halt
                                                          7. 6:21 AMMKAMokama · 2 min halt
                                                          8. 6:50 AMKIULKiul Jn · 2 min halt
                                                          8:50 AM+2 daysJAJJhajha

                                                      via Surat · 4 routes · best 42 h 1 min

                                                        All 4 combinations via Surat
                                                        1. Option 2: 11:39 PM5:40 PM+2 days

                                                          42 h 1 min1 changeSmallest buffer: 203 minfrom ₹480 (est.)

                                                          via Surat

                                                          1. 11:39 PMVAPIVapi

                                                            Train19707Aravalli Express

                                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1

                                                            Ends at Jaipur (JP) at Thu, 19 Nov 18:45

                                                            Runs: Daily · Running days not verified — check before booking

                                                            Indian Railways · 1 h 41 min · 95 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹30SL ₹1303A ₹4752A ₹665(est.)

                                                            1 stop — Show or hide intermediate stops
                                                            1. 12:43 AMNVSNavsari · 2 min halt
                                                            1:20 AM+1 daySTSurat
                                                          2. Change at Surat

                                                            • Same station, no local travel
                                                            • Safety buffer: 203 min (3 h 23 min) Total wait: 203 min

                                                            Night-time change — plan safe waiting and local transport

                                                            Partner link

                                                            Long wait at Surat?

                                                            Find a room near Surat
                                                          3. 4:43 AM+1 daySTSurat

                                                            Train19435Asansol Weekly Express

                                                            Starts from Ahmedabad Jn (ADI) on Thu, 19 Nov at 00:35 (12:35 AM) · you board on day 1

                                                            Ends at Asansol Jn (ASN) at Fri, 20 Nov 20:45

                                                            Runs: Thu

                                                            Indian Railways · 36 h 57 min · 1945 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹450SL ₹8403A ₹2,2152A ₹3,130(est.)

                                                            20 stops — Show or hide intermediate stops
                                                            1. 8:05 AMNDBNandurbar · 5 min halt
                                                            2. 8:44 AMDDEDondaicha · 1 min halt
                                                            3. 9:43 AMANAmalner · 2 min halt
                                                            4. 11:30 AMBSLBhusaval Jn · 5 min halt
                                                            5. 4:00 PMETItarsi Jn · 10 min halt
                                                            6. 5:47 PMRKMPRani Kamalapati · 5 min halt
                                                            7. 8:53 PMLARLalitpur · 2 min halt
                                                            8. 9:36 PMTKMGTikamgarh · 2 min halt
                                                            9. 10:22 PMKHGPKhargapur · 2 min halt
                                                            10. 10:50 PMMCSCMaharaja Chhatrasal Station Chhatarpur · 2 min halt
                                                            11. 12:10 AMKURJKhajuraho · 25 min halt
                                                            12. 1:50 AMMBAMahoba · 2 min halt
                                                            13. 2:50 AMBNDABanda Jn · 5 min halt
                                                            14. 4:00 AMCKTDChitrakut Dham Karwi · 2 min halt
                                                            15. 7:18 AMPCOIPrayagraj Chheoki · 2 min halt
                                                            16. 9:53 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                            17. 11:07 AMBXRBuxar · 2 min halt
                                                            18. 12:08 PMARAAra · 2 min halt
                                                            19. 12:48 PMDNRDanapur · 2 min halt
                                                            20. 1:28 PMPNBEPatna Jn · 7 min halt
                                                            5:40 PM+2 daysJAJJhajha
                                                        2. Option 3: 11:30 PM5:40 PM+2 days

                                                          42 h 10 min1 changeSmallest buffer: 221 minfrom ₹495 (est.)

                                                          via Surat

                                                          1. 11:30 PMVAPIVapi

                                                            Train22945Saurashtra Mail

                                                            Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 21:05 (9:05 PM) · you board on day 1

                                                            Ends at Okha (OKHA) at Thu, 19 Nov 14:50

                                                            Runs: Daily

                                                            Indian Railways · 1 h 32 min · 95 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹45SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                                            1 stop — Show or hide intermediate stops
                                                            1. 11:57 PMBLValsad · 2 min halt
                                                            1:02 AM+1 daySTSurat
                                                          2. Change at Surat

                                                            • Same station, no local travel
                                                            • Safety buffer: 221 min (3 h 41 min) Total wait: 221 min

                                                            Night-time change — plan safe waiting and local transport

                                                            Partner link

                                                            Long wait at Surat?

