Skip to main content

Train & bus from Thane to Koderma

No direct train, no direct bus and 200 bus + train combinations connect Thane and Koderma. Fastest: 31 h 35 min via Prayagraj. Fares from ₹385 (est.). First departure 00:18, last 23:58.

No direct train — best combinations below.

Times for a typical Wednesday — check your dateCheck your travel date

Quick picks

  • Fastest

    Train 22183→ Prayagraj →Train 1280206:20–13:55 · 31 h 35 min · from ₹480 (est.)
  • Cheapest

    Train 01051→ Prayagraj →Train 65118→ Varanasi →Train 5352212:38–13:37 · 48 h 59 min · from ₹385 (est.)
  • Fewest changes

    Train 22183→ Prayagraj →Train 1280206:20–13:55 · 31 h 35 min · from ₹480 (est.)

Bus + train and other combinations (200)

via Prayagraj · 15 routes · best 31 h 35 min

  1. Option 1: 6:20 AM1:55 PM+1 day

    31 h 35 min1 changeSmallest buffer: 190 minfrom ₹480 (est.)

    via Prayagraj

    • Fastest
    • Different change city
    1. 6:20 AMTNAThane

      Train22183Saket SF Express

      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 06:00 (6:00 AM) · you board on day 1

      Ends at Ayodhya Cantt (AYC) at Thu, 19 Nov 08:00

      Runs: Wed, Sat

      Indian Railways · 21 h 30 min · 1328 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹345SL ₹6503A ₹1,6702A ₹2,345(est.)

      14 stops — Show or hide intermediate stops
      1. 6:37 AMKYNKalyan Jn · 3 min halt
      2. 8:27 AMIGPIgatpuri · 5 min halt
      3. 9:40 AMNKNasik Road · 5 min halt
      4. 10:50 AMMMRManmad Jn · 5 min halt
      5. 1:05 PMBSLBhusaval Jn · 5 min halt
      6. 1:58 PMBAUBurhanpur · 2 min halt
      7. 3:12 PMKNWKhandwa · 3 min halt
      8. 6:00 PMETItarsi Jn · 10 min halt
      9. 7:03 PMPPIPipariya · 2 min halt
      10. 8:08 PMNUNarsinghpur · 2 min halt
      11. 9:40 PMJBPJabalpur · 10 min halt
      12. 11:05 PMKTEKatni · 5 min halt
      13. 12:25 AMSTASatna · 5 min halt
      14. 2:00 AMMKPManikpur Jn · 2 min halt
      3:50 AM+1 dayPRYJPrayagraj Jn
    2. Change at Prayagraj

      • Same station, no local travel
      • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min

      Night-time change — plan safe waiting and local transport

      Partner link

      Long wait at Prayagraj?

      Find a room near Prayagraj Jn
    3. 7:00 AM+1 dayPRYJPrayagraj Jn

      Train12802Purushottam Express

      Starts from Anand Vihar Terminal (ANVT) on Wed, 18 Nov at 22:45 (10:45 PM) · you board on day 2

      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Puri (PURI) at Fri, 20 Nov 05:50

      Runs: Daily

      Indian Railways · 6 h 55 min · 436 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

      9 stops — Show or hide intermediate stops
      1. 8:10 AMMZPMirzapur · 2 min halt
      2. 8:35 AMCARChunar · 2 min halt
      3. 9:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      4. 10:30 AMBBUBhabua Road · 2 min halt
      5. 11:04 AMSSMSasaram · 2 min halt
      6. 11:20 AMDOSDehri ON Sone · 2 min halt
      7. 11:38 AMAUBRAnugraha N Road · 2 min halt
      8. 12:35 PMGAYAGaya Jn · 5 min halt
      9. 1:18 PMPRPPaharpur · 2 min halt
      1:55 PM+1 dayKQRKoderma
All 15 combinations via Prayagraj
  1. Option 2: 11:55 PM9:02 AM+2 days

    33 h 7 min1 changeSmallest buffer: 237 minfrom ₹475 (est.)

    via Prayagraj

    1. 11:55 PMTNAThane

      Train12141Patliputra SF Express

      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

      Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

      Runs: Daily

      Indian Railways · 21 h 23 min · 1321 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹340SL ₹6453A ₹1,6652A ₹2,3351A ₹3,870(est.)

      8 stops — Show or hide intermediate stops
      1. 12:17 AMKYNKalyan Jn · 3 min halt
      2. 2:40 AMNKNasik Road · 5 min halt
      3. 3:43 AMMMRManmad Jn · 2 min halt
      4. 5:33 AMJLJalgaon Jn · 2 min halt
      5. 6:15 AMBSLBhusaval Jn · 5 min halt
      6. 10:55 AMETItarsi Jn · 10 min halt
      7. 2:20 PMJBPJabalpur · 10 min halt
      8. 5:35 PMSTASatna · 5 min halt
      9:18 PM+1 dayPCOIPrayagraj Chheoki
    2. Change at Prayagraj

      • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
      • Safety buffer: 237 min (3 h 57 min) Total wait: 277 min

      Night-time change — plan safe waiting and local transport

      Partner link

      Long wait at Prayagraj?

      Find a room near Prayagraj Jn
    3. 1:55 AM+2 daysPRYJPrayagraj Jn

      Train12988Sealdah SF Express

      Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 2

      This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

      Runs: Daily

      Indian Railways · 7 h 7 min · 436 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

      5 stops — Show or hide intermediate stops
      1. 4:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      2. 5:35 AMBBUBhabua Road · 2 min halt
      3. 6:05 AMSSMSasaram · 2 min halt
      4. 6:20 AMDOSDehri ON Sone · 2 min halt
      5. 7:50 AMGAYAGaya Jn · 5 min halt
      9:02 AM+2 daysKQRKoderma
  2. Option 3: 12:38 PM10:24 PM+1 day

    33 h 46 min1 changeSmallest buffer: 235 minfrom ₹460 (est.)

    via Prayagraj

    1. 12:38 PMTNAThane

      Train01051Banaras Special Fare Festival Special

      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 12:15 (12:15 PM) · you board on day 1

      Ends at Banaras (BNRS) at Thu, 19 Nov 16:05

      Runs: Wed, Thu

      Indian Railways · 22 h 32 min · 1321 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹325SL ₹6153A ₹1,620(est.)

      14 stops — Show or hide intermediate stops
      1. 12:52 PMKYNKalyan Jn · 3 min halt
      2. 2:40 PMIGPIgatpuri · 5 min halt
      3. 3:12 PMNKNasik Road · 3 min halt
      4. 6:45 PMJLJalgaon Jn · 3 min halt
      5. 7:10 PMBSLBhusaval Jn · 5 min halt
      6. 8:57 PMKNWKhandwa · 3 min halt
      7. 11:56 PMETItarsi Jn · 5 min halt
      8. 12:50 AMPPIPipariya · 2 min halt
      9. 1:53 AMNUNarsinghpur · 2 min halt
      10. 3:20 AMMMLMadan Mahal · 5 min halt
      11. 4:40 AMKTEKatni · 10 min halt
      12. 6:38 AMMYRMaihar · 2 min halt
      13. 7:10 AMSTASatna · 5 min halt
      14. 9:00 AMMKPManikpur Jn · 2 min halt
      11:10 AM+1 dayPCOIPrayagraj Chheoki
    2. Change at Prayagraj

      • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
      • Safety buffer: 235 min (3 h 55 min) Total wait: 275 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Prayagraj?

      Find a room near Prayagraj Jn
    3. 3:45 PM+1 dayPRYJPrayagraj Jn

      Train22308Howrah SF Express

      Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

      Runs: Sun, Wed, Sat

      Indian Railways · 6 h 39 min · 436 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

      7 stops — Show or hide intermediate stops
      1. 4:48 PMMZPMirzapur · 2 min halt
      2. 6:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      3. 7:00 PMBBUBhabua Road · 2 min halt
      4. 7:30 PMSSMSasaram · 2 min halt
      5. 7:50 PMDOSDehri ON Sone · 2 min halt
      6. 8:08 PMAUBRAnugraha N Road · 2 min halt
      7. 9:10 PMGAYAGaya Jn · 5 min halt
      10:24 PM+1 dayKQRKoderma
Search another date

via Chalisgaon · 1 route · best 31 h 43 min

  1. Option 1: 7:45 PM3:28 AM+2 days

    31 h 43 min1 changeSmallest buffer: 202 minfrom ₹470 (est.)

    via Chalisgaon

    • Different change city
    1. 7:45 PMTNAThane

      Train12105Vidarbha SF Express

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

      Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

      Runs: Daily

      Indian Railways · 4 h 28 min · 293 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹100SL ₹2103A ₹5202A ₹7101A ₹1,155(est.)

      4 stops — Show or hide intermediate stops
      1. 8:04 PMKYNKalyan Jn · 3 min halt
      2. 9:30 PMIGPIgatpuri · 5 min halt
      3. 10:22 PMNKNasik Road · 3 min halt
      4. 11:23 PMMMRManmad Jn · 2 min halt
      12:13 AM+1 dayCSNChalisgaon Jn
    2. Change at Chalisgaon

      • Same station, no local travel
      • Safety buffer: 202 min (3 h 22 min) Total wait: 202 min

      Night-time change — plan safe waiting and local transport

      Partner link

      Long wait at Chalisgaon?

      Find a room near Chalisgaon Jn
    3. 3:35 AM+1 dayCSNChalisgaon Jn

      Train12322Howrah Mail

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

      Runs: Daily

      Indian Railways · 23 h 53 min · 1456 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹370SL ₹6953A ₹1,7952A ₹2,5151A ₹4,175(est.)

      27 stops — Show or hide intermediate stops
      1. 4:48 AMJLJalgaon Jn · 2 min halt
      2. 5:20 AMBSLBhusaval Jn · 5 min halt
      3. 6:08 AMBAUBurhanpur · 2 min halt
      4. 7:23 AMKNWKhandwa · 2 min halt
      5. 8:30 AMHDHarda · 2 min halt
      6. 9:50 AMETItarsi Jn · 10 min halt
      7. 10:46 AMPPIPipariya · 2 min halt
      8. 11:20 AMGARGadarwara · 2 min halt
      9. 11:40 AMKYKareli · 2 min halt
      10. 11:54 AMNUNarsinghpur · 2 min halt
      11. 12:20 PMSRIDSridham · 2 min halt
      12. 1:20 PMJBPJabalpur · 10 min halt
      13. 2:35 PMKTEKatni · 5 min halt
      14. 3:28 PMMYRMaihar · 2 min halt
      15. 4:20 PMSTASatna · 5 min halt
      16. 5:50 PMMKPManikpur Jn · 2 min halt
      17. 6:43 PMSRJShankargarh · 1 min halt
      18. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
      19. 8:20 PMBDLVindhyachal · 2 min halt
      20. 8:35 PMMZPMirzapur · 5 min halt
      21. 9:13 PMCARChunar · 2 min halt
      22. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      23. 11:36 PMBBUBhabua Road · 2 min halt
      24. 12:08 AMSSMSasaram · 2 min halt
      25. 12:24 AMDOSDehri ON Sone · 2 min halt
      26. 12:40 AMAUBRAnugraha N Road · 2 min halt
      27. 2:05 AMGAYAGaya Jn · 5 min halt
      3:28 AM+2 daysKQRKoderma

via Kalyan · 3 routes · best 31 h 43 min

  1. Option 1: 7:45 PM3:28 AM+2 days

    31 h 43 min1 changeSmallest buffer: 191 minfrom ₹445 (est.)

    via Kalyan

    • Best
    • Fewest changes
    1. 7:45 PMTNAThane

      Train12105Vidarbha SF Express

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

      Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

      Runs: Daily

      Indian Railways · 19 min · 21 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹20SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

      8:04 PMKYNKalyan Jn
    2. Change at Kalyan

      • Same station, no local travel
      • Safety buffer: 191 min (3 h 11 min) Total wait: 191 min
    3. 11:15 PMKYNKalyan Jn

      Train12322Howrah Mail

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

      Runs: Daily

      Indian Railways · 28 h 13 min · 1728 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹425SL ₹7903A ₹2,0502A ₹2,8851A ₹4,790(est.)

      31 stops — Show or hide intermediate stops
      1. 12:17 AMKSRAKasara · 3 min halt
      2. 1:35 AMNKNasik Road · 5 min halt
      3. 2:37 AMMMRManmad Jn · 3 min halt
      4. 3:33 AMCSNChalisgaon Jn · 2 min halt
      5. 4:48 AMJLJalgaon Jn · 2 min halt
      6. 5:20 AMBSLBhusaval Jn · 5 min halt
      7. 6:08 AMBAUBurhanpur · 2 min halt
      8. 7:23 AMKNWKhandwa · 2 min halt
      9. 8:30 AMHDHarda · 2 min halt
      10. 9:50 AMETItarsi Jn · 10 min halt
      11. 10:46 AMPPIPipariya · 2 min halt
      12. 11:20 AMGARGadarwara · 2 min halt
      13. 11:40 AMKYKareli · 2 min halt
      14. 11:54 AMNUNarsinghpur · 2 min halt
      15. 12:20 PMSRIDSridham · 2 min halt
      16. 1:20 PMJBPJabalpur · 10 min halt
      17. 2:35 PMKTEKatni · 5 min halt
      18. 3:28 PMMYRMaihar · 2 min halt
      19. 4:20 PMSTASatna · 5 min halt
      20. 5:50 PMMKPManikpur Jn · 2 min halt
      21. 6:43 PMSRJShankargarh · 1 min halt
      22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
      23. 8:20 PMBDLVindhyachal · 2 min halt
      24. 8:35 PMMZPMirzapur · 5 min halt
      25. 9:13 PMCARChunar · 2 min halt
      26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      27. 11:36 PMBBUBhabua Road · 2 min halt
      28. 12:08 AMSSMSasaram · 2 min halt
      29. 12:24 AMDOSDehri ON Sone · 2 min halt
      30. 12:40 AMAUBRAnugraha N Road · 2 min halt
      31. 2:05 AMGAYAGaya Jn · 5 min halt
      3:28 AM+2 daysKQRKoderma
All 3 combinations via Kalyan
  1. Option 2: 5:57 PM3:28 AM+2 days

    33 h 31 min1 changeSmallest buffer: 268 minfrom ₹435 (est.)

    via Kalyan

    1. 5:57 PMKHBVKharbao

      Train61021Vasai Road - Diva Local

      Starts from Vasai Road (BSR) on Wed, 18 Nov at 17:35 (5:35 PM) · you board on day 1

      Ends at Diva (DIVA) at Wed, 18 Nov 18:35

      Runs: Daily

      Indian Railways · 20 min · 16 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10(est.)

      1 stop — Show or hide intermediate stops
      1. 6:05 PMBIRDBhivandi Road · 1 min halt
      6:17 PMKOPRKopar
    2. Change at Kalyan

      • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
      • Safety buffer: 268 min (4 h 28 min) Total wait: 298 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Kalyan?

      Find a room near Kalyan Jn
    3. 11:15 PMKYNKalyan Jn

      Train12322Howrah Mail

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

      Runs: Daily

      Indian Railways · 28 h 13 min · 1728 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹425SL ₹7903A ₹2,0502A ₹2,8851A ₹4,790(est.)

      31 stops — Show or hide intermediate stops
      1. 12:17 AMKSRAKasara · 3 min halt
      2. 1:35 AMNKNasik Road · 5 min halt
      3. 2:37 AMMMRManmad Jn · 3 min halt
      4. 3:33 AMCSNChalisgaon Jn · 2 min halt
      5. 4:48 AMJLJalgaon Jn · 2 min halt
      6. 5:20 AMBSLBhusaval Jn · 5 min halt
      7. 6:08 AMBAUBurhanpur · 2 min halt
      8. 7:23 AMKNWKhandwa · 2 min halt
      9. 8:30 AMHDHarda · 2 min halt
      10. 9:50 AMETItarsi Jn · 10 min halt
      11. 10:46 AMPPIPipariya · 2 min halt
      12. 11:20 AMGARGadarwara · 2 min halt
      13. 11:40 AMKYKareli · 2 min halt
      14. 11:54 AMNUNarsinghpur · 2 min halt
      15. 12:20 PMSRIDSridham · 2 min halt
      16. 1:20 PMJBPJabalpur · 10 min halt
      17. 2:35 PMKTEKatni · 5 min halt
      18. 3:28 PMMYRMaihar · 2 min halt
      19. 4:20 PMSTASatna · 5 min halt
      20. 5:50 PMMKPManikpur Jn · 2 min halt
      21. 6:43 PMSRJShankargarh · 1 min halt
      22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
      23. 8:20 PMBDLVindhyachal · 2 min halt
      24. 8:35 PMMZPMirzapur · 5 min halt
      25. 9:13 PMCARChunar · 2 min halt
      26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      27. 11:36 PMBBUBhabua Road · 2 min halt
      28. 12:08 AMSSMSasaram · 2 min halt
      29. 12:24 AMDOSDehri ON Sone · 2 min halt
      30. 12:40 AMAUBRAnugraha N Road · 2 min halt
      31. 2:05 AMGAYAGaya Jn · 5 min halt
      3:28 AM+2 daysKQRKoderma
  2. Option 3: 5:57 PM3:45 AM+2 days

    33 h 48 min1 changeSmallest buffer: 268 minfrom ₹440 (est.)

    via Kalyan

    1. 5:57 PMKHBVKharbao

      Train61021Vasai Road - Diva Local

      Starts from Vasai Road (BSR) on Wed, 18 Nov at 17:35 (5:35 PM) · you board on day 1

      Ends at Diva (DIVA) at Wed, 18 Nov 18:35

      Runs: Daily

      Indian Railways · 20 min · 16 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10(est.)

      1 stop — Show or hide intermediate stops
      1. 6:05 PMBIRDBhivandi Road · 1 min halt
      6:17 PMKOPRKopar
    2. Change at Kalyan

      • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
      • Safety buffer: 268 min (4 h 28 min) Total wait: 298 min

      Station change — you must travel to a different station or bus stand

      Partner link

      Long wait at Kalyan?

      Find a room near Kalyan Jn
    3. 11:15 PMKYNKalyan Jn

      Train12322Howrah Mail

      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

      Runs: Daily

      Indian Railways · 28 h 30 min · 1754 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹430SL ₹8003A ₹2,0752A ₹2,9201A ₹4,845(est.)

      32 stops — Show or hide intermediate stops
      1. 12:17 AMKSRAKasara · 3 min halt
      2. 1:35 AMNKNasik Road · 5 min halt
      3. 2:37 AMMMRManmad Jn · 3 min halt
      4. 3:33 AMCSNChalisgaon Jn · 2 min halt
      5. 4:48 AMJLJalgaon Jn · 2 min halt
      6. 5:20 AMBSLBhusaval Jn · 5 min halt
      7. 6:08 AMBAUBurhanpur · 2 min halt
      8. 7:23 AMKNWKhandwa · 2 min halt
      9. 8:30 AMHDHarda · 2 min halt
      10. 9:50 AMETItarsi Jn · 10 min halt
      11. 10:46 AMPPIPipariya · 2 min halt
      12. 11:20 AMGARGadarwara · 2 min halt
      13. 11:40 AMKYKareli · 2 min halt
      14. 11:54 AMNUNarsinghpur · 2 min halt
      15. 12:20 PMSRIDSridham · 2 min halt
      16. 1:20 PMJBPJabalpur · 10 min halt
      17. 2:35 PMKTEKatni · 5 min halt
      18. 3:28 PMMYRMaihar · 2 min halt
      19. 4:20 PMSTASatna · 5 min halt
      20. 5:50 PMMKPManikpur Jn · 2 min halt
      21. 6:43 PMSRJShankargarh · 1 min halt
      22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
      23. 8:20 PMBDLVindhyachal · 2 min halt
      24. 8:35 PMMZPMirzapur · 5 min halt
      25. 9:13 PMCARChunar · 2 min halt
      26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      27. 11:36 PMBBUBhabua Road · 2 min halt
      28. 12:08 AMSSMSasaram · 2 min halt
      29. 12:24 AMDOSDehri ON Sone · 2 min halt
      30. 12:40 AMAUBRAnugraha N Road · 2 min halt
      31. 2:05 AMGAYAGaya Jn · 5 min halt
      32. 3:28 AMKQRKoderma · 2 min halt
      3:45 AM+2 daysPSBParsabad

via Nashik · 1 route · best 31 h 43 min

    All 1 combinations via Nashik
    1. Option 2: 7:45 PM3:28 AM+2 days

      31 h 43 min1 changeSmallest buffer: 198 minfrom ₹455 (est.)

      via Nashik

      • Different change city
      1. 7:45 PMTNAThane

        Train12105Vidarbha SF Express

        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

        Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

        Runs: Daily

        Indian Railways · 2 h 37 min · 153 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹60SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

        2 stops — Show or hide intermediate stops
        1. 8:04 PMKYNKalyan Jn · 3 min halt
        2. 9:30 PMIGPIgatpuri · 5 min halt
        10:22 PMNKNasik Road
      2. Change at Nashik

        • Same station, no local travel
        • Safety buffer: 198 min (3 h 18 min) Total wait: 198 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Nashik?