                                                            Find a room near Surat
                                                          3. 4:43 AM+1 daySTSurat

                                                            Train19435Asansol Weekly Express

                                                            Starts from Ahmedabad Jn (ADI) on Thu, 19 Nov at 00:35 (12:35 AM) · you board on day 1

                                                            Ends at Asansol Jn (ASN) at Fri, 20 Nov 20:45

                                                            Runs: Thu

                                                            Indian Railways · 36 h 57 min · 1945 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹450SL ₹8403A ₹2,2152A ₹3,130(est.)

                                                            20 stops — Show or hide intermediate stops
                                                            1. 8:05 AMNDBNandurbar · 5 min halt
                                                            2. 8:44 AMDDEDondaicha · 1 min halt
                                                            3. 9:43 AMANAmalner · 2 min halt
                                                            4. 11:30 AMBSLBhusaval Jn · 5 min halt
                                                            5. 4:00 PMETItarsi Jn · 10 min halt
                                                            6. 5:47 PMRKMPRani Kamalapati · 5 min halt
                                                            7. 8:53 PMLARLalitpur · 2 min halt
                                                            8. 9:36 PMTKMGTikamgarh · 2 min halt
                                                            9. 10:22 PMKHGPKhargapur · 2 min halt
                                                            10. 10:50 PMMCSCMaharaja Chhatrasal Station Chhatarpur · 2 min halt
                                                            11. 12:10 AMKURJKhajuraho · 25 min halt
                                                            12. 1:50 AMMBAMahoba · 2 min halt
                                                            13. 2:50 AMBNDABanda Jn · 5 min halt
                                                            14. 4:00 AMCKTDChitrakut Dham Karwi · 2 min halt
                                                            15. 7:18 AMPCOIPrayagraj Chheoki · 2 min halt
                                                            16. 9:53 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                            17. 11:07 AMBXRBuxar · 2 min halt
                                                            18. 12:08 PMARAAra · 2 min halt
                                                            19. 12:48 PMDNRDanapur · 2 min halt
                                                            20. 1:28 PMPNBEPatna Jn · 7 min halt
                                                            5:40 PM+2 daysJAJJhajha
                                                        3. Option 4: 9:25 PM5:40 PM+2 days

                                                          44 h 15 min1 changeSmallest buffer: 341 minfrom ₹495 (est.)

                                                          via Surat

                                                          1. 9:25 PMVAPIVapi

                                                            Train12971Bhavnagar Terminus SF Express

                                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 19:10 (7:10 PM) · you board on day 1

                                                            Ends at Bhavnagar Terminus (BVC) at Thu, 19 Nov 08:05

                                                            Runs: Daily

                                                            Indian Railways · 1 h 37 min · 95 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹45SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                                            2 stops — Show or hide intermediate stops
                                                            1. 9:48 PMBLValsad · 2 min halt
                                                            2. 10:18 PMNVSNavsari · 2 min halt
                                                            11:02 PMSTSurat
                                                          2. Change at Surat

                                                            • Same station, no local travel
                                                            • Safety buffer: 341 min (5 h 41 min) Total wait: 341 min

                                                            Night-time change — plan safe waiting and local transport

                                                            Partner link

                                                            Long wait at Surat?

                                                            Find a room near Surat
                                                          3. 4:43 AM+1 daySTSurat

                                                            Train19435Asansol Weekly Express

                                                            Starts from Ahmedabad Jn (ADI) on Thu, 19 Nov at 00:35 (12:35 AM) · you board on day 1

                                                            Ends at Asansol Jn (ASN) at Fri, 20 Nov 20:45

                                                            Runs: Thu

                                                            Indian Railways · 36 h 57 min · 1945 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹450SL ₹8403A ₹2,2152A ₹3,130(est.)

                                                            20 stops — Show or hide intermediate stops
                                                            1. 8:05 AMNDBNandurbar · 5 min halt
                                                            2. 8:44 AMDDEDondaicha · 1 min halt
                                                            3. 9:43 AMANAmalner · 2 min halt
                                                            4. 11:30 AMBSLBhusaval Jn · 5 min halt
                                                            5. 4:00 PMETItarsi Jn · 10 min halt
                                                            6. 5:47 PMRKMPRani Kamalapati · 5 min halt
                                                            7. 8:53 PMLARLalitpur · 2 min halt
                                                            8. 9:36 PMTKMGTikamgarh · 2 min halt
                                                            9. 10:22 PMKHGPKhargapur · 2 min halt
                                                            10. 10:50 PMMCSCMaharaja Chhatrasal Station Chhatarpur · 2 min halt
                                                            11. 12:10 AMKURJKhajuraho · 25 min halt
                                                            12. 1:50 AMMBAMahoba · 2 min halt
                                                            13. 2:50 AMBNDABanda Jn · 5 min halt
                                                            14. 4:00 AMCKTDChitrakut Dham Karwi · 2 min halt
                                                            15. 7:18 AMPCOIPrayagraj Chheoki · 2 min halt
                                                            16. 9:53 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                            17. 11:07 AMBXRBuxar · 2 min halt
                                                            18. 12:08 PMARAAra · 2 min halt
                                                            19. 12:48 PMDNRDanapur · 2 min halt
                                                            20. 1:28 PMPNBEPatna Jn · 7 min halt
                                                            5:40 PM+2 daysJAJJhajha
                                                        Search another date

                                                        via Kanpur · 1 route · best 42 h 7 min

                                                          All 1 combinations via Kanpur
                                                          1. Option 2: 3:53 PM10:00 AM+2 days

                                                            42 h 7 min2 changesSmallest buffer: 200 minfrom ₹570 (est.)

                                                            via Kanpur · Lakhisarai

                                                            1. 3:53 PMVAPIVapi

                                                              Train05092Gorakhpur Special Fare Festival Special

                                                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                              Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                              Runs: Wed

                                                              Indian Railways · 23 h 17 min · 1343 km

                                                              Scheduled timetable. From the published timetable. Delays are possible.

                                                              GN ₹330SL ₹6253A ₹1,6402A ₹2,320(est.)

                                                              8 stops — Show or hide intermediate stops
                                                              1. 5:00 PMSTSurat · 5 min halt
                                                              2. 6:40 PMBRCVadodara Jn · 5 min halt
                                                              3. 11:30 PMRTMRatlam Jn · 5 min halt
                                                              4. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                              5. 3:30 AMKOTAKota Jn · 10 min halt
                                                              6. 6:06 AMGGCGangapur City · 5 min halt
                                                              7. 9:10 AMIDHIdgah Agra Jn · 5 min halt
                                                              8. 10:55 AMTDLTundla Jn · 5 min halt
                                                              3:10 PM+1 dayCNBKanpur Central
                                                            2. Change at Kanpur

                                                              • Same station, no local travel
                                                              • Safety buffer: 200 min (3 h 20 min) Total wait: 200 min
                                                            3. 6:30 PM+1 dayCNBKanpur Central

                                                              Train12368Vikramshila Express

                                                              Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 13:15 (1:15 PM) · you board on day 1

                                                              Ends at Bhagalpur (BGP) at Fri, 20 Nov 08:15

                                                              Runs: Daily

                                                              Indian Railways · 9 h 45 min · 668 km

                                                              Scheduled timetable. From the published timetable. Delays are possible.

                                                              GN ₹195SL ₹3803A ₹9602A ₹1,3351A ₹2,205(est.)

                                                              11 stops — Show or hide intermediate stops
                                                              1. 11:28 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                              2. 12:40 AMBXRBuxar · 2 min halt
                                                              3. 1:25 AMARAAra · 2 min halt
                                                              4. 2:13 AMPNBEPatna Jn · 7 min halt
                                                              5. 2:38 AMPNCPatna Saheb · 5 min halt
                                                              6. 2:53 AMFUTFatuha · 2 min halt
                                                              7. 3:04 AMKOOKhusropur · 2 min halt
                                                              8. 3:18 AMBKPBakhtiyarpur Jn · 2 min halt
                                                              9. 3:33 AMBARHBarh · 2 min halt
                                                              10. 3:53 AMMKAMokama · 2 min halt
                                                              11. 4:04 AMHTZHathidah Jn · 2 min halt
                                                              4:15 AM+2 daysBRYABarhiya
                                                            4. Change at Lakhisarai

                                                              • Local transit: 65 min · Barhiya (BRYA) → Lakhisarai Bus Stand
                                                              • Safety buffer: 220 min (3 h 40 min) Total wait: 285 min

                                                              Night-time change — plan safe waiting and local transport

                                                              Partner link

                                                              Long wait at Lakhisarai?