        Find a room near Nasik Road
      3. 1:40 AM+1 dayNKNasik Road

        Train12322Howrah Mail

        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

        Runs: Daily

        Indian Railways · 25 h 48 min · 1596 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹395SL ₹7453A ₹1,9252A ₹2,7051A ₹4,490(est.)

        29 stops — Show or hide intermediate stops
        1. 2:37 AMMMRManmad Jn · 3 min halt
        2. 3:33 AMCSNChalisgaon Jn · 2 min halt
        3. 4:48 AMJLJalgaon Jn · 2 min halt
        4. 5:20 AMBSLBhusaval Jn · 5 min halt
        5. 6:08 AMBAUBurhanpur · 2 min halt
        6. 7:23 AMKNWKhandwa · 2 min halt
        7. 8:30 AMHDHarda · 2 min halt
        8. 9:50 AMETItarsi Jn · 10 min halt
        9. 10:46 AMPPIPipariya · 2 min halt
        10. 11:20 AMGARGadarwara · 2 min halt
        11. 11:40 AMKYKareli · 2 min halt
        12. 11:54 AMNUNarsinghpur · 2 min halt
        13. 12:20 PMSRIDSridham · 2 min halt
        14. 1:20 PMJBPJabalpur · 10 min halt
        15. 2:35 PMKTEKatni · 5 min halt
        16. 3:28 PMMYRMaihar · 2 min halt
        17. 4:20 PMSTASatna · 5 min halt
        18. 5:50 PMMKPManikpur Jn · 2 min halt
        19. 6:43 PMSRJShankargarh · 1 min halt
        20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
        21. 8:20 PMBDLVindhyachal · 2 min halt
        22. 8:35 PMMZPMirzapur · 5 min halt
        23. 9:13 PMCARChunar · 2 min halt
        24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        25. 11:36 PMBBUBhabua Road · 2 min halt
        26. 12:08 AMSSMSasaram · 2 min halt
        27. 12:24 AMDOSDehri ON Sone · 2 min halt
        28. 12:40 AMAUBRAnugraha N Road · 2 min halt
        29. 2:05 AMGAYAGaya Jn · 5 min halt
        3:28 AM+2 daysKQRKoderma

    via Varanasi · 26 routes · best 31 h 55 min

      All 26 combinations via Varanasi
      1. Option 2: 11:55 AM7:50 PM+1 day

        31 h 55 min1 changeSmallest buffer: 222 minfrom ₹845 (est.)

        via Varanasi

        1. 11:55 AMTNAThane

          Train11061Pawan Express

          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

          Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

          Runs: Daily

          Indian Railways · 23 h 58 min · 1447 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹350SL ₹6603A ₹1,7402A ₹2,460(est.)

          21 stops — Show or hide intermediate stops
          1. 12:12 PMKYNKalyan Jn · 3 min halt
          2. 2:50 PMNKNasik Road · 5 min halt
          3. 4:00 PMMMRManmad Jn · 5 min halt
          4. 4:53 PMCSNChalisgaon Jn · 2 min halt
          5. 5:28 PMPCPachora Jn · 2 min halt
          6. 6:13 PMJLJalgaon Jn · 2 min halt
          7. 6:45 PMBSLBhusaval Jn · 5 min halt
          8. 7:38 PMBAUBurhanpur · 2 min halt
          9. 8:57 PMKNWKhandwa · 3 min halt
          10. 11:20 PMETItarsi Jn · 10 min halt
          11. 12:18 AMPPIPipariya · 2 min halt
          12. 1:18 AMNUNarsinghpur · 2 min halt
          13. 2:40 AMJBPJabalpur · 10 min halt
          14. 4:00 AMKTEKatni · 5 min halt
          15. 4:48 AMMYRMaihar · 2 min halt
          16. 5:25 AMSTASatna · 5 min halt
          17. 7:25 AMMKPManikpur Jn · 2 min halt
          18. 8:59 AMNYNNaini · 1 min halt
          19. 9:30 AMPRYJPrayagraj Jn · 25 min halt
          20. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
          21. 11:08 AMGYNGyanpur Road · 2 min halt
          11:53 AM+1 dayBHLPBhulanpur
        2. Change at Varanasi

          • Local transit: 65 min · Bhulanpur (BHLP) → Pt. Deen Dayal Upadhyaya Jn (DDU)
          • Safety buffer: 222 min (3 h 42 min) Total wait: 287 min

          Station change — you must travel to a different station or bus stand

          Partner link

          Long wait at Varanasi?

          Find a room near Pt. Deen Dayal Upadhyaya Jn
        3. 4:40 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

          Train20888Varanasi - Ranchi Vande Bharat Express

          Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 15:55 (3:55 PM) · you board on day 1

          Ends at Ranchi (RNC) at Thu, 19 Nov 23:55

          Runs: Sun, Mon, Wed, Thu, Fri, Sat

          Indian Railways · 3 h 10 min · 284 km

          Scheduled timetable. From the published timetable. Delays are possible.

          CC ₹495(est.)

          2 stops — Show or hide intermediate stops
          1. 5:40 PMSSMSasaram · 2 min halt
          2. 6:45 PMGAYAGaya Jn · 5 min halt
          7:50 PM+1 dayKQRKoderma
      2. Option 3: 11:55 PM7:55 AM+2 days

        32 h1 changeSmallest buffer: 262 minfrom ₹1,000 (est.)

        via Varanasi

        1. 11:55 PMTNAThane

          Train12141Patliputra SF Express

          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

          Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

          Runs: Daily

          Indian Railways · 24 h 23 min · 1464 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹370SL ₹6953A ₹1,8002A ₹2,5251A ₹4,195(est.)

          9 stops — Show or hide intermediate stops
          1. 12:17 AMKYNKalyan Jn · 3 min halt
          2. 2:40 AMNKNasik Road · 5 min halt
          3. 3:43 AMMMRManmad Jn · 2 min halt
          4. 5:33 AMJLJalgaon Jn · 2 min halt
          5. 6:15 AMBSLBhusaval Jn · 5 min halt
          6. 10:55 AMETItarsi Jn · 10 min halt
          7. 2:20 PMJBPJabalpur · 10 min halt
          8. 5:35 PMSTASatna · 5 min halt
          9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
          12:18 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn
        2. Change at Varanasi

          • Same station, no local travel
          • Safety buffer: 262 min (4 h 22 min) Total wait: 262 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Varanasi?

          Find a room near Pt. Deen Dayal Upadhyaya Jn
        3. 4:40 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

          Train12260Bikaner - Sealdah AC Duronto Express

          Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 12:10 (12:10 PM) · you board on day 2

          This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Sealdah (SDAH) at Fri, 20 Nov 13:30

          Runs: Mon, Tue, Thu, Fri

          Indian Railways · 3 h 15 min · 284 km

          Scheduled timetable. From the published timetable. Delays are possible.

          3A ₹6302A ₹8651A ₹1,410(est.)

          7:55 AM+2 daysKQRKoderma
      3. Option 4: 11:55 PM9:02 AM+2 days

        33 h 7 min1 changeSmallest buffer: 277 minfrom ₹465 (est.)

        via Varanasi

        1. 11:55 PMTNAThane

          Train12141Patliputra SF Express

          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

          Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

          Runs: Daily

          Indian Railways · 24 h 23 min · 1464 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹370SL ₹6953A ₹1,8002A ₹2,5251A ₹4,195(est.)

          9 stops — Show or hide intermediate stops
          1. 12:17 AMKYNKalyan Jn · 3 min halt
          2. 2:40 AMNKNasik Road · 5 min halt
          3. 3:43 AMMMRManmad Jn · 2 min halt
          4. 5:33 AMJLJalgaon Jn · 2 min halt
          5. 6:15 AMBSLBhusaval Jn · 5 min halt
          6. 10:55 AMETItarsi Jn · 10 min halt
          7. 2:20 PMJBPJabalpur · 10 min halt
          8. 5:35 PMSTASatna · 5 min halt
          9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
          12:18 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn
        2. Change at Varanasi

          • Same station, no local travel
          • Safety buffer: 277 min (4 h 37 min) Total wait: 277 min

          Night-time change — plan safe waiting and local transport

          Partner link

          Long wait at Varanasi?

          Find a room near Pt. Deen Dayal Upadhyaya Jn
        3. 4:55 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

          Train12988Sealdah SF Express

          Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 2

          This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

          Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

          Runs: Daily

          Indian Railways · 4 h 7 min · 283 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹95SL ₹2053A ₹5202A ₹7101A ₹1,155(est.)

          4 stops — Show or hide intermediate stops
          1. 5:35 AMBBUBhabua Road · 2 min halt
          2. 6:05 AMSSMSasaram · 2 min halt
          3. 6:20 AMDOSDehri ON Sone · 2 min halt
          4. 7:50 AMGAYAGaya Jn · 5 min halt
          9:02 AM+2 daysKQRKoderma
      Search another date

      via Mumbai · 2 routes · best 33 h 6 min

        All 2 combinations via Mumbai
        1. Option 2: 6:22 PM3:28 AM+2 days

          33 h 6 min1 changeSmallest buffer: 224 minfrom ₹435 (est.)

          via Mumbai

          1. 6:22 PMTNAThane

            Train11008Deccan Express

            Starts from Pune Jn (PUNE) on Wed, 18 Nov at 15:27 (3:27 PM) · you board on day 1

            Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 19:15

            Runs: Daily

            Indian Railways · 24 min · 24 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹5CC ₹100(est.)

            6:46 PMDRDadar
          2. Change at Mumbai

            • Same station, no local travel
            • Safety buffer: 224 min (3 h 44 min) Total wait: 224 min
          3. 10:30 PMDRDadar

            Train12322Howrah Mail

            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

            Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

            Runs: Daily

            Indian Railways · 28 h 58 min · 1773 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹430SL ₹8103A ₹2,0952A ₹2,9451A ₹4,890(est.)

            32 stops — Show or hide intermediate stops
            1. 11:12 PMKYNKalyan Jn · 3 min halt
            2. 12:17 AMKSRAKasara · 3 min halt
            3. 1:35 AMNKNasik Road · 5 min halt
            4. 2:37 AMMMRManmad Jn · 3 min halt
            5. 3:33 AMCSNChalisgaon Jn · 2 min halt
            6. 4:48 AMJLJalgaon Jn · 2 min halt
            7. 5:20 AMBSLBhusaval Jn · 5 min halt
            8. 6:08 AMBAUBurhanpur · 2 min halt
            9. 7:23 AMKNWKhandwa · 2 min halt
            10. 8:30 AMHDHarda · 2 min halt
            11. 9:50 AMETItarsi Jn · 10 min halt
            12. 10:46 AMPPIPipariya · 2 min halt
            13. 11:20 AMGARGadarwara · 2 min halt
            14. 11:40 AMKYKareli · 2 min halt
            15. 11:54 AMNUNarsinghpur · 2 min halt
            16. 12:20 PMSRIDSridham · 2 min halt
            17. 1:20 PMJBPJabalpur · 10 min halt
            18. 2:35 PMKTEKatni · 5 min halt
            19. 3:28 PMMYRMaihar · 2 min halt
            20. 4:20 PMSTASatna · 5 min halt
            21. 5:50 PMMKPManikpur Jn · 2 min halt
            22. 6:43 PMSRJShankargarh · 1 min halt
            23. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
            24. 8:20 PMBDLVindhyachal · 2 min halt
            25. 8:35 PMMZPMirzapur · 5 min halt
            26. 9:13 PMCARChunar · 2 min halt
            27. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
            28. 11:36 PMBBUBhabua Road · 2 min halt
            29. 12:08 AMSSMSasaram · 2 min halt
            30. 12:24 AMDOSDehri ON Sone · 2 min halt
            31. 12:40 AMAUBRAnugraha N Road · 2 min halt
            32. 2:05 AMGAYAGaya Jn · 5 min halt
            3:28 AM+2 daysKQRKoderma
        2. Option 3: 6:22 PM3:45 AM+2 days

          33 h 23 min1 changeSmallest buffer: 224 minfrom ₹440 (est.)

          via Mumbai

          1. 6:22 PMTNAThane

            Train11008Deccan Express

            Starts from Pune Jn (PUNE) on Wed, 18 Nov at 15:27 (3:27 PM) · you board on day 1

            Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 19:15

            Runs: Daily

            Indian Railways · 24 min · 24 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹5CC ₹100(est.)

            6:46 PMDRDadar
          2. Change at Mumbai

            • Same station, no local travel
            • Safety buffer: 224 min (3 h 44 min) Total wait: 224 min
          3. 10:30 PMDRDadar

            Train12322Howrah Mail

            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

            Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

            Runs: Daily

            Indian Railways · 29 h 15 min · 1799 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹435SL ₹8203A ₹2,1202A ₹2,9801A ₹4,950(est.)

            33 stops — Show or hide intermediate stops
            1. 11:12 PMKYNKalyan Jn · 3 min halt
            2. 12:17 AMKSRAKasara · 3 min halt
            3. 1:35 AMNKNasik Road · 5 min halt
            4. 2:37 AMMMRManmad Jn · 3 min halt
            5. 3:33 AMCSNChalisgaon Jn · 2 min halt
            6. 4:48 AMJLJalgaon Jn · 2 min halt
            7. 5:20 AMBSLBhusaval Jn · 5 min halt
            8. 6:08 AMBAUBurhanpur · 2 min halt
            9. 7:23 AMKNWKhandwa · 2 min halt
            10. 8:30 AMHDHarda · 2 min halt
            11. 9:50 AMETItarsi Jn · 10 min halt
            12. 10:46 AMPPIPipariya · 2 min halt
            13. 11:20 AMGARGadarwara · 2 min halt
            14. 11:40 AMKYKareli · 2 min halt
            15. 11:54 AMNUNarsinghpur · 2 min halt
            16. 12:20 PMSRIDSridham · 2 min halt
            17. 1:20 PMJBPJabalpur · 10 min halt
            18. 2:35 PMKTEKatni · 5 min halt
            19. 3:28 PMMYRMaihar · 2 min halt
            20. 4:20 PMSTASatna · 5 min halt
            21. 5:50 PMMKPManikpur Jn · 2 min halt
            22. 6:43 PMSRJShankargarh · 1 min halt
            23. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
            24. 8:20 PMBDLVindhyachal · 2 min halt
            25. 8:35 PMMZPMirzapur · 5 min halt
            26. 9:13 PMCARChunar · 2 min halt
            27. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
            28. 11:36 PMBBUBhabua Road · 2 min halt
            29. 12:08 AMSSMSasaram · 2 min halt
            30. 12:24 AMDOSDehri ON Sone · 2 min halt
            31. 12:40 AMAUBRAnugraha N Road · 2 min halt
            32. 2:05 AMGAYAGaya Jn · 5 min halt
            33. 3:28 AMKQRKoderma · 2 min halt
            3:45 AM+2 daysPSBParsabad

        via Itarsi · 2 routes · best 33 h 25 min

          All 2 combinations via Itarsi
          1. Option 2: 1:00 AM10:25 AM+1 day

            33 h 25 min1 changeSmallest buffer: 185 minfrom ₹475 (est.)

            via Itarsi

            • Earliest arrival
            1. 1:00 AMTNAThane

              Train22538Kushinagar SF Express

              Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 00:35 (12:35 AM) · you board on day 1

              Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 07:10

              Runs: Daily

              Indian Railways · 11 h 40 min · 716 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹205SL ₹4003A ₹1,0202A ₹1,4151A ₹2,340(est.)

              16 stops — Show or hide intermediate stops
              1. 1:17 AMKYNKalyan Jn · 3 min halt
              2. 3:45 AMDVLDevlali · 1 min halt
              3. 3:55 AMNKNasik Road · 5 min halt
              4. 4:55 AMMMRManmad Jn · 5 min halt
              5. 5:24 AMNGNNandgaon · 1 min halt
              6. 6:05 AMCSNChalisgaon Jn · 2 min halt
              7. 6:33 AMPCPachora Jn · 2 min halt
              8. 7:18 AMJLJalgaon Jn · 2 min halt
              9. 7:50 AMBSLBhusaval Jn · 5 min halt
              10. 8:25 AMRVRaver · 2 min halt
              11. 8:40 AMBAUBurhanpur · 2 min halt
              12. 9:10 AMNPNRNepanagar · 1 min halt
              13. 10:12 AMKNWKhandwa · 3 min halt
              14. 11:00 AMKKNKhirkiya · 2 min halt
              15. 11:23 AMHDHarda · 2 min halt
              16. 11:34 AMTBNTimarni · 2 min halt
              12:40 PMETItarsi Jn
            2. Change at Itarsi

              • Same station, no local travel
              • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
            3. 3:45 PMETItarsi Jn

              Train22364Coimbatore - Dhanbad Amrit Bharat Express

              Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

              This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

              Runs: Tue

              Indian Railways · 18 h 40 min · 1032 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹270SL ₹510(est.)

              13 stops — Show or hide intermediate stops
              1. 4:33 PMPPIPipariya · 2 min halt
              2. 5:33 PMNUNarsinghpur · 2 min halt
              3. 6:40 PMJBPJabalpur · 10 min halt
              4. 8:03 PMKTEKatni · 2 min halt
              5. 9:15 PMSTASatna · 5 min halt
              6. 1:10 AMPCOIPrayagraj Chheoki · 2 min halt
              7. 2:15 AMMZPMirzapur · 2 min halt
              8. 5:05 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
              9. 5:56 AMBBUBhabua Road · 2 min halt
              10. 6:30 AMSSMSasaram · 2 min halt
              11. 6:48 AMDOSDehri ON Sone · 2 min halt
              12. 7:03 AMAUBRAnugraha N Road · 2 min halt
              13. 8:55 AMGAYAGaya Jn · 5 min halt
              10:25 AM+1 dayKQRKoderma
          2. Option 3: 12:50 AM10:25 AM+1 day

            33 h 35 min1 changeSmallest buffer: 210 minfrom ₹460 (est.)

            via Itarsi

            1. 12:50 AMTNAThane

              Train11093Bnrs Mahanagari Express

              Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 00:15 (12:15 AM) · you board on day 1

              Ends at Banaras (BNRS) at Thu, 19 Nov 03:45

              Runs: Daily

              Indian Railways · 11 h 25 min · 717 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹190SL ₹3753A ₹9752A ₹1,3751A ₹2,270(est.)

              11 stops — Show or hide intermediate stops
              1. 1:12 AMKYNKalyan Jn · 3 min halt
              2. 2:53 AMIGPIgatpuri · 5 min halt
              3. 3:40 AMNKNasik Road · 5 min halt
              4. 4:38 AMMMRManmad Jn · 2 min halt
              5. 4:55 AMNGNNandgaon · 1 min halt
              6. 5:26 AMCSNChalisgaon Jn · 1 min halt
              7. 6:00 AMPCPachora Jn · 1 min halt
              8. 6:33 AMJLJalgaon Jn · 2 min halt
              9. 7:15 AMBSLBhusaval Jn · 5 min halt
              10. 8:15 AMBAUBurhanpur · 2 min halt
              11. 9:47 AMKNWKhandwa · 3 min halt
              12:15 PMETItarsi Jn
            2. Change at Itarsi

              • Same station, no local travel
              • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
            3. 3:45 PMETItarsi Jn

              Train22364Coimbatore - Dhanbad Amrit Bharat Express

              Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

              This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

              Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

              Runs: Tue

              Indian Railways · 18 h 40 min · 1032 km

              Scheduled timetable. From the published timetable. Delays are possible.

              GN ₹270SL ₹510(est.)