                                                              Find a room near Lakhisarai Bus Stand
                                                            5. 9:00 AM+2 daysLakhisarai Bus Stand

                                                              BusState RTC (estimated) Ordinary

                                                              State RTC (estimated) · 1 h · 39 km · Runs every 60 min

                                                              Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                                              Ordinary ₹45(est.)

                                                              Buy at bus stand · every 60 min

                                                              10:00 AM+2 daysJamui Bus Stand

                                                          via Patna · 5 routes · best 42 h 20 min

                                                            All 5 combinations via Patna
                                                            1. Option 2: 6:28 PM12:48 PM+2 days

                                                              42 h 20 min2 changesSmallest buffer: 185 minfrom ₹445 (est.)

                                                              via Patna · Bakhtiyarpur

                                                              1. 6:28 PMVAPIVapi

                                                                Train19049Mumbai Bandra T - Patna Exp

                                                                Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                                                Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                                                Runs: Daily · Running days not verified — check before booking

                                                                Indian Railways · 33 h 2 min · 1689 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                                                                9 stops — Show or hide intermediate stops
                                                                1. 7:13 PMBLValsad · 2 min halt
                                                                2. 8:38 PMUDNUdhna Jn · 2 min halt
                                                                3. 12:05 AMNDBNandurbar · 20 min halt
                                                                4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                                                5. 11:11 AMNUNarsinghpur · 2 min halt
                                                                6. 12:30 PMJBPJabalpur · 10 min halt
                                                                7. 1:45 PMKTEKatni · 5 min halt
                                                                8. 3:10 PMSTASatna · 10 min halt
                                                                9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                                                                3:30 AM+2 daysPNBEPatna Jn
                                                              2. Change at Patna

                                                                • Same station, no local travel
                                                                • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min

                                                                Night-time change — plan safe waiting and local transport

                                                                Partner link

                                                                Long wait at Patna?

                                                                Find a room near Patna Jn
                                                              3. 6:35 AM+2 daysPNBEPatna Jn

                                                                Train13334Patna - Dumka Express

                                                                Starts from Patna Jn (PNBE) on Fri, 20 Nov at 06:35 (6:35 AM) · you board on day 1

                                                                Ends at Dumka (DUMK) at Fri, 20 Nov 13:25

                                                                Runs: Daily

                                                                Indian Railways · 39 min · 46 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹15SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                                                1 stop — Show or hide intermediate stops
                                                                1. 6:43 AMRJPBRajendra Nagar Terminal · 2 min halt
                                                                7:14 AM+2 daysBKPBakhtiyarpur Jn
                                                              4. Change at Bakhtiyarpur

                                                                • Same station, no local travel
                                                                • Safety buffer: 224 min (3 h 44 min) Total wait: 224 min
                                                              5. 10:58 AM+2 daysBKPBakhtiyarpur Jn

                                                                Train03054Howrah Chhath Puja Special

                                                                Starts from Patna Jn (PNBE) on Fri, 20 Nov at 10:00 (10:00 AM) · you board on day 1

                                                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 22:30

                                                                Runs: Daily

                                                                Indian Railways · 1 h 50 min · 105 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹30SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                                                7 stops — Show or hide intermediate stops
                                                                1. 11:11 AMBARHBarh · 2 min halt
                                                                2. 11:31 AMMKAMokama · 2 min halt
                                                                3. 11:42 AMHTZHathidah Jn · 2 min halt
                                                                4. 11:53 AMBRYABarhiya · 2 min halt
                                                                5. 12:10 PMLKRLuckeesarai Jn · 2 min halt
                                                                6. 12:16 PMKIULKiul Jn · 2 min halt
                                                                7. 12:33 PMMNPMananpur · 2 min halt
                                                                12:48 PM+2 daysJMUJamui
                                                            2. Option 3: 6:28 PM1:44 PM+2 days

                                                              43 h 16 min2 changesSmallest buffer: 196 minfrom ₹435 (est.)