              13 stops — Show or hide intermediate stops
              1. 4:33 PMPPIPipariya · 2 min halt
              2. 5:33 PMNUNarsinghpur · 2 min halt
              3. 6:40 PMJBPJabalpur · 10 min halt
              4. 8:03 PMKTEKatni · 2 min halt
              5. 9:15 PMSTASatna · 5 min halt
              6. 1:10 AMPCOIPrayagraj Chheoki · 2 min halt
              7. 2:15 AMMZPMirzapur · 2 min halt
              8. 5:05 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
              9. 5:56 AMBBUBhabua Road · 2 min halt
              10. 6:30 AMSSMSasaram · 2 min halt
              11. 6:48 AMDOSDehri ON Sone · 2 min halt
              12. 7:03 AMAUBRAnugraha N Road · 2 min halt
              13. 8:55 AMGAYAGaya Jn · 5 min halt
              10:25 AM+1 dayKQRKoderma

          via Nashik · 2 routes · best 33 h 28 min

            All 2 combinations via Nashik
            1. Option 2: 6:00 PM3:28 AM+2 days

              33 h 28 min1 changeSmallest buffer: 230 minfrom ₹545 (est.)

              via Nashik

              • Nearby station
              1. 6:00 PMBhiwandi Bus Stand

                BusState RTC (estimated) Ordinary

                State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min

                Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                Ordinary ₹150(est.)

                Buy at bus stand · every 60 min

                9:15 PMNashik Bus Stand
              2. Change at Nashik

                • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
                • Safety buffer: 230 min (3 h 50 min) Total wait: 265 min

                Night-time change — plan safe waiting and local transport

                Partner link

                Long wait at Nashik?

                Find a room near Nasik Road
              3. 1:40 AM+1 dayNKNasik Road

                Train12322Howrah Mail

                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                Runs: Daily

                Indian Railways · 25 h 48 min · 1596 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹395SL ₹7453A ₹1,9252A ₹2,7051A ₹4,490(est.)

                29 stops — Show or hide intermediate stops
                1. 2:37 AMMMRManmad Jn · 3 min halt
                2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                3. 4:48 AMJLJalgaon Jn · 2 min halt
                4. 5:20 AMBSLBhusaval Jn · 5 min halt
                5. 6:08 AMBAUBurhanpur · 2 min halt
                6. 7:23 AMKNWKhandwa · 2 min halt
                7. 8:30 AMHDHarda · 2 min halt
                8. 9:50 AMETItarsi Jn · 10 min halt
                9. 10:46 AMPPIPipariya · 2 min halt
                10. 11:20 AMGARGadarwara · 2 min halt
                11. 11:40 AMKYKareli · 2 min halt
                12. 11:54 AMNUNarsinghpur · 2 min halt
                13. 12:20 PMSRIDSridham · 2 min halt
                14. 1:20 PMJBPJabalpur · 10 min halt
                15. 2:35 PMKTEKatni · 5 min halt
                16. 3:28 PMMYRMaihar · 2 min halt
                17. 4:20 PMSTASatna · 5 min halt
                18. 5:50 PMMKPManikpur Jn · 2 min halt
                19. 6:43 PMSRJShankargarh · 1 min halt
                20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                21. 8:20 PMBDLVindhyachal · 2 min halt
                22. 8:35 PMMZPMirzapur · 5 min halt
                23. 9:13 PMCARChunar · 2 min halt
                24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                25. 11:36 PMBBUBhabua Road · 2 min halt
                26. 12:08 AMSSMSasaram · 2 min halt
                27. 12:24 AMDOSDehri ON Sone · 2 min halt
                28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                29. 2:05 AMGAYAGaya Jn · 5 min halt
                3:28 AM+2 daysKQRKoderma
            2. Option 3: 6:00 PM3:45 AM+2 days

              33 h 45 min1 changeSmallest buffer: 230 minfrom ₹550 (est.)

              via Nashik

              • Nearby station
              1. 6:00 PMBhiwandi Bus Stand

                BusState RTC (estimated) Ordinary

                State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min

                Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                Ordinary ₹150(est.)

                Buy at bus stand · every 60 min

                9:15 PMNashik Bus Stand
              2. Change at Nashik

                • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
                • Safety buffer: 230 min (3 h 50 min) Total wait: 265 min

                Night-time change — plan safe waiting and local transport

                Partner link

                Long wait at Nashik?

                Find a room near Nasik Road
              3. 1:40 AM+1 dayNKNasik Road

                Train12322Howrah Mail

                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                Runs: Daily

                Indian Railways · 26 h 5 min · 1622 km

                Scheduled timetable. From the published timetable. Delays are possible.

                GN ₹400SL ₹7553A ₹1,9502A ₹2,7401A ₹4,550(est.)

                30 stops — Show or hide intermediate stops
                1. 2:37 AMMMRManmad Jn · 3 min halt
                2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                3. 4:48 AMJLJalgaon Jn · 2 min halt
                4. 5:20 AMBSLBhusaval Jn · 5 min halt
                5. 6:08 AMBAUBurhanpur · 2 min halt
                6. 7:23 AMKNWKhandwa · 2 min halt
                7. 8:30 AMHDHarda · 2 min halt
                8. 9:50 AMETItarsi Jn · 10 min halt
                9. 10:46 AMPPIPipariya · 2 min halt
                10. 11:20 AMGARGadarwara · 2 min halt
                11. 11:40 AMKYKareli · 2 min halt
                12. 11:54 AMNUNarsinghpur · 2 min halt
                13. 12:20 PMSRIDSridham · 2 min halt
                14. 1:20 PMJBPJabalpur · 10 min halt
                15. 2:35 PMKTEKatni · 5 min halt
                16. 3:28 PMMYRMaihar · 2 min halt
                17. 4:20 PMSTASatna · 5 min halt
                18. 5:50 PMMKPManikpur Jn · 2 min halt
                19. 6:43 PMSRJShankargarh · 1 min halt
                20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                21. 8:20 PMBDLVindhyachal · 2 min halt
                22. 8:35 PMMZPMirzapur · 5 min halt
                23. 9:13 PMCARChunar · 2 min halt
                24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                25. 11:36 PMBBUBhabua Road · 2 min halt
                26. 12:08 AMSSMSasaram · 2 min halt
                27. 12:24 AMDOSDehri ON Sone · 2 min halt
                28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                29. 2:05 AMGAYAGaya Jn · 5 min halt
                30. 3:28 AMKQRKoderma · 2 min halt
                3:45 AM+2 daysPSBParsabad

            via Jalgaon · 14 routes · best 33 h 33 min

              All 14 combinations via Jalgaon
              1. Option 2: 7:45 PM5:18 AM+2 days

                33 h 33 min2 changesSmallest buffer: 182 minfrom ₹1,050 (est.)

                via Jalgaon · Varanasi

                1. 7:45 PMTNAThane

                  Train12105Vidarbha SF Express

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                  Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                  Runs: Daily

                  Indian Railways · 5 h 38 min · 386 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹125SL ₹2553A ₹6252A ₹8551A ₹1,400(est.)

                  5 stops — Show or hide intermediate stops
                  1. 8:04 PMKYNKalyan Jn · 3 min halt
                  2. 9:30 PMIGPIgatpuri · 5 min halt
                  3. 10:22 PMNKNasik Road · 3 min halt
                  4. 11:23 PMMMRManmad Jn · 2 min halt
                  5. 12:13 AMCSNChalisgaon Jn · 2 min halt
                  1:23 AM+1 dayJLJalgaon Jn
                2. Change at Jalgaon

                  • Same station, no local travel
                  • Safety buffer: 207 min (3 h 27 min) Total wait: 207 min

                  Night-time change — plan safe waiting and local transport

                  Partner link

                  Long wait at Jalgaon?

                  Find a room near Jalgaon Jn
                3. 4:50 AM+1 dayJLJalgaon Jn

                  Train12322Howrah Mail

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                  Runs: Daily

                  Indian Railways · 17 h 58 min · 1079 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹295SL ₹5603A ₹1,4352A ₹2,0051A ₹3,330(est.)

                  20 stops — Show or hide intermediate stops
                  1. 5:20 AMBSLBhusaval Jn · 5 min halt
                  2. 6:08 AMBAUBurhanpur · 2 min halt
                  3. 7:23 AMKNWKhandwa · 2 min halt
                  4. 8:30 AMHDHarda · 2 min halt
                  5. 9:50 AMETItarsi Jn · 10 min halt
                  6. 10:46 AMPPIPipariya · 2 min halt
                  7. 11:20 AMGARGadarwara · 2 min halt
                  8. 11:40 AMKYKareli · 2 min halt
                  9. 11:54 AMNUNarsinghpur · 2 min halt
                  10. 12:20 PMSRIDSridham · 2 min halt
                  11. 1:20 PMJBPJabalpur · 10 min halt
                  12. 2:35 PMKTEKatni · 5 min halt
                  13. 3:28 PMMYRMaihar · 2 min halt
                  14. 4:20 PMSTASatna · 5 min halt
                  15. 5:50 PMMKPManikpur Jn · 2 min halt
                  16. 6:43 PMSRJShankargarh · 1 min halt
                  17. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                  18. 8:20 PMBDLVindhyachal · 2 min halt
                  19. 8:35 PMMZPMirzapur · 5 min halt
                  20. 9:13 PMCARChunar · 2 min halt
                  10:48 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                4. Change at Varanasi

                  • Same station, no local travel
                  • Safety buffer: 182 min (3 h 2 min) Total wait: 182 min

                  Night-time change — plan safe waiting and local transport

                  Partner link

                  Long wait at Varanasi?

                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                5. 1:50 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                  Train22824New Delhi - Bhubaneswar Tejas Rajdhani Express

                  Starts from New Delhi (NDLS) on Thu, 19 Nov at 17:00 (5:00 PM) · you board on day 2

                  This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                  Ends at Bhubaneswar (BBS) at Fri, 20 Nov 17:30

                  Runs: Tue, Wed, Thu, Sat

                  Indian Railways · 3 h 28 min · 283 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  3A ₹6302A ₹8651A ₹1,410(est.)

                  1 stop — Show or hide intermediate stops
                  1. 4:10 AMGAYAGaya Jn · 3 min halt
                  5:18 AM+2 daysKQRKoderma
              2. Option 3: 7:45 PM5:18 AM+2 days

                33 h 33 min2 changesSmallest buffer: 207 minfrom ₹1,220 (est.)

                via Jalgaon · Prayagraj

                1. 7:45 PMTNAThane

                  Train12105Vidarbha SF Express

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                  Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                  Runs: Daily

                  Indian Railways · 5 h 38 min · 386 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹125SL ₹2553A ₹6252A ₹8551A ₹1,400(est.)

                  5 stops — Show or hide intermediate stops
                  1. 8:04 PMKYNKalyan Jn · 3 min halt
                  2. 9:30 PMIGPIgatpuri · 5 min halt
                  3. 10:22 PMNKNasik Road · 3 min halt
                  4. 11:23 PMMMRManmad Jn · 2 min halt
                  5. 12:13 AMCSNChalisgaon Jn · 2 min halt
                  1:23 AM+1 dayJLJalgaon Jn
                2. Change at Jalgaon

                  • Same station, no local travel
                  • Safety buffer: 207 min (3 h 27 min) Total wait: 207 min

                  Night-time change — plan safe waiting and local transport

                  Partner link

                  Long wait at Jalgaon?

                  Find a room near Jalgaon Jn
                3. 4:50 AM+1 dayJLJalgaon Jn

                  Train12322Howrah Mail

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                  Runs: Daily

                  Indian Railways · 14 h 40 min · 936 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹260SL ₹5003A ₹1,2852A ₹1,7901A ₹2,970(est.)

                  16 stops — Show or hide intermediate stops
                  1. 5:20 AMBSLBhusaval Jn · 5 min halt
                  2. 6:08 AMBAUBurhanpur · 2 min halt
                  3. 7:23 AMKNWKhandwa · 2 min halt
                  4. 8:30 AMHDHarda · 2 min halt
                  5. 9:50 AMETItarsi Jn · 10 min halt
                  6. 10:46 AMPPIPipariya · 2 min halt
                  7. 11:20 AMGARGadarwara · 2 min halt
                  8. 11:40 AMKYKareli · 2 min halt
                  9. 11:54 AMNUNarsinghpur · 2 min halt
                  10. 12:20 PMSRIDSridham · 2 min halt
                  11. 1:20 PMJBPJabalpur · 10 min halt
                  12. 2:35 PMKTEKatni · 5 min halt
                  13. 3:28 PMMYRMaihar · 2 min halt
                  14. 4:20 PMSTASatna · 5 min halt
                  15. 5:50 PMMKPManikpur Jn · 2 min halt
                  16. 6:43 PMSRJShankargarh · 1 min halt
                  7:30 PM+1 dayPCOIPrayagraj Chheoki
                4. Change at Prayagraj

                  • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
                  • Safety buffer: 223 min (3 h 43 min) Total wait: 263 min

                  Station change — you must travel to a different station or bus stand

                  Partner link

                  Long wait at Prayagraj?

                  Find a room near Prayagraj Jn
                5. 11:53 PM+1 dayPRYJPrayagraj Jn

                  Train22824New Delhi - Bhubaneswar Tejas Rajdhani Express

                  Starts from New Delhi (NDLS) on Thu, 19 Nov at 17:00 (5:00 PM) · you board on day 1

                  Ends at Bhubaneswar (BBS) at Fri, 20 Nov 17:30

                  Runs: Tue, Wed, Thu, Sat

                  Indian Railways · 5 h 25 min · 436 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  3A ₹8352A ₹1,1551A ₹1,895(est.)

                  2 stops — Show or hide intermediate stops
                  1. 1:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                  2. 4:10 AMGAYAGaya Jn · 3 min halt
                  5:18 AM+2 daysKQRKoderma
              3. Option 4: 7:45 PM6:24 AM+2 days

                34 h 39 min2 changesSmallest buffer: 185 minfrom ₹495 (est.)

                via Jalgaon · Gaya

                1. 7:45 PMTNAThane

                  Train12105Vidarbha SF Express

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                  Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                  Runs: Daily

                  Indian Railways · 5 h 38 min · 386 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹125SL ₹2553A ₹6252A ₹8551A ₹1,400(est.)

                  5 stops — Show or hide intermediate stops
                  1. 8:04 PMKYNKalyan Jn · 3 min halt
                  2. 9:30 PMIGPIgatpuri · 5 min halt
                  3. 10:22 PMNKNasik Road · 3 min halt
                  4. 11:23 PMMMRManmad Jn · 2 min halt
                  5. 12:13 AMCSNChalisgaon Jn · 2 min halt
                  1:23 AM+1 dayJLJalgaon Jn
                2. Change at Jalgaon

                  • Same station, no local travel
                  • Safety buffer: 207 min (3 h 27 min) Total wait: 207 min

                  Night-time change — plan safe waiting and local transport

                  Partner link

                  Long wait at Jalgaon?

                  Find a room near Jalgaon Jn
                3. 4:50 AM+1 dayJLJalgaon Jn

                  Train12322Howrah Mail

                  Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                  Runs: Daily

                  Indian Railways · 21 h 15 min · 1287 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹335SL ₹6353A ₹1,6352A ₹2,2851A ₹3,795(est.)

                  25 stops — Show or hide intermediate stops
                  1. 5:20 AMBSLBhusaval Jn · 5 min halt
                  2. 6:08 AMBAUBurhanpur · 2 min halt
                  3. 7:23 AMKNWKhandwa · 2 min halt
                  4. 8:30 AMHDHarda · 2 min halt
                  5. 9:50 AMETItarsi Jn · 10 min halt
                  6. 10:46 AMPPIPipariya · 2 min halt
                  7. 11:20 AMGARGadarwara · 2 min halt
                  8. 11:40 AMKYKareli · 2 min halt
                  9. 11:54 AMNUNarsinghpur · 2 min halt
                  10. 12:20 PMSRIDSridham · 2 min halt
                  11. 1:20 PMJBPJabalpur · 10 min halt
                  12. 2:35 PMKTEKatni · 5 min halt
                  13. 3:28 PMMYRMaihar · 2 min halt
                  14. 4:20 PMSTASatna · 5 min halt
                  15. 5:50 PMMKPManikpur Jn · 2 min halt
                  16. 6:43 PMSRJShankargarh · 1 min halt
                  17. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                  18. 8:20 PMBDLVindhyachal · 2 min halt
                  19. 8:35 PMMZPMirzapur · 5 min halt
                  20. 9:13 PMCARChunar · 2 min halt
                  21. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                  22. 11:36 PMBBUBhabua Road · 2 min halt
                  23. 12:08 AMSSMSasaram · 2 min halt
                  24. 12:24 AMDOSDehri ON Sone · 2 min halt
                  25. 12:40 AMAUBRAnugraha N Road · 2 min halt
                  2:05 AM+2 daysGAYAGaya Jn
                4. Change at Gaya

                  • Same station, no local travel
                  • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min

                  Night-time change — plan safe waiting and local transport

                  Partner link

                  Long wait at Gaya?

                  Find a room near Gaya Jn
                5. 5:10 AM+2 daysGAYAGaya Jn

                  Train12495Pratap SF Express

                  Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 2

                  This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                  Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                  Runs: Thu

                  Indian Railways · 1 h 14 min · 76 km

                  Scheduled timetable. From the published timetable. Delays are possible.

                  GN ₹35SL ₹1603A ₹5202A ₹710(est.)

                  6:24 AM+2 daysKQRKoderma
              Search another date

              via Manmad · 9 routes · best 33 h 33 min

                All 9 combinations via Manmad
                1. Option 2: 7:45 PM5:18 AM+2 days

                  33 h 33 min2 changesSmallest buffer: 182 minfrom ₹1,195 (est.)

                  via Manmad · Prayagraj

                  1. 7:45 PMTNAThane

                    Train12105Vidarbha SF Express

                    Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                    Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                    Runs: Daily

                    Indian Railways · 3 h 38 min · 225 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹80SL ₹1753A ₹5202A ₹7101A ₹1,155(est.)

                    3 stops — Show or hide intermediate stops
                    1. 8:04 PMKYNKalyan Jn · 3 min halt
                    2. 9:30 PMIGPIgatpuri · 5 min halt
                    3. 10:22 PMNKNasik Road · 3 min halt
                    11:23 PMMMRManmad Jn
                  2. Change at Manmad

                    • Same station, no local travel
                    • Safety buffer: 182 min (3 h 2 min) Total wait: 182 min

                    Night-time change — plan safe waiting and local transport

                    Partner link

                    Long wait at Manmad?

                    Find a room near Manmad Jn
                  3. 2:25 AM+1 dayMMRManmad Jn

                    Train11401Pune - Supaul Express

                    Starts from Pune Jn (PUNE) on Wed, 18 Nov at 21:05 (9:05 PM) · you board on day 2

                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                    Ends at Supaul (SOU) at Fri, 20 Nov 13:15

                    Runs: Daily

                    Indian Railways · 17 h 20 min · 1097 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹280SL ₹5353A ₹1,4052A ₹1,985(est.)

                    10 stops — Show or hide intermediate stops
                    1. 4:45 AMBSLBhusaval Jn · 5 min halt
                    2. 5:22 AMRVRaver · 1 min halt
                    3. 5:38 AMBAUBurhanpur · 2 min halt
                    4. 7:07 AMKNWKhandwa · 3 min halt
                    5. 8:00 AMKKNKhirkiya · 2 min halt
                    6. 10:15 AMETItarsi Jn · 10 min halt
                    7. 1:35 PMJBPJabalpur · 10 min halt
                    8. 2:50 PMKTEKatni · 5 min halt
                    9. 3:38 PMMYRMaihar · 2 min halt
                    10. 4:30 PMSTASatna · 5 min halt
                    7:45 PM+1 dayPCOIPrayagraj Chheoki
                  4. Change at Prayagraj

                    • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
                    • Safety buffer: 208 min (3 h 28 min) Total wait: 248 min

                    Station change — you must travel to a different station or bus stand

                    Partner link

                    Long wait at Prayagraj?

                    Find a room near Prayagraj Jn
                  5. 11:53 PM+1 dayPRYJPrayagraj Jn

                    Train22824New Delhi - Bhubaneswar Tejas Rajdhani Express

                    Starts from New Delhi (NDLS) on Thu, 19 Nov at 17:00 (5:00 PM) · you board on day 1

                    Ends at Bhubaneswar (BBS) at Fri, 20 Nov 17:30

                    Runs: Tue, Wed, Thu, Sat

                    Indian Railways · 5 h 25 min · 436 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    3A ₹8352A ₹1,1551A ₹1,895(est.)

                    2 stops — Show or hide intermediate stops
                    1. 1:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                    2. 4:10 AMGAYAGaya Jn · 3 min halt
                    5:18 AM+2 daysKQRKoderma
                2. Option 3: 7:45 PM6:24 AM+2 days

                  34 h 39 min2 changesSmallest buffer: 182 minfrom ₹485 (est.)

                  via Manmad · Varanasi

                  1. 7:45 PMTNAThane

                    Train12105Vidarbha SF Express

                    Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                    Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                    Runs: Daily

                    Indian Railways · 3 h 38 min · 225 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹80SL ₹1753A ₹5202A ₹7101A ₹1,155(est.)

                    3 stops — Show or hide intermediate stops
                    1. 8:04 PMKYNKalyan Jn · 3 min halt
                    2. 9:30 PMIGPIgatpuri · 5 min halt
                    3. 10:22 PMNKNasik Road · 3 min halt
                    11:23 PMMMRManmad Jn
                  2. Change at Manmad

                    • Same station, no local travel
                    • Safety buffer: 182 min (3 h 2 min) Total wait: 182 min

                    Night-time change — plan safe waiting and local transport

                    Partner link

                    Long wait at Manmad?

                    Find a room near Manmad Jn
                  3. 2:25 AM+1 dayMMRManmad Jn

                    Train11401Pune - Supaul Express

                    Starts from Pune Jn (PUNE) on Wed, 18 Nov at 21:05 (9:05 PM) · you board on day 2

                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                    Ends at Supaul (SOU) at Fri, 20 Nov 13:15

                    Runs: Daily

                    Indian Railways · 20 h 33 min · 1240 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹310SL ₹5853A ₹1,5452A ₹2,180(est.)

                    12 stops — Show or hide intermediate stops
                    1. 4:45 AMBSLBhusaval Jn · 5 min halt
                    2. 5:22 AMRVRaver · 1 min halt
                    3. 5:38 AMBAUBurhanpur · 2 min halt
                    4. 7:07 AMKNWKhandwa · 3 min halt
                    5. 8:00 AMKKNKhirkiya · 2 min halt
                    6. 10:15 AMETItarsi Jn · 10 min halt
                    7. 1:35 PMJBPJabalpur · 10 min halt
                    8. 2:50 PMKTEKatni · 5 min halt
                    9. 3:38 PMMYRMaihar · 2 min halt
                    10. 4:30 PMSTASatna · 5 min halt
                    11. 7:45 PMPCOIPrayagraj Chheoki · 2 min halt
                    12. 8:55 PMMZPMirzapur · 2 min halt
                    10:58 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                  4. Change at Varanasi

                    • Same station, no local travel
                    • Safety buffer: 207 min (3 h 27 min) Total wait: 207 min

                    Night-time change — plan safe waiting and local transport

                    Partner link

                    Long wait at Varanasi?

                    Find a room near Pt. Deen Dayal Upadhyaya Jn
                  5. 2:25 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                    Train12495Pratap SF Express

                    Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 2

                    This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                    Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                    Runs: Thu

                    Indian Railways · 3 h 59 min · 283 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹95SL ₹2053A ₹5202A ₹710(est.)

                    1 stop — Show or hide intermediate stops
                    1. 5:05 AMGAYAGaya Jn · 5 min halt
                    6:24 AM+2 daysKQRKoderma
                3. Option 4: 9:45 PM9:02 AM+2 days

                  35 h 17 min2 changesSmallest buffer: 188 minfrom ₹495 (est.)

                  via Manmad · Prayagraj

                  1. 9:45 PMTNAThane

                    Train12809Howrah Mail

                    Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 21:10 (9:10 PM) · you board on day 1

                    Ends at Howrah Jn (HWH) at Fri, 20 Nov 06:45

                    Runs: Daily

                    Indian Railways · 3 h 42 min · 225 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹80SL ₹1753A ₹5202A ₹7101A ₹1,155(est.)

                    5 stops — Show or hide intermediate stops
                    1. 10:07 PMKYNKalyan Jn · 3 min halt
                    2. 11:12 PMKSRAKasara · 3 min halt
                    3. 11:42 PMIGPIgatpuri · 5 min halt
                    4. 12:19 AMDVLDevlali · 1 min halt
                    5. 12:27 AMNKNasik Road · 3 min halt
                    1:27 AM+1 dayMMRManmad Jn
                  2. Change at Manmad

                    • Same station, no local travel
                    • Safety buffer: 188 min (3 h 8 min) Total wait: 188 min

                    Night-time change — plan safe waiting and local transport

                    Partner link

                    Long wait at Manmad?

                    Find a room near Manmad Jn
                  3. 4:35 AM+1 dayMMRManmad Jn

                    Train07651Chhapra Special Fare Festival Special

                    Starts from Jalna (J) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 2

                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                    Ends at Chhapra (CPR) at Fri, 20 Nov 09:35

                    Runs: Wed

                    Indian Railways · 17 h 30 min · 1097 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹280SL ₹5353A ₹1,4052A ₹1,9851A ₹3,295(est.)

                    12 stops — Show or hide intermediate stops
                    1. 7:00 AMBSLBhusaval Jn · 5 min halt
                    2. 9:00 AMKNWKhandwa · 5 min halt
                    3. 10:00 AMHDHarda · 2 min halt
                    4. 12:00 PMETItarsi Jn · 10 min halt
                    5. 1:00 PMPPIPipariya · 2 min halt
                    6. 1:25 PMGARGadarwara · 2 min halt
                    7. 1:58 PMNUNarsinghpur · 2 min halt
                    8. 3:30 PMJBPJabalpur · 10 min halt
                    9. 4:55 PMKTEKatni · 5 min halt
                    10. 5:40 PMMYRMaihar · 2 min halt
                    11. 6:20 PMSTASatna · 5 min halt
                    12. 8:08 PMMKPManikpur Jn · 2 min halt
                    10:05 PM+1 dayPCOIPrayagraj Chheoki
                  4. Change at Prayagraj

                    • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
                    • Safety buffer: 190 min (3 h 10 min) Total wait: 230 min

                    Night-time change — plan safe waiting and local transport

                    Partner link

                    Long wait at Prayagraj?

                    Find a room near Prayagraj Jn
                  5. 1:55 AM+2 daysPRYJPrayagraj Jn

                    Train12988Sealdah SF Express

                    Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 2

                    This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                    Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

                    Runs: Daily

                    Indian Railways · 7 h 7 min · 436 km

                    Scheduled timetable. From the published timetable. Delays are possible.

                    GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                    5 stops — Show or hide intermediate stops
                    1. 4:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                    2. 5:35 AMBBUBhabua Road · 2 min halt
                    3. 6:05 AMSSMSasaram · 2 min halt
                    4. 6:20 AMDOSDehri ON Sone · 2 min halt
                    5. 7:50 AMGAYAGaya Jn · 5 min halt
                    9:02 AM+2 daysKQRKoderma
                Search another date

                via Katni · 1 route · best 33 h 35 min

                  All 1 combinations via Katni
                  1. Option 2: 12:50 AM10:25 AM+1 day

                    33 h 35 min1 changeSmallest buffer: 190 minfrom ₹460 (est.)

                    via Katni

                    1. 12:50 AMTNAThane

                      Train11093Bnrs Mahanagari Express

                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 00:15 (12:15 AM) · you board on day 1

                      Ends at Banaras (BNRS) at Thu, 19 Nov 03:45

                      Runs: Daily

                      Indian Railways · 16 h 5 min · 1053 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹275SL ₹5203A ₹1,3652A ₹1,9251A ₹3,195(est.)

                      17 stops — Show or hide intermediate stops
                      1. 1:12 AMKYNKalyan Jn · 3 min halt
                      2. 2:53 AMIGPIgatpuri · 5 min halt
                      3. 3:40 AMNKNasik Road · 5 min halt
                      4. 4:38 AMMMRManmad Jn · 2 min halt
                      5. 4:55 AMNGNNandgaon · 1 min halt
                      6. 5:26 AMCSNChalisgaon Jn · 1 min halt
                      7. 6:00 AMPCPachora Jn · 1 min halt
                      8. 6:33 AMJLJalgaon Jn · 2 min halt
                      9. 7:15 AMBSLBhusaval Jn · 5 min halt
                      10. 8:15 AMBAUBurhanpur · 2 min halt
                      11. 9:47 AMKNWKhandwa · 3 min halt
                      12. 12:15 PMETItarsi Jn · 10 min halt
                      13. 1:13 PMPPIPipariya · 2 min halt
                      14. 2:13 PMNUNarsinghpur · 2 min halt
                      15. 2:43 PMSRIDSridham · 2 min halt
                      16. 3:23 PMMMLMadan Mahal · 2 min halt
                      17. 3:40 PMJBPJabalpur · 10 min halt
                      4:55 PMKTEKatni
                    2. Change at Katni

                      • Same station, no local travel
                      • Safety buffer: 190 min (3 h 10 min) Total wait: 190 min
                    3. 8:05 PMKTEKatni

                      Train22364Coimbatore - Dhanbad Amrit Bharat Express

                      Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

                      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                      Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

                      Runs: Tue

                      Indian Railways · 14 h 20 min · 696 km

                      Scheduled timetable. From the published timetable. Delays are possible.

                      GN ₹185SL ₹365(est.)

                      9 stops — Show or hide intermediate stops
                      1. 9:15 PMSTASatna · 5 min halt
                      2. 1:10 AMPCOIPrayagraj Chheoki · 2 min halt
                      3. 2:15 AMMZPMirzapur · 2 min halt
                      4. 5:05 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                      5. 5:56 AMBBUBhabua Road · 2 min halt
                      6. 6:30 AMSSMSasaram · 2 min halt
                      7. 6:48 AMDOSDehri ON Sone · 2 min halt
                      8. 7:03 AMAUBRAnugraha N Road · 2 min halt
                      9. 8:55 AMGAYAGaya Jn · 5 min halt
                      10:25 AM+1 dayKQRKoderma

                  via Patna · 7 routes · best 33 h 40 min

                    All 7 combinations via Patna
                    1. Option 2: 11:55 PM9:35 AM+2 days

                      33 h 40 min1 changeSmallest buffer: 206 minfrom ₹740 (est.)

                      via Patna

                      1. 11:55 PMTNAThane

                        Train12141Patliputra SF Express

                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

                        Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

                        Runs: Daily

                        Indian Railways · 27 h 4 min · 1669 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹410SL ₹7703A ₹1,9952A ₹2,8051A ₹4,655(est.)

                        14 stops — Show or hide intermediate stops
                        1. 12:17 AMKYNKalyan Jn · 3 min halt
                        2. 2:40 AMNKNasik Road · 5 min halt
                        3. 3:43 AMMMRManmad Jn · 2 min halt
                        4. 5:33 AMJLJalgaon Jn · 2 min halt
                        5. 6:15 AMBSLBhusaval Jn · 5 min halt
                        6. 10:55 AMETItarsi Jn · 10 min halt
                        7. 2:20 PMJBPJabalpur · 10 min halt
                        8. 5:35 PMSTASatna · 5 min halt
                        9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
                        10. 12:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                        11. 1:00 AMZNAZamania · 2 min halt
                        12. 1:20 AMGMRGahmar · 2 min halt
                        13. 1:36 AMBXRBuxar · 2 min halt
                        14. 2:20 AMARAAra · 5 min halt
                        2:59 AM+2 daysDNRDanapur
                      2. Change at Patna

                        • Local transit: 35 min · Danapur (DNR) → Patna Jn (PNBE)
                        • Safety buffer: 206 min (3 h 26 min) Total wait: 241 min

                        Night-time change — plan safe waiting and local transport

                        Partner link

                        Long wait at Patna?

                        Find a room near Patna Jn
                      3. 7:00 AM+2 daysPNBEPatna Jn

                        Train22349Patna - Ranchi Vande Bharat Express

                        Starts from Patna Jn (PNBE) on Fri, 20 Nov at 07:00 (7:00 AM) · you board on day 1

                        Ends at Ranchi (RNC) at Fri, 20 Nov 13:05

                        Runs: Sun, Mon, Wed, Thu, Fri, Sat

                        Indian Railways · 2 h 35 min · 169 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        CC ₹330(est.)

                        2 stops — Show or hide intermediate stops
                        1. 7:33 AMJHDJehanabad · 2 min halt
                        2. 8:20 AMGAYAGaya Jn · 10 min halt
                        9:35 AM+2 daysKQRKoderma
                    2. Option 3: 11:55 PM1:41 PM+2 days

                      37 h 46 min1 changeSmallest buffer: 221 minfrom ₹485 (est.)

                      via Patna

                      1. 11:55 PMTNAThane

                        Train12141Patliputra SF Express

                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

                        Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

                        Runs: Daily

                        Indian Railways · 27 h 4 min · 1669 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹410SL ₹7703A ₹1,9952A ₹2,8051A ₹4,655(est.)

                        14 stops — Show or hide intermediate stops
                        1. 12:17 AMKYNKalyan Jn · 3 min halt
                        2. 2:40 AMNKNasik Road · 5 min halt
                        3. 3:43 AMMMRManmad Jn · 2 min halt
                        4. 5:33 AMJLJalgaon Jn · 2 min halt
                        5. 6:15 AMBSLBhusaval Jn · 5 min halt
                        6. 10:55 AMETItarsi Jn · 10 min halt
                        7. 2:20 PMJBPJabalpur · 10 min halt
                        8. 5:35 PMSTASatna · 5 min halt
                        9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
                        10. 12:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                        11. 1:00 AMZNAZamania · 2 min halt
                        12. 1:20 AMGMRGahmar · 2 min halt
                        13. 1:36 AMBXRBuxar · 2 min halt
                        14. 2:20 AMARAAra · 5 min halt
                        2:59 AM+2 daysDNRDanapur
                      2. Change at Patna

                        • Same station, no local travel
                        • Safety buffer: 221 min (3 h 41 min) Total wait: 221 min

                        Night-time change — plan safe waiting and local transport

                        Partner link

                        Long wait at Patna?

                        Find a room near Danapur
                      3. 6:40 AM+2 daysDNRDanapur

                        Train13234Koderma Intercity Express

                        Starts from Danapur (DNR) on Fri, 20 Nov at 06:40 (6:40 AM) · you board on day 1

                        Ends at Koderma (KQR) at Fri, 20 Nov 14:10

                        Runs: Daily

                        Indian Railways · 7 h 1 min · 250 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹75CC ₹3403A ₹475(est.)

                        19 stops — Show or hide intermediate stops
                        1. 6:55 AMPNBEPatna Jn · 5 min halt
                        2. 7:05 AMRJPBRajendra Nagar Terminal · 2 min halt
                        3. 7:13 AMGZHGulzarbagh · 1 min halt
                        4. 7:19 AMPNCPatna Saheb · 2 min halt
                        5. 7:31 AMFUTFatuha · 2 min halt
                        6. 7:41 AMKOOKhusropur · 2 min halt
                        7. 7:50 AMKWOKarauta · 2 min halt
                        8. 8:30 AMBKPBakhtiyarpur Jn · 2 min halt
                        9. 8:49 AMHRTHarnaut · 2 min halt
                        10. 8:58 AMWENAWena · 2 min halt
                        11. 9:08 AMRRERahui Road · 1 min halt
                        12. 9:16 AMBEHSBihar Sharif · 2 min halt
                        13. 9:25 AMPOEPawapuri Road · 2 min halt
                        14. 9:34 AMNLDNalanda · 2 min halt
                        15. 10:05 AMRGDRajgir · 5 min halt
                        16. 10:28 AMNESNatesar · 2 min halt
                        17. 11:15 AMTIATilaya · 5 min halt
                        18. 1:00 PMPRPPaharpur · 2 min halt
                        19. 1:12 PMGAPGurpa · 2 min halt
                        1:41 PM+2 daysGJDGujhandi
                    3. Option 4: 11:55 PM2:10 PM+2 days

                      38 h 15 min1 changeSmallest buffer: 221 minfrom ₹485 (est.)

                      via Patna

                      1. 11:55 PMTNAThane

                        Train12141Patliputra SF Express

                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

                        Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

                        Runs: Daily

                        Indian Railways · 27 h 4 min · 1669 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹410SL ₹7703A ₹1,9952A ₹2,8051A ₹4,655(est.)

                        14 stops — Show or hide intermediate stops
                        1. 12:17 AMKYNKalyan Jn · 3 min halt
                        2. 2:40 AMNKNasik Road · 5 min halt
                        3. 3:43 AMMMRManmad Jn · 2 min halt
                        4. 5:33 AMJLJalgaon Jn · 2 min halt
                        5. 6:15 AMBSLBhusaval Jn · 5 min halt
                        6. 10:55 AMETItarsi Jn · 10 min halt
                        7. 2:20 PMJBPJabalpur · 10 min halt
                        8. 5:35 PMSTASatna · 5 min halt
                        9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
                        10. 12:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                        11. 1:00 AMZNAZamania · 2 min halt
                        12. 1:20 AMGMRGahmar · 2 min halt
                        13. 1:36 AMBXRBuxar · 2 min halt
                        14. 2:20 AMARAAra · 5 min halt
                        2:59 AM+2 daysDNRDanapur
                      2. Change at Patna

                        • Same station, no local travel
                        • Safety buffer: 221 min (3 h 41 min) Total wait: 221 min

                        Night-time change — plan safe waiting and local transport

                        Partner link

                        Long wait at Patna?

                        Find a room near Danapur
                      3. 6:40 AM+2 daysDNRDanapur

                        Train13234Koderma Intercity Express

                        Starts from Danapur (DNR) on Fri, 20 Nov at 06:40 (6:40 AM) · you board on day 1

                        Ends at Koderma (KQR) at Fri, 20 Nov 14:10

                        Runs: Daily

                        Indian Railways · 7 h 30 min · 260 km

                        Scheduled timetable. From the published timetable. Delays are possible.

                        GN ₹75CC ₹3503A ₹475(est.)

                        20 stops — Show or hide intermediate stops
                        1. 6:55 AMPNBEPatna Jn · 5 min halt
                        2. 7:05 AMRJPBRajendra Nagar Terminal · 2 min halt
                        3. 7:13 AMGZHGulzarbagh · 1 min halt
                        4. 7:19 AMPNCPatna Saheb · 2 min halt
                        5. 7:31 AMFUTFatuha · 2 min halt
                        6. 7:41 AMKOOKhusropur · 2 min halt
                        7. 7:50 AMKWOKarauta · 2 min halt
                        8. 8:30 AMBKPBakhtiyarpur Jn · 2 min halt
                        9. 8:49 AMHRTHarnaut · 2 min halt
                        10. 8:58 AMWENAWena · 2 min halt
                        11. 9:08 AMRRERahui Road · 1 min halt
                        12. 9:16 AMBEHSBihar Sharif · 2 min halt
                        13. 9:25 AMPOEPawapuri Road · 2 min halt
                        14. 9:34 AMNLDNalanda · 2 min halt
                        15. 10:05 AMRGDRajgir · 5 min halt
                        16. 10:28 AMNESNatesar · 2 min halt
                        17. 11:15 AMTIATilaya · 5 min halt
                        18. 1:00 PMPRPPaharpur · 2 min halt
                        19. 1:12 PMGAPGurpa · 2 min halt
                        20. 1:41 PMGJDGujhandi · 2 min halt
                        2:10 PM+2 daysKQRKoderma
                    Search another date

                    via Kalyan · 14 routes · best 34 h 54 min

                      All 14 combinations via Kalyan
                      1. Option 2: 11:30 AM10:24 PM+1 day

                        34 h 54 min2 changesSmallest buffer: 180 minfrom ₹480 (est.)

                        via Kalyan · Prayagraj

                        1. 11:30 AMDIVADiva

                          Train61004Diva - Vasai Road Local

                          Starts from Diva (DIVA) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                          Ends at Vasai Road (BSR) at Wed, 18 Nov 12:30

                          Runs: Daily

                          Indian Railways · 10 min · 4 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹10(est.)

                          11:40 AMKOPRKopar
                        2. Change at Kalyan

                          • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                          • Safety buffer: 180 min (3 h) Total wait: 210 min

                          Station change — you must travel to a different station or bus stand

                        3. 3:10 PMKYNKalyan Jn

                          Train12563Mumbai Ltt - Faizabad SF Express

                          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 1

                          Ends at Ayodhya Cantt (AYC) at Thu, 19 Nov 17:40

                          Runs: Daily · Running days not verified — check before booking

                          Indian Railways · 20 h 30 min · 1285 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹335SL ₹6353A ₹1,6302A ₹2,2851A ₹3,790(est.)

                          6 stops — Show or hide intermediate stops
                          1. 6:02 PMNKNasik Road · 2 min halt
                          2. 8:38 PMJLJalgaon Jn · 2 min halt
                          3. 1:20 AMETItarsi Jn · 10 min halt
                          4. 6:00 AMKTEKatni · 5 min halt
                          5. 7:30 AMSTASatna · 10 min halt
                          6. 9:45 AMMKPManikpur Jn · 2 min halt
                          11:40 AM+1 dayPRYJPrayagraj Jn
                        4. Change at Prayagraj

                          • Same station, no local travel
                          • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                          Partner link

                          Long wait at Prayagraj?