                                                              via Patna · Begusarai

                                                              1. 6:28 PMVAPIVapi

                                                                Train19049Mumbai Bandra T - Patna Exp

                                                                Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                                                Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                                                Runs: Daily · Running days not verified — check before booking

                                                                Indian Railways · 33 h 2 min · 1689 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                                                                9 stops — Show or hide intermediate stops
                                                                1. 7:13 PMBLValsad · 2 min halt
                                                                2. 8:38 PMUDNUdhna Jn · 2 min halt
                                                                3. 12:05 AMNDBNandurbar · 20 min halt
                                                                4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                                                5. 11:11 AMNUNarsinghpur · 2 min halt
                                                                6. 12:30 PMJBPJabalpur · 10 min halt
                                                                7. 1:45 PMKTEKatni · 5 min halt
                                                                8. 3:10 PMSTASatna · 10 min halt
                                                                9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                                                                3:30 AM+2 daysPNBEPatna Jn
                                                              2. Change at Patna

                                                                • Local transit: 30 min · Patna Jn (PNBE) → Patna Saheb (PNC)
                                                                • Safety buffer: 208 min (3 h 28 min) Total wait: 238 min

                                                                Night-time change — plan safe waiting and local transport

                                                                Partner link

                                                                Long wait at Patna?

                                                                Find a room near Patna Saheb
                                                              3. 7:28 AM+2 daysPNCPatna Saheb

                                                                Train13228Saharsa Intercity Express

                                                                Starts from Rajendra Nagar Terminal (RJPB) on Fri, 20 Nov at 07:15 (7:15 AM) · you board on day 1

                                                                Ends at Saharsa Jn (SHC) at Fri, 20 Nov 13:30

                                                                Runs: Daily

                                                                Indian Railways · 1 h 8 min · 80 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹25CC ₹1353A ₹475(est.)

                                                                4 stops — Show or hide intermediate stops
                                                                1. 7:38 AMFUTFatuha · 2 min halt
                                                                2. 7:49 AMKOOKhusropur · 2 min halt
                                                                3. 8:03 AMBKPBakhtiyarpur Jn · 2 min halt
                                                                4. 8:17 AMBARHBarh · 2 min halt
                                                                8:36 AM+2 daysMKAMokama
                                                              4. Change at Begusarai

                                                                • Same station, no local travel
                                                                • Safety buffer: 196 min (3 h 16 min) Total wait: 196 min
                                                              5. 11:52 AM+2 daysMKAMokama

                                                                Train63208Patna Jhajha Passenger MEMU

                                                                Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:30 (8:30 AM) · you board on day 1

                                                                Ends at Jhajha (JAJ) at Fri, 20 Nov 14:40

                                                                Runs: Daily · Running days not verified — check before booking

                                                                Indian Railways · 1 h 52 min · 51 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹10(est.)

                                                                9 stops — Show or hide intermediate stops
                                                                1. 11:58 AMANAHAunta Halt
                                                                2. 12:03 PMHTZHathidah Jn · 1 min halt
                                                                3. 12:11 PMRDUMRampur Dumra · 1 min halt
                                                                4. 12:30 PMBRYABarhiya · 1 min halt
                                                                5. 12:54 PMMKBMankatha · 1 min halt
                                                                6. 1:02 PMLKRLuckeesarai Jn · 1 min halt
                                                                7. 1:13 PMKIULKiul Jn · 2 min halt
                                                                8. 1:27 PMBSQPBansipur · 1 min halt
                                                                9. 1:37 PMMNPMananpur · 1 min halt
                                                                1:44 PM+2 daysBFMBhalui
                                                            3. Option 4: 6:28 PM1:51 PM+2 days

                                                              43 h 23 min2 changesSmallest buffer: 194 minfrom ₹435 (est.)

                                                              via Patna · Begusarai

                                                              1. 6:28 PMVAPIVapi

                                                                Train19049Mumbai Bandra T - Patna Exp

                                                                Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 15:45 (3:45 PM) · you board on day 1

                                                                Ends at Patna Jn (PNBE) at Fri, 20 Nov 03:30

                                                                Runs: Daily · Running days not verified — check before booking

                                                                Indian Railways · 33 h 2 min · 1689 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹400SL ₹7503A ₹1,9702A ₹2,785(est.)