                          Find a room near Prayagraj Jn
                        5. 3:45 PM+1 dayPRYJPrayagraj Jn

                          Train22308Howrah SF Express

                          Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                          Runs: Sun, Wed, Sat

                          Indian Railways · 6 h 39 min · 436 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                          7 stops — Show or hide intermediate stops
                          1. 4:48 PMMZPMirzapur · 2 min halt
                          2. 6:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                          3. 7:00 PMBBUBhabua Road · 2 min halt
                          4. 7:30 PMSSMSasaram · 2 min halt
                          5. 7:50 PMDOSDehri ON Sone · 2 min halt
                          6. 8:08 PMAUBRAnugraha N Road · 2 min halt
                          7. 9:10 PMGAYAGaya Jn · 5 min halt
                          10:24 PM+1 dayKQRKoderma
                      2. Option 3: 4:25 PM3:28 AM+2 days

                        35 h 3 min2 changesSmallest buffer: 182 minfrom ₹475 (est.)

                        via Kalyan · Chalisgaon

                        1. 4:25 PMDIVADiva

                          Train61022Diva - Vasai Road Local

                          Starts from Diva (DIVA) on Wed, 18 Nov at 16:25 (4:25 PM) · you board on day 1

                          Ends at Vasai Road (BSR) at Wed, 18 Nov 17:25

                          Runs: Daily

                          Indian Railways · 10 min · 4 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹10(est.)

                          4:35 PMKOPRKopar
                        2. Change at Kalyan

                          • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                          • Safety buffer: 182 min (3 h 2 min) Total wait: 212 min

                          Station change — you must travel to a different station or bus stand

                        3. 8:07 PMKYNKalyan Jn

                          Train12105Vidarbha SF Express

                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1

                          Ends at Gondia Jn (G) at Thu, 19 Nov 11:15

                          Runs: Daily

                          Indian Railways · 4 h 6 min · 272 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹95SL ₹2003A ₹5202A ₹7101A ₹1,155(est.)

                          3 stops — Show or hide intermediate stops
                          1. 9:30 PMIGPIgatpuri · 5 min halt
                          2. 10:22 PMNKNasik Road · 3 min halt
                          3. 11:23 PMMMRManmad Jn · 2 min halt
                          12:13 AM+1 dayCSNChalisgaon Jn
                        4. Change at Chalisgaon

                          • Same station, no local travel
                          • Safety buffer: 202 min (3 h 22 min) Total wait: 202 min

                          Night-time change — plan safe waiting and local transport

                          Partner link

                          Long wait at Chalisgaon?

                          Find a room near Chalisgaon Jn
                        5. 3:35 AM+1 dayCSNChalisgaon Jn

                          Train12322Howrah Mail

                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                          Runs: Daily

                          Indian Railways · 23 h 53 min · 1456 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹370SL ₹6953A ₹1,7952A ₹2,5151A ₹4,175(est.)

                          27 stops — Show or hide intermediate stops
                          1. 4:48 AMJLJalgaon Jn · 2 min halt
                          2. 5:20 AMBSLBhusaval Jn · 5 min halt
                          3. 6:08 AMBAUBurhanpur · 2 min halt
                          4. 7:23 AMKNWKhandwa · 2 min halt
                          5. 8:30 AMHDHarda · 2 min halt
                          6. 9:50 AMETItarsi Jn · 10 min halt
                          7. 10:46 AMPPIPipariya · 2 min halt
                          8. 11:20 AMGARGadarwara · 2 min halt
                          9. 11:40 AMKYKareli · 2 min halt
                          10. 11:54 AMNUNarsinghpur · 2 min halt
                          11. 12:20 PMSRIDSridham · 2 min halt
                          12. 1:20 PMJBPJabalpur · 10 min halt
                          13. 2:35 PMKTEKatni · 5 min halt
                          14. 3:28 PMMYRMaihar · 2 min halt
                          15. 4:20 PMSTASatna · 5 min halt
                          16. 5:50 PMMKPManikpur Jn · 2 min halt
                          17. 6:43 PMSRJShankargarh · 1 min halt
                          18. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                          19. 8:20 PMBDLVindhyachal · 2 min halt
                          20. 8:35 PMMZPMirzapur · 5 min halt
                          21. 9:13 PMCARChunar · 2 min halt
                          22. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                          23. 11:36 PMBBUBhabua Road · 2 min halt
                          24. 12:08 AMSSMSasaram · 2 min halt
                          25. 12:24 AMDOSDehri ON Sone · 2 min halt
                          26. 12:40 AMAUBRAnugraha N Road · 2 min halt
                          27. 2:05 AMGAYAGaya Jn · 5 min halt
                          3:28 AM+2 daysKQRKoderma
                      3. Option 4: 7:35 AM6:45 PM+1 day

                        35 h 10 min2 changesSmallest buffer: 247 minfrom ₹450 (est.)

                        via Kalyan · Varanasi

                        1. 7:35 AMTNAThane

                          Train11007Deccan Express

                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 07:00 (7:00 AM) · you board on day 1

                          Ends at Pune Jn (PUNE) at Wed, 18 Nov 11:05

                          Runs: Daily

                          Indian Railways · 18 min · 21 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹5CC ₹100(est.)

                          7:53 AMKYNKalyan Jn
                        2. Change at Kalyan

                          • Same station, no local travel
                          • Safety buffer: 247 min (4 h 7 min) Total wait: 247 min

                          Partner link

                          Long wait at Kalyan?

                          Find a room near Kalyan Jn
                        3. 12:00 PMKYNKalyan Jn

                          Train12362Asansol SF Express

                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1

                          Ends at Asansol Jn (ASN) at Thu, 19 Nov 20:45

                          Runs: Wed

                          Indian Railways · 22 h 18 min · 1444 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹365SL ₹6903A ₹1,7802A ₹2,500(est.)

                          9 stops — Show or hide intermediate stops
                          1. 3:33 PMMMRManmad Jn · 2 min halt
                          2. 5:55 PMBSLBhusaval Jn · 5 min halt
                          3. 7:57 PMKNWKhandwa · 3 min halt
                          4. 10:25 PMETItarsi Jn · 10 min halt
                          5. 1:25 AMJBPJabalpur · 10 min halt
                          6. 2:55 AMKTEKatni · 5 min halt
                          7. 4:25 AMSTASatna · 5 min halt
                          8. 7:48 AMPCOIPrayagraj Chheoki · 2 min halt
                          9. 8:45 AMMZPMirzapur · 5 min halt
                          10:18 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                        4. Change at Varanasi

                          • Same station, no local travel
                          • Safety buffer: 247 min (4 h 7 min) Total wait: 247 min

                          Partner link

                          Long wait at Varanasi?

                          Find a room near Pt. Deen Dayal Upadhyaya Jn
                        5. 2:25 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                          Train01911Kolkata Special Fare Special

                          Starts from Agra Cantt (AGC) on Thu, 19 Nov at 03:40 (3:40 AM) · you board on day 1

                          Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 04:05

                          Runs: Thu

                          Indian Railways · 4 h 20 min · 283 km

                          Scheduled timetable. From the published timetable. Delays are possible.

                          GN ₹80SL ₹1753A ₹4752A ₹665(est.)

                          2 stops — Show or hide intermediate stops
                          1. 3:35 PMSSMSasaram · 2 min halt
                          2. 5:30 PMGAYAGaya Jn · 5 min halt
                          6:45 PM+1 dayKQRKoderma
                      Search another date

                      via Prayagraj · 19 routes · best 35 h 4 min

                        All 19 combinations via Prayagraj
                        1. Option 2: 11:15 AM10:19 PM+1 day

                          35 h 4 min2 changesSmallest buffer: 185 minfrom ₹670 (est.)

                          via Prayagraj · Varanasi

                          1. 11:15 AMTNAThane

                            Train11055Godan Express

                            Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                            Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 20:35

                            Runs: Sun, Mon, Wed, Fri

                            Indian Railways · 20 h 55 min · 1328 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹330SL ₹6203A ₹1,6252A ₹2,300(est.)

                            6 stops — Show or hide intermediate stops
                            1. 11:37 AMKYNKalyan Jn · 3 min halt
                            2. 2:15 PMNKNasik Road · 5 min halt
                            3. 5:30 PMBSLBhusaval Jn · 5 min halt
                            4. 10:00 PMETItarsi Jn · 10 min halt
                            5. 1:00 AMJBPJabalpur · 10 min halt
                            6. 3:45 AMSTASatna · 5 min halt
                            8:10 AM+1 dayPRYJPrayagraj Jn
                          2. Change at Prayagraj

                            • Same station, no local travel
                            • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
                          3. 11:15 AM+1 dayPRYJPrayagraj Jn

                            Train20176Agra Cantt - Banaras Vande Bharat Express

                            Starts from Agra Cantt (AGC) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 1

                            Ends at Banaras (BNRS) at Thu, 19 Nov 13:00

                            Runs: Sun, Mon, Tue, Thu, Fri, Sat

                            Indian Railways · 1 h 45 min · 121 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            CC ₹260EC ₹485(est.)

                            1:00 PM+1 dayBNRSBanaras
                          4. Change at Varanasi

                            • Local transit: 65 min · Banaras (BNRS) → Pt. Deen Dayal Upadhyaya Jn (DDU)
                            • Safety buffer: 185 min (3 h 5 min) Total wait: 250 min

                            Station change — you must travel to a different station or bus stand

                            Partner link

                            Long wait at Varanasi?

                            Find a room near Pt. Deen Dayal Upadhyaya Jn
                          5. 5:10 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                            Train13010Doon Express

                            Starts from Yog Nagari Rishikesh (YNRK) on Wed, 18 Nov at 20:55 (8:55 PM) · you board on day 2

                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 07:00

                            Runs: Daily

                            Indian Railways · 5 h 9 min · 284 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹80SL ₹1753A ₹4752A ₹6651A ₹1,080(est.)

                            15 stops — Show or hide intermediate stops
                            1. 5:35 PMCDMRChandauli Mjhwr · 2 min halt
                            2. 5:50 PMKMSKaramnasa · 2 min halt
                            3. 5:58 PMDGODurgauti · 2 min halt
                            4. 6:08 PMBBUBhabua Road · 2 min halt
                            5. 6:24 PMKTQKudra · 2 min halt
                            6. 6:47 PMSSMSasaram · 2 min halt
                            7. 7:01 PMDOSDehri ON Sone · 2 min halt
                            8. 7:16 PMAUBRAnugraha N Road · 2 min halt
                            9. 7:26 PMPESPhesar · 2 min halt
                            10. 7:37 PMJHNJakhim · 2 min halt
                            11. 7:48 PMRFJRafiganj · 2 min halt
                            12. 8:01 PMGRRUGuraru · 2 min halt
                            13. 8:45 PMGAYAGaya Jn · 5 min halt
                            14. 9:32 PMTKNTankuppa · 2 min halt
                            15. 9:41 PMPRPPaharpur · 2 min halt
                            10:19 PM+1 dayKQRKoderma
                        2. Option 3: 11:15 AM10:24 PM+1 day

                          35 h 9 min2 changesSmallest buffer: 205 minfrom ₹470 (est.)

                          via Prayagraj · Varanasi

                          1. 11:15 AMTNAThane

                            Train11055Godan Express

                            Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                            Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 20:35

                            Runs: Sun, Mon, Wed, Fri

                            Indian Railways · 20 h 55 min · 1328 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹330SL ₹6203A ₹1,6252A ₹2,300(est.)

                            6 stops — Show or hide intermediate stops
                            1. 11:37 AMKYNKalyan Jn · 3 min halt
                            2. 2:15 PMNKNasik Road · 5 min halt
                            3. 5:30 PMBSLBhusaval Jn · 5 min halt
                            4. 10:00 PMETItarsi Jn · 10 min halt
                            5. 1:00 AMJBPJabalpur · 10 min halt
                            6. 3:45 AMSTASatna · 5 min halt
                            8:10 AM+1 dayPRYJPrayagraj Jn
                          2. Change at Prayagraj

                            • Same station, no local travel
                            • Safety buffer: 205 min (3 h 25 min) Total wait: 205 min
                          3. 11:35 AM+1 dayPRYJPrayagraj Jn

                            Train04737Patna Special Fare Festival Special

                            Starts from Hanumangarh Jn (HMH) on Wed, 18 Nov at 10:30 (10:30 AM) · you board on day 2

                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Patna Jn (PNBE) at Thu, 19 Nov 19:30

                            Runs: Wed

                            Indian Railways · 3 h 15 min · 153 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹45SL ₹130(est.)

                            2:50 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                          4. Change at Varanasi

                            • Same station, no local travel
                            • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                          5. 6:20 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                            Train22308Howrah SF Express

                            Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                            Runs: Sun, Wed, Sat

                            Indian Railways · 4 h 4 min · 283 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹95SL ₹2053A ₹5202A ₹7101A ₹1,155(est.)

                            5 stops — Show or hide intermediate stops
                            1. 7:00 PMBBUBhabua Road · 2 min halt
                            2. 7:30 PMSSMSasaram · 2 min halt
                            3. 7:50 PMDOSDehri ON Sone · 2 min halt
                            4. 8:08 PMAUBRAnugraha N Road · 2 min halt
                            5. 9:10 PMGAYAGaya Jn · 5 min halt
                            10:24 PM+1 dayKQRKoderma
                        3. Option 4: 11:55 PM11:19 AM+2 days

                          35 h 24 min2 changesSmallest buffer: 192 minfrom ₹495 (est.)

                          via Prayagraj · Varanasi

                          1. 11:55 PMTNAThane

                            Train12141Patliputra SF Express

                            Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

                            Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

                            Runs: Daily

                            Indian Railways · 21 h 23 min · 1321 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹340SL ₹6453A ₹1,6652A ₹2,3351A ₹3,870(est.)

                            8 stops — Show or hide intermediate stops
                            1. 12:17 AMKYNKalyan Jn · 3 min halt
                            2. 2:40 AMNKNasik Road · 5 min halt
                            3. 3:43 AMMMRManmad Jn · 2 min halt
                            4. 5:33 AMJLJalgaon Jn · 2 min halt
                            5. 6:15 AMBSLBhusaval Jn · 5 min halt
                            6. 10:55 AMETItarsi Jn · 10 min halt
                            7. 2:20 PMJBPJabalpur · 10 min halt
                            8. 5:35 PMSTASatna · 5 min halt
                            9:18 PM+1 dayPCOIPrayagraj Chheoki
                          2. Change at Prayagraj

                            • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
                            • Safety buffer: 202 min (3 h 22 min) Total wait: 242 min

                            Night-time change — plan safe waiting and local transport

                            Partner link

                            Long wait at Prayagraj?

                            Find a room near Prayagraj Jn
                          3. 1:20 AM+2 daysPRYJPrayagraj Jn

                            Train12304Poorva Express

                            Starts from Shakurbasti (SSB) on Thu, 19 Nov at 16:35 (4:35 PM) · you board on day 2

                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 17:00

                            Runs: Sun, Wed, Thu, Sat

                            Indian Railways · 2 h 18 min · 152 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹60SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                            3:38 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn
                          4. Change at Varanasi

                            • Same station, no local travel
                            • Safety buffer: 192 min (3 h 12 min) Total wait: 192 min

                            Night-time change — plan safe waiting and local transport

                            Partner link

                            Long wait at Varanasi?

                            Find a room near Pt. Deen Dayal Upadhyaya Jn
                          5. 6:50 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                            Train12818Swarna Jayanti Express

                            Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 20:45 (8:45 PM) · you board on day 2

                            This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                            Ends at Hatia (HTE) at Fri, 20 Nov 17:15

                            Runs: Mon, Thu, Sat

                            Indian Railways · 4 h 29 min · 283 km

                            Scheduled timetable. From the published timetable. Delays are possible.

                            GN ₹95SL ₹2053A ₹5202A ₹7101A ₹1,155(est.)

                            7 stops — Show or hide intermediate stops
                            1. 7:36 AMBBUBhabua Road · 2 min halt
                            2. 8:15 AMSSMSasaram · 2 min halt
                            3. 8:32 AMDOSDehri ON Sone · 2 min halt
                            4. 8:48 AMAUBRAnugraha N Road · 2 min halt
                            5. 9:13 AMRFJRafiganj · 2 min halt
                            6. 9:28 AMGRRUGuraru · 2 min halt
                            7. 10:05 AMGAYAGaya Jn · 5 min halt
                            11:19 AM+2 daysKQRKoderma
                        Search another date

                        via Bharatpur · 2 routes · best 35 h 6 min

                          All 2 combinations via Bharatpur
                          1. Option 2: 7:18 PM6:24 AM+2 days

                            35 h 6 min1 changeSmallest buffer: 197 minfrom ₹575 (est.)

                            via Bharatpur

                            1. 7:18 PMBVIBorivali

                              Train12903Golden Temple Mail

                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 18:45 (6:45 PM) · you board on day 1

                              Ends at Amritsar Jn (ASR) at Thu, 19 Nov 23:45

                              Runs: Daily

                              Indian Railways · 15 h 35 min · 1185 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹315SL ₹5953A ₹1,5352A ₹2,1501A ₹3,565(est.)

                              16 stops — Show or hide intermediate stops
                              1. 9:59 PMSTSurat · 5 min halt
                              2. 11:34 PMBRCVadodara Jn · 10 min halt
                              3. 12:49 AMGDAGodhra Jn · 2 min halt
                              4. 1:38 AMDHDDahod · 2 min halt
                              5. 2:04 AMMGNMeghnagar · 2 min halt
                              6. 3:30 AMRTMRatlam Jn · 5 min halt
                              7. 4:23 AMNADNagda Jn · 5 min halt
                              8. 5:23 AMSGZShamgarh · 2 min halt
                              9. 5:48 AMBWMBhawani Mandi · 2 min halt
                              10. 6:08 AMRMARamganj Mandi · 2 min halt
                              11. 7:05 AMKOTAKota Jn · 10 min halt
                              12. 8:25 AMSWMSawai Madhopur · 5 min halt
                              13. 9:10 AMGGCGangapur City · 5 min halt
                              14. 9:38 AMSMVJShri Mahaveerji · 2 min halt
                              15. 9:53 AMHANHindaun City · 2 min halt
                              16. 10:23 AMBXNBayana Jn · 2 min halt
                              10:53 AM+1 dayBTEBharatpur Jn
                            2. Change at Bharatpur

                              • Same station, no local travel
                              • Safety buffer: 197 min (3 h 17 min) Total wait: 197 min
                            3. 2:10 PM+1 dayBTEBharatpur Jn

                              Train12495Pratap SF Express

                              Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 1

                              Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                              Runs: Thu

                              Indian Railways · 16 h 14 min · 938 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹260SL ₹5003A ₹1,2852A ₹1,795(est.)

                              7 stops — Show or hide intermediate stops
                              1. 2:36 PMAHAchhnera Jn · 2 min halt
                              2. 3:20 PMAFAgra Fort · 10 min halt
                              3. 4:30 PMTDLTundla Jn · 5 min halt
                              4. 7:30 PMCNBKanpur Central · 5 min halt
                              5. 10:05 PMPRYJPrayagraj Jn · 5 min halt
                              6. 2:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                              7. 5:05 AMGAYAGaya Jn · 5 min halt
                              6:24 AM+2 daysKQRKoderma
                          2. Option 3: 7:18 PM9:02 AM+2 days

                            37 h 44 min1 changeSmallest buffer: 384 minfrom ₹575 (est.)

                            via Bharatpur

                            1. 7:18 PMBVIBorivali

                              Train12903Golden Temple Mail

                              Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 18:45 (6:45 PM) · you board on day 1

                              Ends at Amritsar Jn (ASR) at Thu, 19 Nov 23:45

                              Runs: Daily

                              Indian Railways · 15 h 35 min · 1185 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹315SL ₹5953A ₹1,5352A ₹2,1501A ₹3,565(est.)

                              16 stops — Show or hide intermediate stops
                              1. 9:59 PMSTSurat · 5 min halt
                              2. 11:34 PMBRCVadodara Jn · 10 min halt
                              3. 12:49 AMGDAGodhra Jn · 2 min halt
                              4. 1:38 AMDHDDahod · 2 min halt
                              5. 2:04 AMMGNMeghnagar · 2 min halt
                              6. 3:30 AMRTMRatlam Jn · 5 min halt
                              7. 4:23 AMNADNagda Jn · 5 min halt
                              8. 5:23 AMSGZShamgarh · 2 min halt
                              9. 5:48 AMBWMBhawani Mandi · 2 min halt
                              10. 6:08 AMRMARamganj Mandi · 2 min halt
                              11. 7:05 AMKOTAKota Jn · 10 min halt
                              12. 8:25 AMSWMSawai Madhopur · 5 min halt
                              13. 9:10 AMGGCGangapur City · 5 min halt
                              14. 9:38 AMSMVJShri Mahaveerji · 2 min halt
                              15. 9:53 AMHANHindaun City · 2 min halt
                              16. 10:23 AMBXNBayana Jn · 2 min halt
                              10:53 AM+1 dayBTEBharatpur Jn
                            2. Change at Bharatpur

                              • Same station, no local travel
                              • Safety buffer: 384 min (6 h 24 min) Total wait: 384 min

                              Partner link

                              Long wait at Bharatpur?