                                                                9 stops — Show or hide intermediate stops
                                                                1. 7:13 PMBLValsad · 2 min halt
                                                                2. 8:38 PMUDNUdhna Jn · 2 min halt
                                                                3. 12:05 AMNDBNandurbar · 20 min halt
                                                                4. 4:25 AMBSLBhusaval Jn · 5 min halt
                                                                5. 11:11 AMNUNarsinghpur · 2 min halt
                                                                6. 12:30 PMJBPJabalpur · 10 min halt
                                                                7. 1:45 PMKTEKatni · 5 min halt
                                                                8. 3:10 PMSTASatna · 10 min halt
                                                                9. 11:30 PMDDUPt. Deen Dayal Upadhyaya Jn · 15 min halt
                                                                3:30 AM+2 daysPNBEPatna Jn
                                                              2. Change at Patna

                                                                • Local transit: 30 min · Patna Jn (PNBE) → Patna Saheb (PNC)
                                                                • Safety buffer: 208 min (3 h 28 min) Total wait: 238 min

                                                                Night-time change — plan safe waiting and local transport

                                                                Partner link

                                                                Long wait at Patna?

                                                                Find a room near Patna Saheb
                                                              3. 7:28 AM+2 daysPNCPatna Saheb

                                                                Train13228Saharsa Intercity Express

                                                                Starts from Rajendra Nagar Terminal (RJPB) on Fri, 20 Nov at 07:15 (7:15 AM) · you board on day 1

                                                                Ends at Saharsa Jn (SHC) at Fri, 20 Nov 13:30

                                                                Runs: Daily

                                                                Indian Railways · 1 h 8 min · 80 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹25CC ₹1353A ₹475(est.)

                                                                4 stops — Show or hide intermediate stops
                                                                1. 7:38 AMFUTFatuha · 2 min halt
                                                                2. 7:49 AMKOOKhusropur · 2 min halt
                                                                3. 8:03 AMBKPBakhtiyarpur Jn · 2 min halt
                                                                4. 8:17 AMBARHBarh · 2 min halt
                                                                8:36 AM+2 daysMKAMokama
                                                              4. Change at Begusarai

                                                                • Same station, no local travel
                                                                • Safety buffer: 194 min (3 h 14 min) Total wait: 194 min
                                                              5. 11:50 AM+2 daysMKAMokama

                                                                Train13208Jasidih MEMU Express

                                                                Starts from Patna Jn (PNBE) on Fri, 20 Nov at 08:55 (8:55 AM) · you board on day 1

                                                                Ends at Jasidih Jn (JSME) at Fri, 20 Nov 16:52

                                                                Runs: Daily

                                                                Indian Railways · 2 h 1 min · 53 km

                                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                                GN ₹10(est.)

                                                                13 stops — Show or hide intermediate stops
                                                                1. 11:55 AMTALLTall Jn · 1 min halt
                                                                2. 12:00 PMHTZHathidah Jn · 2 min halt
                                                                3. 12:07 PMRDUMRampur Dumra · 1 min halt
                                                                4. 12:13 PMBRYABarhiya · 2 min halt
                                                                5. 12:21 PMGGSYGanga Sahai Halt · 1 min halt
                                                                6. 12:26 PMDMRXDumri · 1 min halt
                                                                7. 12:31 PMDJSDhurani Jwas Halt · 1 min halt
                                                                8. 12:36 PMMKBMankatha · 1 min halt
                                                                9. 12:45 PMLKRLuckeesarai Jn · 2 min halt
                                                                10. 1:21 PMKIULKiul Jn · 2 min halt
                                                                11. 1:30 PMMHLTMahesh Leta Halt · 1 min halt
                                                                12. 1:36 PMBSQPBansipur · 1 min halt
                                                                13. 1:44 PMMNPMananpur · 1 min halt
                                                                1:51 PM+2 daysBFMBhalui
                                                            Search another date

                                                            via Kota · 2 routes · best 42 h 34 min

                                                              All 2 combinations via Kota
                                                              1. Option 2: 12:57 PM7:31 AM+2 days

                                                                42 h 34 min2 changesSmallest buffer: 206 minfrom ₹575 (est.)

                                                                via Kota · Lakhisarai

                                                                1. 12:57 PMVAPIVapi

                                                                  Train21907Kathgodam SF Express

                                                                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                                                  Ends at Kathgodam (KGM) at Thu, 19 Nov 13:50

                                                                  Runs: Wed

                                                                  Indian Railways · 10 h 43 min · 755 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹215SL ₹4203A ₹1,0652A ₹1,485(est.)

                                                                  6 stops — Show or hide intermediate stops
                                                                  1. 1:20 PMBLValsad · 2 min halt
                                                                  2. 2:31 PMSTSurat · 5 min halt
                                                                  3. 4:20 PMBRCVadodara Jn · 10 min halt
                                                                  4. 8:10 PMRTMRatlam Jn · 10 min halt
                                                                  5. 9:53 PMSGZShamgarh · 2 min halt
                                                                  6. 10:33 PMRMARamganj Mandi · 2 min halt
                                                                  11:40 PMKOTAKota Jn
                                                                2. Change at Kota

                                                                  • Same station, no local travel
                                                                  • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                                                  Night-time change — plan safe waiting and local transport

                                                                  Partner link

                                                                  Long wait at Kota?

                                                                  Find a room near Kota Jn
                                                                3. 3:45 AM+1 dayKOTAKota Jn

                                                                  Train19423Ahmedabad - Bhagalpur Amrit Bharat Express

                                                                  Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 18:30 (6:30 PM) · you board on day 2

                                                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                                  Ends at Bhagalpur (BGP) at Fri, 20 Nov 06:40

                                                                  Runs: Wed

                                                                  Indian Railways · 23 h 45 min · 1270 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹315SL ₹595(est.)

                                                                  15 stops — Show or hide intermediate stops
                                                                  1. 4:53 AMSWMSawai Madhopur · 2 min halt
                                                                  2. 5:40 AMGGCGangapur City · 5 min halt
                                                                  3. 6:23 AMHANHindaun City · 2 min halt
                                                                  4. 7:33 AMBXNBayana Jn · 2 min halt
                                                                  5. 9:20 AMIDHIdgah Agra Jn · 5 min halt
                                                                  6. 10:40 AMTDLTundla Jn · 5 min halt
                                                                  7. 1:55 PMGOYGovindpuri · 5 min halt
                                                                  8. 4:25 PMSFGSubedarganj · 2 min halt
                                                                  9. 9:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                                  10. 10:30 PMBXRBuxar · 2 min halt
                                                                  11. 11:15 PMARAAra · 2 min halt
                                                                  12. 11:50 PMDNRDanapur · 2 min halt
                                                                  13. 12:43 AMPNBEPatna Jn · 7 min halt
                                                                  14. 1:25 AMBKPBakhtiyarpur Jn · 2 min halt
                                                                  15. 2:08 AMMKAMokama · 2 min halt
                                                                  3:30 AM+2 daysKIULKiul Jn
                                                                4. Change at Lakhisarai

                                                                  • Local transit: 15 min · Kiul Jn (KIUL) → Luckeesarai Jn (LKR)
                                                                  • Safety buffer: 206 min (3 h 26 min) Total wait: 221 min

                                                                  Night-time change — plan safe waiting and local transport

                                                                  Partner link

                                                                  Long wait at Lakhisarai?

                                                                  Find a room near Luckeesarai Jn
                                                                5. 7:11 AM+2 daysLKRLuckeesarai Jn

                                                                  Train12024Patna - Howrah Jan Shatabdi Express

                                                                  Starts from Patna Jn (PNBE) on Fri, 20 Nov at 05:30 (5:30 AM) · you board on day 1

                                                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 13:25

                                                                  Runs: Mon, Tue, Wed, Thu, Fri, Sat

                                                                  Indian Railways · 20 min · 29 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹45CC ₹145(est.)

                                                                  7:31 AM+2 daysJMUJamui
                                                              2. Option 3: 12:57 PM8:05 AM+2 days

                                                                43 h 8 min2 changesSmallest buffer: 192 minfrom ₹545 (est.)

                                                                via Kota · Lakhisarai

                                                                1. 12:57 PMVAPIVapi

                                                                  Train21907Kathgodam SF Express

                                                                  Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                                                  Ends at Kathgodam (KGM) at Thu, 19 Nov 13:50

                                                                  Runs: Wed

                                                                  Indian Railways · 10 h 43 min · 755 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹215SL ₹4203A ₹1,0652A ₹1,485(est.)