                              Find a room near Bharatpur Jn
                            3. 5:17 PM+1 dayBTEBharatpur Jn

                              Train12988Sealdah SF Express

                              Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 1

                              Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

                              Runs: Daily

                              Indian Railways · 15 h 45 min · 936 km

                              Scheduled timetable. From the published timetable. Delays are possible.

                              GN ₹260SL ₹5003A ₹1,2852A ₹1,7901A ₹2,970(est.)

                              10 stops — Show or hide intermediate stops
                              1. 5:40 PMAHAchhnera Jn · 2 min halt
                              2. 6:40 PMAFAgra Fort · 5 min halt
                              3. 8:20 PMTDLTundla Jn · 5 min halt
                              4. 10:55 PMGOYGovindpuri · 10 min halt
                              5. 1:50 AMPRYJPrayagraj Jn · 5 min halt
                              6. 4:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                              7. 5:35 AMBBUBhabua Road · 2 min halt
                              8. 6:05 AMSSMSasaram · 2 min halt
                              9. 6:20 AMDOSDehri ON Sone · 2 min halt
                              10. 7:50 AMGAYAGaya Jn · 5 min halt
                              9:02 AM+2 daysKQRKoderma

                          via Satna · 6 routes · best 35 h 9 min

                            All 6 combinations via Satna
                            1. Option 2: 11:15 AM10:24 PM+1 day

                              35 h 9 min2 changesSmallest buffer: 235 minfrom ₹490 (est.)

                              via Satna · Prayagraj

                              1. 11:15 AMTNAThane

                                Train11055Godan Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 20:35

                                Runs: Sun, Mon, Wed, Fri

                                Indian Railways · 16 h 30 min · 1151 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹290SL ₹5553A ₹1,4602A ₹2,060(est.)

                                5 stops — Show or hide intermediate stops
                                1. 11:37 AMKYNKalyan Jn · 3 min halt
                                2. 2:15 PMNKNasik Road · 5 min halt
                                3. 5:30 PMBSLBhusaval Jn · 5 min halt
                                4. 10:00 PMETItarsi Jn · 10 min halt
                                5. 1:00 AMJBPJabalpur · 10 min halt
                                3:45 AM+1 daySTASatna
                              2. Change at Satna

                                • Same station, no local travel
                                • Safety buffer: 235 min (3 h 55 min) Total wait: 235 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Satna?

                                Find a room near Satna
                              3. 7:40 AM+1 daySTASatna

                                Train12563Mumbai Ltt - Faizabad SF Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Ayodhya Cantt (AYC) at Thu, 19 Nov 17:40

                                Runs: Daily · Running days not verified — check before booking

                                Indian Railways · 4 h · 172 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹65SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                1 stop — Show or hide intermediate stops
                                1. 9:45 AMMKPManikpur Jn · 2 min halt
                                11:40 AM+1 dayPRYJPrayagraj Jn
                              4. Change at Prayagraj

                                • Same station, no local travel
                                • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                Partner link

                                Long wait at Prayagraj?

                                Find a room near Prayagraj Jn
                              5. 3:45 PM+1 dayPRYJPrayagraj Jn

                                Train22308Howrah SF Express

                                Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                                Runs: Sun, Wed, Sat

                                Indian Railways · 6 h 39 min · 436 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                                7 stops — Show or hide intermediate stops
                                1. 4:48 PMMZPMirzapur · 2 min halt
                                2. 6:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                3. 7:00 PMBBUBhabua Road · 2 min halt
                                4. 7:30 PMSSMSasaram · 2 min halt
                                5. 7:50 PMDOSDehri ON Sone · 2 min halt
                                6. 8:08 PMAUBRAnugraha N Road · 2 min halt
                                7. 9:10 PMGAYAGaya Jn · 5 min halt
                                10:24 PM+1 dayKQRKoderma
                            2. Option 3: 11:15 AM10:40 PM+1 day

                              35 h 25 min2 changesSmallest buffer: 243 minfrom ₹475 (est.)

                              via Satna · Prayagraj

                              1. 11:15 AMTNAThane

                                Train11055Godan Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 20:35

                                Runs: Sun, Mon, Wed, Fri

                                Indian Railways · 16 h 30 min · 1151 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹290SL ₹5553A ₹1,4602A ₹2,060(est.)

                                5 stops — Show or hide intermediate stops
                                1. 11:37 AMKYNKalyan Jn · 3 min halt
                                2. 2:15 PMNKNasik Road · 5 min halt
                                3. 5:30 PMBSLBhusaval Jn · 5 min halt
                                4. 10:00 PMETItarsi Jn · 10 min halt
                                5. 1:00 AMJBPJabalpur · 10 min halt
                                3:45 AM+1 daySTASatna
                              2. Change at Satna

                                • Same station, no local travel
                                • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Satna?

                                Find a room near Satna
                              3. 7:50 AM+1 daySTASatna

                                Train15160Sarnath Express

                                Starts from Durg (DURG) on Wed, 18 Nov at 20:30 (8:30 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Chhapra (CPR) at Thu, 19 Nov 21:35

                                Runs: Daily

                                Indian Railways · 3 h 37 min · 170 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹50SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                5 stops — Show or hide intermediate stops
                                1. 8:08 AMJTWJaitwar · 2 min halt
                                2. 8:28 AMMJGMajhagawan · 2 min halt
                                3. 9:30 AMMKPManikpur Jn · 5 min halt
                                4. 9:55 AMDBRDabhaura · 1 min halt
                                5. 10:29 AMSRJShankargarh · 1 min halt
                                11:27 AM+1 dayNYNNaini
                              4. Change at Prayagraj

                                • Local transit: 35 min · Naini (NYN) → Prayagraj Jn (PRYJ)
                                • Safety buffer: 243 min (4 h 3 min) Total wait: 278 min

                                Station change — you must travel to a different station or bus stand

                                Partner link

                                Long wait at Prayagraj?

                                Find a room near Prayagraj Jn
                              5. 4:05 PM+1 dayPRYJPrayagraj Jn

                                Train12816Nandan Kanan Express

                                Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 07:30 (7:30 AM) · you board on day 1

                                Ends at Puri (PURI) at Fri, 20 Nov 14:50

                                Runs: Mon, Wed, Thu, Sat

                                Indian Railways · 6 h 35 min · 436 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                                5 stops — Show or hide intermediate stops
                                1. 5:08 PMMZPMirzapur · 2 min halt
                                2. 6:28 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                3. 7:48 PMSSMSasaram · 2 min halt
                                4. 8:06 PMDOSDehri ON Sone · 2 min halt
                                5. 9:25 PMGAYAGaya Jn · 5 min halt
                                10:40 PM+1 dayKQRKoderma
                            3. Option 4: 11:15 AM11:23 PM+1 day

                              36 h 8 min2 changesSmallest buffer: 245 minfrom ₹475 (est.)

                              via Satna · Prayagraj

                              1. 11:15 AMTNAThane

                                Train11055Godan Express

                                Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:55 (10:55 AM) · you board on day 1

                                Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 20:35

                                Runs: Sun, Mon, Wed, Fri

                                Indian Railways · 16 h 30 min · 1151 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹290SL ₹5553A ₹1,4602A ₹2,060(est.)

                                5 stops — Show or hide intermediate stops
                                1. 11:37 AMKYNKalyan Jn · 3 min halt
                                2. 2:15 PMNKNasik Road · 5 min halt
                                3. 5:30 PMBSLBhusaval Jn · 5 min halt
                                4. 10:00 PMETItarsi Jn · 10 min halt
                                5. 1:00 AMJBPJabalpur · 10 min halt
                                3:45 AM+1 daySTASatna
                              2. Change at Satna

                                • Same station, no local travel
                                • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                Night-time change — plan safe waiting and local transport

                                Partner link

                                Long wait at Satna?

                                Find a room near Satna
                              3. 7:50 AM+1 daySTASatna

                                Train15160Sarnath Express

                                Starts from Durg (DURG) on Wed, 18 Nov at 20:30 (8:30 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Chhapra (CPR) at Thu, 19 Nov 21:35

                                Runs: Daily

                                Indian Railways · 4 h 20 min · 178 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹50SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

                                6 stops — Show or hide intermediate stops
                                1. 8:08 AMJTWJaitwar · 2 min halt
                                2. 8:28 AMMJGMajhagawan · 2 min halt
                                3. 9:30 AMMKPManikpur Jn · 5 min halt
                                4. 9:55 AMDBRDabhaura · 1 min halt
                                5. 10:29 AMSRJShankargarh · 1 min halt
                                6. 11:27 AMNYNNaini · 1 min halt
                                12:10 PM+1 dayPRYJPrayagraj Jn
                              4. Change at Prayagraj

                                • Same station, no local travel
                                • Safety buffer: 260 min (4 h 20 min) Total wait: 260 min

                                Partner link

                                Long wait at Prayagraj?

                                Find a room near Prayagraj Jn
                              5. 4:30 PM+1 dayPRYJPrayagraj Jn

                                Train12324Howrah SF Express

                                Starts from Barmer (BME) on Wed, 18 Nov at 17:00 (5:00 PM) · you board on day 2

                                This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 05:45

                                Runs: Wed, Sat

                                Indian Railways · 6 h 53 min · 436 km

                                Scheduled timetable. From the published timetable. Delays are possible.

                                GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                                3 stops — Show or hide intermediate stops
                                1. 7:18 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                2. 8:30 PMSSMSasaram · 2 min halt
                                3. 10:05 PMGAYAGaya Jn · 5 min halt
                                11:23 PM+1 dayKQRKoderma
                            Search another date

                            via Varanasi · 28 routes · best 35 h 24 min

                              All 28 combinations via Varanasi
                              1. Option 2: 11:55 PM11:19 AM+2 days

                                35 h 24 min2 changesSmallest buffer: 189 minfrom ₹465 (est.)

                                via Varanasi · Sasaram

                                1. 11:55 PMTNAThane

                                  Train12141Patliputra SF Express

                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 23:35 (11:35 PM) · you board on day 1

                                  Ends at Patliputra (PPTA) at Fri, 20 Nov 03:50

                                  Runs: Daily

                                  Indian Railways · 24 h 23 min · 1464 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹370SL ₹6953A ₹1,8002A ₹2,5251A ₹4,195(est.)

                                  9 stops — Show or hide intermediate stops
                                  1. 12:17 AMKYNKalyan Jn · 3 min halt
                                  2. 2:40 AMNKNasik Road · 5 min halt
                                  3. 3:43 AMMMRManmad Jn · 2 min halt
                                  4. 5:33 AMJLJalgaon Jn · 2 min halt
                                  5. 6:15 AMBSLBhusaval Jn · 5 min halt
                                  6. 10:55 AMETItarsi Jn · 10 min halt
                                  7. 2:20 PMJBPJabalpur · 10 min halt
                                  8. 5:35 PMSTASatna · 5 min halt
                                  9. 9:18 PMPCOIPrayagraj Chheoki · 2 min halt
                                  12:18 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn
                                2. Change at Varanasi

                                  • Same station, no local travel
                                  • Safety buffer: 217 min (3 h 37 min) Total wait: 217 min

                                  Night-time change — plan safe waiting and local transport

                                  Partner link

                                  Long wait at Varanasi?

                                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                                3. 3:55 AM+2 daysDDUPt. Deen Dayal Upadhyaya Jn

                                  Train04064Gaya Special Fare Festival Special

                                  Starts from Delhi Jn (DLI) on Thu, 19 Nov at 11:00 (11:00 AM) · you board on day 2

                                  This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Gaya Jn (GAYA) at Fri, 20 Nov 07:15

                                  Runs: Sun, Mon, Tue, Wed, Thu, Fri

                                  Indian Railways · 1 h 13 min · 105 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹30SL ₹1303A ₹4752A ₹665(est.)

                                  1 stop — Show or hide intermediate stops
                                  1. 4:35 AMBBUBhabua Road · 2 min halt
                                  5:08 AM+2 daysSSMSasaram
                                4. Change at Sasaram

                                  • Same station, no local travel
                                  • Safety buffer: 189 min (3 h 9 min) Total wait: 189 min

                                  Partner link

                                  Long wait at Sasaram?

                                  Find a room near Sasaram
                                5. 8:17 AM+2 daysSSMSasaram

                                  Train12818Swarna Jayanti Express

                                  Starts from Anand Vihar Terminal (ANVT) on Thu, 19 Nov at 20:45 (8:45 PM) · you board on day 2

                                  This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Hatia (HTE) at Fri, 20 Nov 17:15

                                  Runs: Mon, Thu, Sat

                                  Indian Railways · 3 h 2 min · 179 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹65SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                  5 stops — Show or hide intermediate stops
                                  1. 8:32 AMDOSDehri ON Sone · 2 min halt
                                  2. 8:48 AMAUBRAnugraha N Road · 2 min halt
                                  3. 9:13 AMRFJRafiganj · 2 min halt
                                  4. 9:28 AMGRRUGuraru · 2 min halt
                                  5. 10:05 AMGAYAGaya Jn · 5 min halt
                                  11:19 AM+2 daysKQRKoderma
                              2. Option 3: 11:55 AM11:23 PM+1 day

                                35 h 28 min2 changesSmallest buffer: 205 minfrom ₹770 (est.)

                                via Varanasi · Gaya

                                1. 11:55 AMTNAThane

                                  Train11061Pawan Express

                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                                  Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

                                  Runs: Daily

                                  Indian Railways · 23 h 58 min · 1447 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹350SL ₹6603A ₹1,7402A ₹2,460(est.)

                                  21 stops — Show or hide intermediate stops
                                  1. 12:12 PMKYNKalyan Jn · 3 min halt
                                  2. 2:50 PMNKNasik Road · 5 min halt
                                  3. 4:00 PMMMRManmad Jn · 5 min halt
                                  4. 4:53 PMCSNChalisgaon Jn · 2 min halt
                                  5. 5:28 PMPCPachora Jn · 2 min halt
                                  6. 6:13 PMJLJalgaon Jn · 2 min halt
                                  7. 6:45 PMBSLBhusaval Jn · 5 min halt
                                  8. 7:38 PMBAUBurhanpur · 2 min halt
                                  9. 8:57 PMKNWKhandwa · 3 min halt
                                  10. 11:20 PMETItarsi Jn · 10 min halt
                                  11. 12:18 AMPPIPipariya · 2 min halt
                                  12. 1:18 AMNUNarsinghpur · 2 min halt
                                  13. 2:40 AMJBPJabalpur · 10 min halt
                                  14. 4:00 AMKTEKatni · 5 min halt
                                  15. 4:48 AMMYRMaihar · 2 min halt
                                  16. 5:25 AMSTASatna · 5 min halt
                                  17. 7:25 AMMKPManikpur Jn · 2 min halt
                                  18. 8:59 AMNYNNaini · 1 min halt
                                  19. 9:30 AMPRYJPrayagraj Jn · 25 min halt
                                  20. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
                                  21. 11:08 AMGYNGyanpur Road · 2 min halt
                                  11:53 AM+1 dayBHLPBhulanpur
                                2. Change at Varanasi

                                  • Local transit: 65 min · Bhulanpur (BHLP) → Pt. Deen Dayal Upadhyaya Jn (DDU)
                                  • Safety buffer: 222 min (3 h 42 min) Total wait: 287 min

                                  Station change — you must travel to a different station or bus stand

                                  Partner link

                                  Long wait at Varanasi?

                                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                                3. 4:40 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                  Train20888Varanasi - Ranchi Vande Bharat Express

                                  Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 15:55 (3:55 PM) · you board on day 1

                                  Ends at Ranchi (RNC) at Thu, 19 Nov 23:55

                                  Runs: Sun, Mon, Wed, Thu, Fri, Sat

                                  Indian Railways · 2 h 5 min · 208 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  CC ₹385(est.)

                                  1 stop — Show or hide intermediate stops
                                  1. 5:40 PMSSMSasaram · 2 min halt
                                  6:45 PM+1 dayGAYAGaya Jn
                                4. Change at Gaya

                                  • Same station, no local travel
                                  • Safety buffer: 205 min (3 h 25 min) Total wait: 205 min
                                5. 10:10 PM+1 dayGAYAGaya Jn

                                  Train12324Howrah SF Express

                                  Starts from Barmer (BME) on Wed, 18 Nov at 17:00 (5:00 PM) · you board on day 2

                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                  Ends at Howrah Jn (HWH) at Fri, 20 Nov 05:45

                                  Runs: Wed, Sat

                                  Indian Railways · 1 h 13 min · 76 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹35SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                  11:23 PM+1 dayKQRKoderma
                              3. Option 4: 11:55 AM11:50 PM+1 day

                                35 h 55 min2 changesSmallest buffer: 188 minfrom ₹935 (est.)

                                via Varanasi · Hazaribagh

                                1. 11:55 AMTNAThane

                                  Train11061Pawan Express

                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                                  Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

                                  Runs: Daily

                                  Indian Railways · 23 h 58 min · 1447 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹350SL ₹6603A ₹1,7402A ₹2,460(est.)

                                  21 stops — Show or hide intermediate stops
                                  1. 12:12 PMKYNKalyan Jn · 3 min halt
                                  2. 2:50 PMNKNasik Road · 5 min halt
                                  3. 4:00 PMMMRManmad Jn · 5 min halt
                                  4. 4:53 PMCSNChalisgaon Jn · 2 min halt
                                  5. 5:28 PMPCPachora Jn · 2 min halt
                                  6. 6:13 PMJLJalgaon Jn · 2 min halt
                                  7. 6:45 PMBSLBhusaval Jn · 5 min halt
                                  8. 7:38 PMBAUBurhanpur · 2 min halt
                                  9. 8:57 PMKNWKhandwa · 3 min halt
                                  10. 11:20 PMETItarsi Jn · 10 min halt
                                  11. 12:18 AMPPIPipariya · 2 min halt
                                  12. 1:18 AMNUNarsinghpur · 2 min halt
                                  13. 2:40 AMJBPJabalpur · 10 min halt
                                  14. 4:00 AMKTEKatni · 5 min halt
                                  15. 4:48 AMMYRMaihar · 2 min halt
                                  16. 5:25 AMSTASatna · 5 min halt
                                  17. 7:25 AMMKPManikpur Jn · 2 min halt
                                  18. 8:59 AMNYNNaini · 1 min halt
                                  19. 9:30 AMPRYJPrayagraj Jn · 25 min halt
                                  20. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
                                  21. 11:08 AMGYNGyanpur Road · 2 min halt
                                  11:53 AM+1 dayBHLPBhulanpur
                                2. Change at Varanasi

                                  • Local transit: 65 min · Bhulanpur (BHLP) → Pt. Deen Dayal Upadhyaya Jn (DDU)
                                  • Safety buffer: 222 min (3 h 42 min) Total wait: 287 min

                                  Station change — you must travel to a different station or bus stand

                                  Partner link

                                  Long wait at Varanasi?

                                  Find a room near Pt. Deen Dayal Upadhyaya Jn
                                3. 4:40 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                  Train20888Varanasi - Ranchi Vande Bharat Express

                                  Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 15:55 (3:55 PM) · you board on day 1

                                  Ends at Ranchi (RNC) at Thu, 19 Nov 23:55

                                  Runs: Sun, Mon, Wed, Thu, Fri, Sat

                                  Indian Railways · 3 h 37 min · 332 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  CC ₹555(est.)

                                  3 stops — Show or hide intermediate stops
                                  1. 5:40 PMSSMSasaram · 2 min halt
                                  2. 6:45 PMGAYAGaya Jn · 5 min halt
                                  3. 7:50 PMKQRKoderma · 2 min halt
                                  8:17 PM+1 dayHZDHazaribagh Road
                                4. Change at Hazaribagh

                                  • Same station, no local travel
                                  • Safety buffer: 188 min (3 h 8 min) Total wait: 188 min
                                5. 11:25 PM+1 dayHZDHazaribagh Road

                                  Train22912Shipra Express

                                  Starts from Howrah Jn (HWH) on Thu, 19 Nov at 17:45 (5:45 PM) · you board on day 1

                                  Ends at Indore Jn (INDB) at Sat, 21 Nov 00:15

                                  Runs: Mon, Thu, Sat

                                  Indian Railways · 25 min · 49 km

                                  Scheduled timetable. From the published timetable. Delays are possible.