                                                                  6 stops — Show or hide intermediate stops
                                                                  1. 1:20 PMBLValsad · 2 min halt
                                                                  2. 2:31 PMSTSurat · 5 min halt
                                                                  3. 4:20 PMBRCVadodara Jn · 10 min halt
                                                                  4. 8:10 PMRTMRatlam Jn · 10 min halt
                                                                  5. 9:53 PMSGZShamgarh · 2 min halt
                                                                  6. 10:33 PMRMARamganj Mandi · 2 min halt
                                                                  11:40 PMKOTAKota Jn
                                                                2. Change at Kota

                                                                  • Same station, no local travel
                                                                  • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                                                  Night-time change — plan safe waiting and local transport

                                                                  Partner link

                                                                  Long wait at Kota?

                                                                  Find a room near Kota Jn
                                                                3. 3:45 AM+1 dayKOTAKota Jn

                                                                  Train19423Ahmedabad - Bhagalpur Amrit Bharat Express

                                                                  Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 18:30 (6:30 PM) · you board on day 2

                                                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                                  Ends at Bhagalpur (BGP) at Fri, 20 Nov 06:40

                                                                  Runs: Wed

                                                                  Indian Railways · 23 h 45 min · 1270 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹315SL ₹595(est.)

                                                                  15 stops — Show or hide intermediate stops
                                                                  1. 4:53 AMSWMSawai Madhopur · 2 min halt
                                                                  2. 5:40 AMGGCGangapur City · 5 min halt
                                                                  3. 6:23 AMHANHindaun City · 2 min halt
                                                                  4. 7:33 AMBXNBayana Jn · 2 min halt
                                                                  5. 9:20 AMIDHIdgah Agra Jn · 5 min halt
                                                                  6. 10:40 AMTDLTundla Jn · 5 min halt
                                                                  7. 1:55 PMGOYGovindpuri · 5 min halt
                                                                  8. 4:25 PMSFGSubedarganj · 2 min halt
                                                                  9. 9:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                                  10. 10:30 PMBXRBuxar · 2 min halt
                                                                  11. 11:15 PMARAAra · 2 min halt
                                                                  12. 11:50 PMDNRDanapur · 2 min halt
                                                                  13. 12:43 AMPNBEPatna Jn · 7 min halt
                                                                  14. 1:25 AMBKPBakhtiyarpur Jn · 2 min halt
                                                                  15. 2:08 AMMKAMokama · 2 min halt
                                                                  3:30 AM+2 daysKIULKiul Jn
                                                                4. Change at Lakhisarai

                                                                  • Same station, no local travel
                                                                  • Safety buffer: 192 min (3 h 12 min) Total wait: 192 min

                                                                  Night-time change — plan safe waiting and local transport

                                                                  Partner link

                                                                  Long wait at Lakhisarai?

                                                                  Find a room near Kiul Jn
                                                                5. 6:42 AM+2 daysKIULKiul Jn

                                                                  Train03038Howrah Jan Sadharan Festival Special

                                                                  Starts from Gorakhpur Jn (GKP) on Thu, 19 Nov at 20:35 (8:35 PM) · you board on day 2

                                                                  This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 15:40

                                                                  Runs: Sun, Thu, Sat

                                                                  Indian Railways · 1 h 23 min · 54 km

                                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                                  GN ₹15SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                                                  8:05 AM+2 daysJAJJhajha

                                                              Alternatives

                                                              End at a nearby station

                                                              Change at a different city

                                                              Other dates

                                                              Search another date

                                                              Frequently asked questions

                                                              Is there a direct train from Vapi to Jamui?
                                                              No direct train on a typical day. The fastest option is Train 59460 → Mumbai → Train 12362, taking 37 h 13 min in total.
                                                              What is the fastest way from Vapi to Jamui?
                                                              Train 59460 → Mumbai → Train 12362: 37 h 13 min in total, including a safe connection buffer.
                                                              What is the cheapest way from Vapi to Jamui?
                                                              From about ₹410 (estimate): Train 19049 → Varanasi → Train 63264 → Patna → Train 53204.
                                                              When are the first and last departures from Vapi to Jamui?
                                                              The first departure is at 00:22 and the last at 23:53 on a typical day.
                                                              Where can I change between Vapi and Jamui?
                                                              Combinations change at Mumbai, Delhi, Godhra, Ratlam.

                                                              Timetable data as of 2026-11-18. Always verify on the operator or partner site.