                                  GN ₹30SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                  11:50 PM+1 dayKQRKoderma
                              Search another date

                              via Mumbai · 9 routes · best 35 h 25 min

                                All 9 combinations via Mumbai
                                1. Option 2: 3:49 AM3:14 PM+1 day

                                  35 h 25 min2 changesSmallest buffer: 188 minfrom ₹460 (est.)

                                  via Mumbai · Varanasi

                                  1. 3:49 AMBVIBorivali

                                    Train19040Awadh Express

                                    Starts from Muzaffarpur Jn (MFP) on Mon, 16 Nov at 06:15 (6:15 AM) · you board on day 3

                                    This train starts on Mon, 16 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 04:40

                                    Runs: Daily · Running days not verified — check before booking

                                    Indian Railways · 23 min · 13 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹5SL ₹1303A ₹4752A ₹665(est.)

                                    4:12 AMADHAndheri
                                  2. Change at Mumbai

                                    • Local transit: 35 min · Andheri (ADH) → Mumbai Ltt (LTT)
                                    • Safety buffer: 188 min (3 h 8 min) Total wait: 223 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Mumbai?

                                    Find a room near Mumbai Ltt
                                  3. 7:55 AMLTTMumbai Ltt

                                    Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                    Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                    Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                    Runs: Wed

                                    Indian Railways · 23 h 3 min · 1481 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹375SL ₹7053A ₹1,8152A ₹2,5501A ₹4,230(est.)

                                    10 stops — Show or hide intermediate stops
                                    1. 8:32 AMKYNKalyan Jn · 3 min halt
                                    2. 11:48 AMMMRManmad Jn · 2 min halt
                                    3. 2:10 PMBSLBhusaval Jn · 5 min halt
                                    4. 4:12 PMKNWKhandwa · 3 min halt
                                    5. 6:40 PMETItarsi Jn · 10 min halt
                                    6. 10:30 PMJBPJabalpur · 10 min halt
                                    7. 11:50 PMKTEKatni · 5 min halt
                                    8. 1:05 AMSTASatna · 5 min halt
                                    9. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                    10. 5:20 AMMZPMirzapur · 5 min halt
                                    6:58 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                  4. Change at Varanasi

                                    • Same station, no local travel
                                    • Safety buffer: 222 min (3 h 42 min) Total wait: 222 min
                                  5. 10:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                    Train18104Tatanagar Jallianwala Bagh Express

                                    Starts from Amritsar Jn (ASR) on Wed, 18 Nov at 12:45 (12:45 PM) · you board on day 2

                                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Tatanagar Jn (TATA) at Thu, 19 Nov 22:00

                                    Runs: Wed, Fri

                                    Indian Railways · 4 h 34 min · 283 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹80SL ₹1753A ₹4752A ₹665(est.)

                                    6 stops — Show or hide intermediate stops
                                    1. 11:20 AMBBUBhabua Road · 2 min halt
                                    2. 11:58 AMSSMSasaram · 2 min halt
                                    3. 12:13 PMDOSDehri ON Sone · 2 min halt
                                    4. 12:28 PMAUBRAnugraha N Road · 2 min halt
                                    5. 12:48 PMRFJRafiganj · 2 min halt
                                    6. 1:50 PMGAYAGaya Jn · 5 min halt
                                    3:14 PM+1 dayKQRKoderma
                                2. Option 3: 3:35 AM3:14 PM+1 day

                                  35 h 39 min2 changesSmallest buffer: 190 minfrom ₹475 (est.)

                                  via Mumbai · Varanasi

                                  1. 3:35 AMBVIBorivali

                                    Train22946Saurashtra Mail

                                    Starts from Okha (OKHA) on Tue, 17 Nov at 11:05 (11:05 AM) · you board on day 2

                                    This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Mumbai Central (MMCT) at Wed, 18 Nov 04:55

                                    Runs: Daily

                                    Indian Railways · 35 min · 24 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹20SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

                                    4:10 AMDDRDadar
                                  2. Change at Mumbai

                                    • Local transit: 35 min · Dadar (DDR) → Mumbai Ltt (LTT)
                                    • Safety buffer: 190 min (3 h 10 min) Total wait: 225 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Mumbai?

                                    Find a room near Mumbai Ltt
                                  3. 7:55 AMLTTMumbai Ltt

                                    Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                    Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                    Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                    Runs: Wed

                                    Indian Railways · 23 h 3 min · 1481 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹375SL ₹7053A ₹1,8152A ₹2,5501A ₹4,230(est.)

                                    10 stops — Show or hide intermediate stops
                                    1. 8:32 AMKYNKalyan Jn · 3 min halt
                                    2. 11:48 AMMMRManmad Jn · 2 min halt
                                    3. 2:10 PMBSLBhusaval Jn · 5 min halt
                                    4. 4:12 PMKNWKhandwa · 3 min halt
                                    5. 6:40 PMETItarsi Jn · 10 min halt
                                    6. 10:30 PMJBPJabalpur · 10 min halt
                                    7. 11:50 PMKTEKatni · 5 min halt
                                    8. 1:05 AMSTASatna · 5 min halt
                                    9. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                    10. 5:20 AMMZPMirzapur · 5 min halt
                                    6:58 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                  4. Change at Varanasi

                                    • Same station, no local travel
                                    • Safety buffer: 222 min (3 h 42 min) Total wait: 222 min
                                  5. 10:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                    Train18104Tatanagar Jallianwala Bagh Express

                                    Starts from Amritsar Jn (ASR) on Wed, 18 Nov at 12:45 (12:45 PM) · you board on day 2

                                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Tatanagar Jn (TATA) at Thu, 19 Nov 22:00

                                    Runs: Wed, Fri

                                    Indian Railways · 4 h 34 min · 283 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹80SL ₹1753A ₹4752A ₹665(est.)

                                    6 stops — Show or hide intermediate stops
                                    1. 11:20 AMBBUBhabua Road · 2 min halt
                                    2. 11:58 AMSSMSasaram · 2 min halt
                                    3. 12:13 PMDOSDehri ON Sone · 2 min halt
                                    4. 12:28 PMAUBRAnugraha N Road · 2 min halt
                                    5. 12:48 PMRFJRafiganj · 2 min halt
                                    6. 1:50 PMGAYAGaya Jn · 5 min halt
                                    3:14 PM+1 dayKQRKoderma
                                3. Option 4: 3:23 AM3:14 PM+1 day

                                  35 h 51 min2 changesSmallest buffer: 222 minfrom ₹465 (est.)

                                  via Mumbai · Varanasi

                                  1. 3:23 AMMLNDMulund

                                    Train51028Pandharpur-mumbai Fast Passenger

                                    Starts from Pandharpur (PVR) on Tue, 17 Nov at 17:55 (5:55 PM) · you board on day 2

                                    This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 04:10

                                    Runs: Daily · Running days not verified — check before booking

                                    Indian Railways · 15 min · 13 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹10(est.)

                                    5 stops — Show or hide intermediate stops
                                    1. 3:26 AMNHUNahur
                                    2. 3:27 AMBNDBhandup
                                    3. 3:30 AMKJMGKanjur Marg
                                    4. 3:32 AMVKVikhroli
                                    5. 3:36 AMGCGhatkopar
                                    3:38 AMVVHVidyavihar
                                  2. Change at Mumbai

                                    • Local transit: 15 min · Vidyavihar (VVH) → Mumbai Ltt (LTT)
                                    • Safety buffer: 242 min (4 h 2 min) Total wait: 257 min

                                    Night-time change — plan safe waiting and local transport

                                    Partner link

                                    Long wait at Mumbai?

                                    Find a room near Mumbai Ltt
                                  3. 7:55 AMLTTMumbai Ltt

                                    Train22554Mumbai Ltt - Raxaul Antyodaya Express

                                    Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 07:55 (7:55 AM) · you board on day 1

                                    Ends at Raxaul Jn (RXL) at Thu, 19 Nov 16:50

                                    Runs: Wed

                                    Indian Railways · 23 h 3 min · 1481 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹375SL ₹7053A ₹1,8152A ₹2,5501A ₹4,230(est.)

                                    10 stops — Show or hide intermediate stops
                                    1. 8:32 AMKYNKalyan Jn · 3 min halt
                                    2. 11:48 AMMMRManmad Jn · 2 min halt
                                    3. 2:10 PMBSLBhusaval Jn · 5 min halt
                                    4. 4:12 PMKNWKhandwa · 3 min halt
                                    5. 6:40 PMETItarsi Jn · 10 min halt
                                    6. 10:30 PMJBPJabalpur · 10 min halt
                                    7. 11:50 PMKTEKatni · 5 min halt
                                    8. 1:05 AMSTASatna · 5 min halt
                                    9. 4:15 AMPCOIPrayagraj Chheoki · 5 min halt
                                    10. 5:20 AMMZPMirzapur · 5 min halt
                                    6:58 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
                                  4. Change at Varanasi

                                    • Same station, no local travel
                                    • Safety buffer: 222 min (3 h 42 min) Total wait: 222 min
                                  5. 10:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                    Train18104Tatanagar Jallianwala Bagh Express

                                    Starts from Amritsar Jn (ASR) on Wed, 18 Nov at 12:45 (12:45 PM) · you board on day 2

                                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                    Ends at Tatanagar Jn (TATA) at Thu, 19 Nov 22:00

                                    Runs: Wed, Fri

                                    Indian Railways · 4 h 34 min · 283 km

                                    Scheduled timetable. From the published timetable. Delays are possible.

                                    GN ₹80SL ₹1753A ₹4752A ₹665(est.)

                                    6 stops — Show or hide intermediate stops
                                    1. 11:20 AMBBUBhabua Road · 2 min halt
                                    2. 11:58 AMSSMSasaram · 2 min halt
                                    3. 12:13 PMDOSDehri ON Sone · 2 min halt
                                    4. 12:28 PMAUBRAnugraha N Road · 2 min halt
                                    5. 12:48 PMRFJRafiganj · 2 min halt
                                    6. 1:50 PMGAYAGaya Jn · 5 min halt
                                    3:14 PM+1 dayKQRKoderma
                                Search another date

                                via Nashik · 3 routes · best 35 h 31 min

                                  All 3 combinations via Nashik
                                  1. Option 2: 10:53 AM10:24 PM+1 day

                                    35 h 31 min2 changesSmallest buffer: 245 minfrom ₹490 (est.)

                                    via Nashik · Prayagraj

                                    1. 10:53 AMTNAThane

                                      Train01143Danapur Special Fare Festival Special

                                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 10:30 (10:30 AM) · you board on day 1

                                      Ends at Danapur (DNR) at Thu, 19 Nov 21:50

                                      Runs: Daily

                                      Indian Railways · 2 h 34 min · 152 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹45SL ₹1303A ₹475(est.)

                                      1 stop — Show or hide intermediate stops
                                      1. 11:15 AMKYNKalyan Jn · 3 min halt
                                      1:27 PMNKNasik Road
                                    2. Change at Nashik

                                      • Same station, no local travel
                                      • Safety buffer: 277 min (4 h 37 min) Total wait: 277 min

                                      Partner link

                                      Long wait at Nashik?

                                      Find a room near Nasik Road
                                    3. 6:04 PMNKNasik Road

                                      Train12563Mumbai Ltt - Faizabad SF Express

                                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 1

                                      Ends at Ayodhya Cantt (AYC) at Thu, 19 Nov 17:40

                                      Runs: Daily · Running days not verified — check before booking

                                      Indian Railways · 17 h 36 min · 1168 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹310SL ₹5903A ₹1,5202A ₹2,1251A ₹3,530(est.)

                                      5 stops — Show or hide intermediate stops
                                      1. 8:38 PMJLJalgaon Jn · 2 min halt
                                      2. 1:20 AMETItarsi Jn · 10 min halt
                                      3. 6:00 AMKTEKatni · 5 min halt
                                      4. 7:30 AMSTASatna · 10 min halt
                                      5. 9:45 AMMKPManikpur Jn · 2 min halt
                                      11:40 AM+1 dayPRYJPrayagraj Jn
                                    4. Change at Prayagraj

                                      • Same station, no local travel
                                      • Safety buffer: 245 min (4 h 5 min) Total wait: 245 min

                                      Partner link

                                      Long wait at Prayagraj?

                                      Find a room near Prayagraj Jn
                                    5. 3:45 PM+1 dayPRYJPrayagraj Jn

                                      Train22308Howrah SF Express

                                      Starts from Bikaner Jn (BKN) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 2

                                      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 04:55

                                      Runs: Sun, Wed, Sat

                                      Indian Railways · 6 h 39 min · 436 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                                      7 stops — Show or hide intermediate stops
                                      1. 4:48 PMMZPMirzapur · 2 min halt
                                      2. 6:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                      3. 7:00 PMBBUBhabua Road · 2 min halt
                                      4. 7:30 PMSSMSasaram · 2 min halt
                                      5. 7:50 PMDOSDehri ON Sone · 2 min halt
                                      6. 8:08 PMAUBRAnugraha N Road · 2 min halt
                                      7. 9:10 PMGAYAGaya Jn · 5 min halt
                                      10:24 PM+1 dayKQRKoderma
                                  2. Option 3: 2:10 PM3:28 AM+2 days

                                    37 h 18 min2 changesSmallest buffer: 248 minfrom ₹435 (est.)

                                    via Nashik · Chalisgaon

                                    1. 2:10 PMTNAThane

                                      Train11071Kamayani Express

                                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 13:50 (1:50 PM) · you board on day 1

                                      Ends at Ballia (BUI) at Thu, 19 Nov 22:35

                                      Runs: Daily

                                      Indian Railways · 2 h 57 min · 152 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                                      2 stops — Show or hide intermediate stops
                                      1. 2:32 PMKYNKalyan Jn · 3 min halt
                                      2. 4:17 PMIGPIgatpuri · 5 min halt
                                      5:07 PMNKNasik Road
                                    2. Change at Nashik

                                      • Same station, no local travel
                                      • Safety buffer: 248 min (4 h 8 min) Total wait: 248 min

                                      Partner link

                                      Long wait at Nashik?

                                      Find a room near Nasik Road
                                    3. 9:15 PMNKNasik Road

                                      Train61129Nashik Road - Badnera MEMU

                                      Starts from Nasik Road (NK) on Wed, 18 Nov at 21:15 (9:15 PM) · you board on day 1

                                      Ends at Badnera Jn (BD) at Thu, 19 Nov 05:35

                                      Runs: Daily

                                      Indian Railways · 1 h 55 min · 140 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹20(est.)

                                      4 stops — Show or hide intermediate stops
                                      1. 9:38 PMNRNiphad · 2 min halt
                                      2. 9:53 PMLSLasalgaon · 2 min halt
                                      3. 10:18 PMMMRManmad Jn · 2 min halt
                                      4. 10:35 PMNGNNandgaon · 2 min halt
                                      11:10 PMCSNChalisgaon Jn
                                    4. Change at Chalisgaon

                                      • Same station, no local travel
                                      • Safety buffer: 265 min (4 h 25 min) Total wait: 265 min

                                      Night-time change — plan safe waiting and local transport

                                      Partner link

                                      Long wait at Chalisgaon?

                                      Find a room near Chalisgaon Jn
                                    5. 3:35 AM+1 dayCSNChalisgaon Jn

                                      Train12322Howrah Mail

                                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                      Runs: Daily

                                      Indian Railways · 23 h 53 min · 1456 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹370SL ₹6953A ₹1,7952A ₹2,5151A ₹4,175(est.)

                                      27 stops — Show or hide intermediate stops
                                      1. 4:48 AMJLJalgaon Jn · 2 min halt
                                      2. 5:20 AMBSLBhusaval Jn · 5 min halt
                                      3. 6:08 AMBAUBurhanpur · 2 min halt
                                      4. 7:23 AMKNWKhandwa · 2 min halt
                                      5. 8:30 AMHDHarda · 2 min halt
                                      6. 9:50 AMETItarsi Jn · 10 min halt
                                      7. 10:46 AMPPIPipariya · 2 min halt
                                      8. 11:20 AMGARGadarwara · 2 min halt
                                      9. 11:40 AMKYKareli · 2 min halt
                                      10. 11:54 AMNUNarsinghpur · 2 min halt
                                      11. 12:20 PMSRIDSridham · 2 min halt
                                      12. 1:20 PMJBPJabalpur · 10 min halt
                                      13. 2:35 PMKTEKatni · 5 min halt
                                      14. 3:28 PMMYRMaihar · 2 min halt
                                      15. 4:20 PMSTASatna · 5 min halt
                                      16. 5:50 PMMKPManikpur Jn · 2 min halt
                                      17. 6:43 PMSRJShankargarh · 1 min halt
                                      18. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                      19. 8:20 PMBDLVindhyachal · 2 min halt
                                      20. 8:35 PMMZPMirzapur · 5 min halt
                                      21. 9:13 PMCARChunar · 2 min halt
                                      22. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                      23. 11:36 PMBBUBhabua Road · 2 min halt
                                      24. 12:08 AMSSMSasaram · 2 min halt
                                      25. 12:24 AMDOSDehri ON Sone · 2 min halt
                                      26. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                      27. 2:05 AMGAYAGaya Jn · 5 min halt
                                      3:28 AM+2 daysKQRKoderma
                                  3. Option 4: 2:10 PM3:45 AM+2 days

                                    37 h 35 min2 changesSmallest buffer: 248 minfrom ₹440 (est.)

                                    via Nashik · Chalisgaon

                                    1. 2:10 PMTNAThane

                                      Train11071Kamayani Express

                                      Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 13:50 (1:50 PM) · you board on day 1

                                      Ends at Ballia (BUI) at Thu, 19 Nov 22:35

                                      Runs: Daily

                                      Indian Railways · 2 h 57 min · 152 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹45SL ₹1303A ₹4752A ₹665(est.)

                                      2 stops — Show or hide intermediate stops
                                      1. 2:32 PMKYNKalyan Jn · 3 min halt
                                      2. 4:17 PMIGPIgatpuri · 5 min halt
                                      5:07 PMNKNasik Road
                                    2. Change at Nashik

                                      • Same station, no local travel
                                      • Safety buffer: 248 min (4 h 8 min) Total wait: 248 min

                                      Partner link

                                      Long wait at Nashik?

                                      Find a room near Nasik Road
                                    3. 9:15 PMNKNasik Road

                                      Train61129Nashik Road - Badnera MEMU

                                      Starts from Nasik Road (NK) on Wed, 18 Nov at 21:15 (9:15 PM) · you board on day 1

                                      Ends at Badnera Jn (BD) at Thu, 19 Nov 05:35

                                      Runs: Daily

                                      Indian Railways · 1 h 55 min · 140 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹20(est.)

                                      4 stops — Show or hide intermediate stops
                                      1. 9:38 PMNRNiphad · 2 min halt
                                      2. 9:53 PMLSLasalgaon · 2 min halt
                                      3. 10:18 PMMMRManmad Jn · 2 min halt
                                      4. 10:35 PMNGNNandgaon · 2 min halt
                                      11:10 PMCSNChalisgaon Jn
                                    4. Change at Chalisgaon

                                      • Same station, no local travel
                                      • Safety buffer: 265 min (4 h 25 min) Total wait: 265 min

                                      Night-time change — plan safe waiting and local transport

                                      Partner link

                                      Long wait at Chalisgaon?

                                      Find a room near Chalisgaon Jn
                                    5. 3:35 AM+1 dayCSNChalisgaon Jn

                                      Train12322Howrah Mail

                                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                      Runs: Daily

                                      Indian Railways · 24 h 10 min · 1482 km

                                      Scheduled timetable. From the published timetable. Delays are possible.

                                      GN ₹375SL ₹7053A ₹1,8202A ₹2,5501A ₹4,235(est.)

                                      28 stops — Show or hide intermediate stops
                                      1. 4:48 AMJLJalgaon Jn · 2 min halt
                                      2. 5:20 AMBSLBhusaval Jn · 5 min halt
                                      3. 6:08 AMBAUBurhanpur · 2 min halt
                                      4. 7:23 AMKNWKhandwa · 2 min halt
                                      5. 8:30 AMHDHarda · 2 min halt
                                      6. 9:50 AMETItarsi Jn · 10 min halt
                                      7. 10:46 AMPPIPipariya · 2 min halt
                                      8. 11:20 AMGARGadarwara · 2 min halt
                                      9. 11:40 AMKYKareli · 2 min halt
                                      10. 11:54 AMNUNarsinghpur · 2 min halt
                                      11. 12:20 PMSRIDSridham · 2 min halt
                                      12. 1:20 PMJBPJabalpur · 10 min halt
                                      13. 2:35 PMKTEKatni · 5 min halt
                                      14. 3:28 PMMYRMaihar · 2 min halt
                                      15. 4:20 PMSTASatna · 5 min halt
                                      16. 5:50 PMMKPManikpur Jn · 2 min halt
                                      17. 6:43 PMSRJShankargarh · 1 min halt
                                      18. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                      19. 8:20 PMBDLVindhyachal · 2 min halt
                                      20. 8:35 PMMZPMirzapur · 5 min halt
                                      21. 9:13 PMCARChunar · 2 min halt
                                      22. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                      23. 11:36 PMBBUBhabua Road · 2 min halt
                                      24. 12:08 AMSSMSasaram · 2 min halt
                                      25. 12:24 AMDOSDehri ON Sone · 2 min halt
                                      26. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                      27. 2:05 AMGAYAGaya Jn · 5 min halt
                                      28. 3:28 AMKQRKoderma · 2 min halt
                                      3:45 AM+2 daysPSBParsabad

                                  via Nashik · 1 route · best 35 h 50 min

                                    All 1 combinations via Nashik
                                    1. Option 2: 8:00 AM7:50 PM+1 day

                                      35 h 50 min2 changesSmallest buffer: 185 minfrom ₹965 (est.)

                                      via Nashik · Varanasi

                                      • Nearby station
                                      1. 8:00 AMBhiwandi Bus Stand

                                        BusState RTC (estimated) Ordinary

                                        State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min

                                        Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

                                        Ordinary ₹150(est.)

                                        Buy at bus stand · every 60 min

                                        11:15 AMNashik Bus Stand
                                      2. Change at Nashik

                                        • Local transit: 35 min · Nashik Bus Stand → Nasik Road (NK)
                                        • Safety buffer: 185 min (3 h 5 min) Total wait: 220 min

                                        Station change — you must travel to a different station or bus stand

                                      3. 2:55 PMNKNasik Road

                                        Train11061Pawan Express

                                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 11:30 (11:30 AM) · you board on day 1

                                        Ends at Jaynagar (JYG) at Fri, 20 Nov 02:10

                                        Runs: Daily

                                        Indian Railways · 21 h 30 min · 1300 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        GN ₹320SL ₹6103A ₹1,6002A ₹2,260(est.)

                                        20 stops — Show or hide intermediate stops
                                        1. 4:00 PMMMRManmad Jn · 5 min halt
                                        2. 4:53 PMCSNChalisgaon Jn · 2 min halt
                                        3. 5:28 PMPCPachora Jn · 2 min halt
                                        4. 6:13 PMJLJalgaon Jn · 2 min halt
                                        5. 6:45 PMBSLBhusaval Jn · 5 min halt
                                        6. 7:38 PMBAUBurhanpur · 2 min halt
                                        7. 8:57 PMKNWKhandwa · 3 min halt
                                        8. 11:20 PMETItarsi Jn · 10 min halt
                                        9. 12:18 AMPPIPipariya · 2 min halt
                                        10. 1:18 AMNUNarsinghpur · 2 min halt
                                        11. 2:40 AMJBPJabalpur · 10 min halt
                                        12. 4:00 AMKTEKatni · 5 min halt
                                        13. 4:48 AMMYRMaihar · 2 min halt
                                        14. 5:25 AMSTASatna · 5 min halt
                                        15. 7:25 AMMKPManikpur Jn · 2 min halt
                                        16. 8:59 AMNYNNaini · 1 min halt
                                        17. 9:30 AMPRYJPrayagraj Jn · 25 min halt
                                        18. 10:10 AMPRRBPrayagraj Rambag · 2 min halt
                                        19. 11:08 AMGYNGyanpur Road · 2 min halt
                                        20. 11:53 AMBHLPBhulanpur · 1 min halt
                                        12:25 PM+1 dayBSBVaranasi Jn
                                      4. Change at Varanasi

                                        • Local transit: 60 min · Varanasi Jn (BSB) → Pt. Deen Dayal Upadhyaya Jn (DDU)
                                        • Safety buffer: 195 min (3 h 15 min) Total wait: 255 min

                                        Station change — you must travel to a different station or bus stand

                                        Partner link

                                        Long wait at Varanasi?

                                        Find a room near Pt. Deen Dayal Upadhyaya Jn
                                      5. 4:40 PM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

                                        Train20888Varanasi - Ranchi Vande Bharat Express

                                        Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 15:55 (3:55 PM) · you board on day 1

                                        Ends at Ranchi (RNC) at Thu, 19 Nov 23:55

                                        Runs: Sun, Mon, Wed, Thu, Fri, Sat

                                        Indian Railways · 3 h 10 min · 284 km

                                        Scheduled timetable. From the published timetable. Delays are possible.

                                        CC ₹495(est.)

                                        2 stops — Show or hide intermediate stops
                                        1. 5:40 PMSSMSasaram · 2 min halt
                                        2. 6:45 PMGAYAGaya Jn · 5 min halt
                                        7:50 PM+1 dayKQRKoderma

                                    via Karwi (Chitrakoot) · 2 routes · best 35 h 55 min

                                      All 2 combinations via Karwi (Chitrakoot)
                                      1. Option 2: 12:38 PM12:33 AM+2 days

                                        35 h 55 min1 changeSmallest buffer: 350 minfrom ₹465 (est.)

                                        via Karwi (Chitrakoot)

                                        1. 12:38 PMTNAThane

                                          Train01051Banaras Special Fare Festival Special

                                          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 12:15 (12:15 PM) · you board on day 1

                                          Ends at Banaras (BNRS) at Thu, 19 Nov 16:05

                                          Runs: Wed, Thu

                                          Indian Railways · 20 h 22 min · 1228 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹310SL ₹5803A ₹1,530(est.)

                                          13 stops — Show or hide intermediate stops
                                          1. 12:52 PMKYNKalyan Jn · 3 min halt
                                          2. 2:40 PMIGPIgatpuri · 5 min halt
                                          3. 3:12 PMNKNasik Road · 3 min halt
                                          4. 6:45 PMJLJalgaon Jn · 3 min halt
                                          5. 7:10 PMBSLBhusaval Jn · 5 min halt
                                          6. 8:57 PMKNWKhandwa · 3 min halt
                                          7. 11:56 PMETItarsi Jn · 5 min halt
                                          8. 12:50 AMPPIPipariya · 2 min halt
                                          9. 1:53 AMNUNarsinghpur · 2 min halt
                                          10. 3:20 AMMMLMadan Mahal · 5 min halt
                                          11. 4:40 AMKTEKatni · 10 min halt
                                          12. 6:38 AMMYRMaihar · 2 min halt
                                          13. 7:10 AMSTASatna · 5 min halt
                                          9:00 AM+1 dayMKPManikpur Jn
                                        2. Change at Karwi (Chitrakoot)

                                          • Same station, no local travel
                                          • Safety buffer: 350 min (5 h 50 min) Total wait: 350 min

                                          Partner link

                                          Long wait at Karwi (Chitrakoot)?

                                          Find a room near Manikpur Jn
                                        3. 2:50 PM+1 dayMKPManikpur Jn

                                          Train20976Chambal Express

                                          Starts from Agra Cantt (AGC) on Thu, 19 Nov at 05:45 (5:45 AM) · you board on day 1

                                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 06:55

                                          Runs: Thu

                                          Indian Railways · 9 h 43 min · 519 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹155SL ₹3153A ₹7852A ₹1,0801A ₹1,780(est.)

                                          9 stops — Show or hide intermediate stops
                                          1. 4:35 PMPCOIPrayagraj Chheoki · 5 min halt
                                          2. 5:47 PMBDLVindhyachal · 2 min halt
                                          3. 6:02 PMMZPMirzapur · 2 min halt
                                          4. 6:48 PMCARChunar · 2 min halt
                                          5. 8:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                          6. 8:56 PMBBUBhabua Road · 2 min halt
                                          7. 9:30 PMSSMSasaram · 2 min halt
                                          8. 9:48 PMDOSDehri ON Sone · 2 min halt
                                          9. 11:10 PMGAYAGaya Jn · 5 min halt
                                          12:33 AM+2 daysKQRKoderma
                                      2. Option 3: 12:38 PM3:28 AM+2 days

                                        38 h 50 min1 changeSmallest buffer: 532 minfrom ₹465 (est.)

                                        via Karwi (Chitrakoot)

                                        1. 12:38 PMTNAThane

                                          Train01051Banaras Special Fare Festival Special

                                          Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 12:15 (12:15 PM) · you board on day 1

                                          Ends at Banaras (BNRS) at Thu, 19 Nov 16:05

                                          Runs: Wed, Thu

                                          Indian Railways · 20 h 22 min · 1228 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹310SL ₹5803A ₹1,530(est.)

                                          13 stops — Show or hide intermediate stops
                                          1. 12:52 PMKYNKalyan Jn · 3 min halt
                                          2. 2:40 PMIGPIgatpuri · 5 min halt
                                          3. 3:12 PMNKNasik Road · 3 min halt
                                          4. 6:45 PMJLJalgaon Jn · 3 min halt
                                          5. 7:10 PMBSLBhusaval Jn · 5 min halt
                                          6. 8:57 PMKNWKhandwa · 3 min halt
                                          7. 11:56 PMETItarsi Jn · 5 min halt
                                          8. 12:50 AMPPIPipariya · 2 min halt
                                          9. 1:53 AMNUNarsinghpur · 2 min halt
                                          10. 3:20 AMMMLMadan Mahal · 5 min halt
                                          11. 4:40 AMKTEKatni · 10 min halt
                                          12. 6:38 AMMYRMaihar · 2 min halt
                                          13. 7:10 AMSTASatna · 5 min halt
                                          9:00 AM+1 dayMKPManikpur Jn
                                        2. Change at Karwi (Chitrakoot)

                                          • Same station, no local travel
                                          • Safety buffer: 532 min (8 h 52 min) Total wait: 532 min

                                          Partner link

                                          Long wait at Karwi (Chitrakoot)?

                                          Find a room near Manikpur Jn
                                        3. 5:52 PM+1 dayMKPManikpur Jn

                                          Train12322Howrah Mail

                                          Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                          This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                          Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                          Runs: Daily

                                          Indian Railways · 9 h 36 min · 520 km

                                          Scheduled timetable. From the published timetable. Delays are possible.

                                          GN ₹155SL ₹3153A ₹7852A ₹1,0851A ₹1,780(est.)

                                          11 stops — Show or hide intermediate stops
                                          1. 6:43 PMSRJShankargarh · 1 min halt
                                          2. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                          3. 8:20 PMBDLVindhyachal · 2 min halt
                                          4. 8:35 PMMZPMirzapur · 5 min halt
                                          5. 9:13 PMCARChunar · 2 min halt
                                          6. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                          7. 11:36 PMBBUBhabua Road · 2 min halt
                                          8. 12:08 AMSSMSasaram · 2 min halt
                                          9. 12:24 AMDOSDehri ON Sone · 2 min halt
                                          10. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                          11. 2:05 AMGAYAGaya Jn · 5 min halt
                                          3:28 AM+2 daysKQRKoderma

                                      via Igatpuri · 6 routes · best 35 h 58 min

                                        All 6 combinations via Igatpuri
                                        1. Option 2: 3:30 PM3:28 AM+2 days

                                          35 h 58 min2 changesSmallest buffer: 199 minfrom ₹470 (est.)

                                          via Igatpuri · Nashik

                                          1. 3:30 PMTNAThane

                                            Train12139Sewagram SF Express

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 14:55 (2:55 PM) · you board on day 1

                                            Ends at Nagpur (NGP) at Thu, 19 Nov 05:46

                                            Runs: Daily

                                            Indian Railways · 2 h 2 min · 102 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹45SL ₹1603A ₹5202A ₹710(est.)

                                            1 stop — Show or hide intermediate stops
                                            1. 3:52 PMKYNKalyan Jn · 3 min halt
                                            5:32 PMIGPIgatpuri
                                          2. Change at Igatpuri

                                            • Same station, no local travel
                                            • Safety buffer: 199 min (3 h 19 min) Total wait: 199 min
                                          3. 8:51 PMIGPIgatpuri

                                            Train12109Panchavati Express

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 1

                                            Ends at Manmad Jn (MMR) at Wed, 18 Nov 22:50

                                            Runs: Daily

                                            Indian Railways · 32 min · 45 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹30CC ₹145(est.)

                                            9:23 PMDVLDevlali
                                          4. Change at Nashik

                                            • Local transit: 30 min · Devlali (DVL) → Nasik Road (NK)
                                            • Safety buffer: 227 min (3 h 47 min) Total wait: 257 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Nashik?

                                            Find a room near Nasik Road
                                          5. 1:40 AM+1 dayNKNasik Road

                                            Train12322Howrah Mail

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                            Runs: Daily

                                            Indian Railways · 25 h 48 min · 1596 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹395SL ₹7453A ₹1,9252A ₹2,7051A ₹4,490(est.)

                                            29 stops — Show or hide intermediate stops
                                            1. 2:37 AMMMRManmad Jn · 3 min halt
                                            2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                            3. 4:48 AMJLJalgaon Jn · 2 min halt
                                            4. 5:20 AMBSLBhusaval Jn · 5 min halt
                                            5. 6:08 AMBAUBurhanpur · 2 min halt
                                            6. 7:23 AMKNWKhandwa · 2 min halt
                                            7. 8:30 AMHDHarda · 2 min halt
                                            8. 9:50 AMETItarsi Jn · 10 min halt
                                            9. 10:46 AMPPIPipariya · 2 min halt
                                            10. 11:20 AMGARGadarwara · 2 min halt
                                            11. 11:40 AMKYKareli · 2 min halt
                                            12. 11:54 AMNUNarsinghpur · 2 min halt
                                            13. 12:20 PMSRIDSridham · 2 min halt
                                            14. 1:20 PMJBPJabalpur · 10 min halt
                                            15. 2:35 PMKTEKatni · 5 min halt
                                            16. 3:28 PMMYRMaihar · 2 min halt
                                            17. 4:20 PMSTASatna · 5 min halt
                                            18. 5:50 PMMKPManikpur Jn · 2 min halt
                                            19. 6:43 PMSRJShankargarh · 1 min halt
                                            20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                            21. 8:20 PMBDLVindhyachal · 2 min halt
                                            22. 8:35 PMMZPMirzapur · 5 min halt
                                            23. 9:13 PMCARChunar · 2 min halt
                                            24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                            25. 11:36 PMBBUBhabua Road · 2 min halt
                                            26. 12:08 AMSSMSasaram · 2 min halt
                                            27. 12:24 AMDOSDehri ON Sone · 2 min halt
                                            28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                            29. 2:05 AMGAYAGaya Jn · 5 min halt
                                            3:28 AM+2 daysKQRKoderma
                                        2. Option 3: 3:25 PM3:28 AM+2 days

                                          36 h 3 min2 changesSmallest buffer: 213 minfrom ₹470 (est.)

                                          via Igatpuri · Nashik

                                          1. 3:25 PMTNAThane

                                            Train12117Mumbai Ltt- Manmad Express

                                            Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 15:00 (3:00 PM) · you board on day 1

                                            Ends at Manmad Jn (MMR) at Wed, 18 Nov 19:25

                                            Runs: Daily · Running days not verified — check before booking

                                            Indian Railways · 1 h 53 min · 98 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹45CC ₹205(est.)

                                            2 stops — Show or hide intermediate stops
                                            1. 3:40 PMKYNKalyan Jn · 3 min halt
                                            2. 4:46 PMKSRAKasara · 2 min halt
                                            5:18 PMIGPIgatpuri
                                          2. Change at Igatpuri

                                            • Same station, no local travel
                                            • Safety buffer: 213 min (3 h 33 min) Total wait: 213 min
                                          3. 8:51 PMIGPIgatpuri

                                            Train12109Panchavati Express

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 1

                                            Ends at Manmad Jn (MMR) at Wed, 18 Nov 22:50

                                            Runs: Daily

                                            Indian Railways · 32 min · 45 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹30CC ₹145(est.)

                                            9:23 PMDVLDevlali
                                          4. Change at Nashik

                                            • Local transit: 30 min · Devlali (DVL) → Nasik Road (NK)
                                            • Safety buffer: 227 min (3 h 47 min) Total wait: 257 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Nashik?

                                            Find a room near Nasik Road
                                          5. 1:40 AM+1 dayNKNasik Road

                                            Train12322Howrah Mail

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                            Runs: Daily

                                            Indian Railways · 25 h 48 min · 1596 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹395SL ₹7453A ₹1,9252A ₹2,7051A ₹4,490(est.)

                                            29 stops — Show or hide intermediate stops
                                            1. 2:37 AMMMRManmad Jn · 3 min halt
                                            2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                            3. 4:48 AMJLJalgaon Jn · 2 min halt
                                            4. 5:20 AMBSLBhusaval Jn · 5 min halt
                                            5. 6:08 AMBAUBurhanpur · 2 min halt
                                            6. 7:23 AMKNWKhandwa · 2 min halt
                                            7. 8:30 AMHDHarda · 2 min halt
                                            8. 9:50 AMETItarsi Jn · 10 min halt
                                            9. 10:46 AMPPIPipariya · 2 min halt
                                            10. 11:20 AMGARGadarwara · 2 min halt
                                            11. 11:40 AMKYKareli · 2 min halt
                                            12. 11:54 AMNUNarsinghpur · 2 min halt
                                            13. 12:20 PMSRIDSridham · 2 min halt
                                            14. 1:20 PMJBPJabalpur · 10 min halt
                                            15. 2:35 PMKTEKatni · 5 min halt
                                            16. 3:28 PMMYRMaihar · 2 min halt
                                            17. 4:20 PMSTASatna · 5 min halt
                                            18. 5:50 PMMKPManikpur Jn · 2 min halt
                                            19. 6:43 PMSRJShankargarh · 1 min halt
                                            20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                            21. 8:20 PMBDLVindhyachal · 2 min halt
                                            22. 8:35 PMMZPMirzapur · 5 min halt
                                            23. 9:13 PMCARChunar · 2 min halt
                                            24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                            25. 11:36 PMBBUBhabua Road · 2 min halt
                                            26. 12:08 AMSSMSasaram · 2 min halt
                                            27. 12:24 AMDOSDehri ON Sone · 2 min halt
                                            28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                            29. 2:05 AMGAYAGaya Jn · 5 min halt
                                            3:28 AM+2 daysKQRKoderma
                                        3. Option 4: 3:30 PM3:45 AM+2 days

                                          36 h 15 min2 changesSmallest buffer: 199 minfrom ₹475 (est.)

                                          via Igatpuri · Nashik

                                          1. 3:30 PMTNAThane

                                            Train12139Sewagram SF Express

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 14:55 (2:55 PM) · you board on day 1

                                            Ends at Nagpur (NGP) at Thu, 19 Nov 05:46

                                            Runs: Daily

                                            Indian Railways · 2 h 2 min · 102 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹45SL ₹1603A ₹5202A ₹710(est.)

                                            1 stop — Show or hide intermediate stops
                                            1. 3:52 PMKYNKalyan Jn · 3 min halt
                                            5:32 PMIGPIgatpuri
                                          2. Change at Igatpuri

                                            • Same station, no local travel
                                            • Safety buffer: 199 min (3 h 19 min) Total wait: 199 min
                                          3. 8:51 PMIGPIgatpuri

                                            Train12109Panchavati Express

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 18:15 (6:15 PM) · you board on day 1

                                            Ends at Manmad Jn (MMR) at Wed, 18 Nov 22:50

                                            Runs: Daily

                                            Indian Railways · 32 min · 45 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹30CC ₹145(est.)

                                            9:23 PMDVLDevlali
                                          4. Change at Nashik

                                            • Local transit: 30 min · Devlali (DVL) → Nasik Road (NK)
                                            • Safety buffer: 227 min (3 h 47 min) Total wait: 257 min

                                            Night-time change — plan safe waiting and local transport

                                            Partner link

                                            Long wait at Nashik?

                                            Find a room near Nasik Road
                                          5. 1:40 AM+1 dayNKNasik Road

                                            Train12322Howrah Mail

                                            Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                            This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                            Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                            Runs: Daily

                                            Indian Railways · 26 h 5 min · 1622 km

                                            Scheduled timetable. From the published timetable. Delays are possible.

                                            GN ₹400SL ₹7553A ₹1,9502A ₹2,7401A ₹4,550(est.)

                                            30 stops — Show or hide intermediate stops
                                            1. 2:37 AMMMRManmad Jn · 3 min halt
                                            2. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                            3. 4:48 AMJLJalgaon Jn · 2 min halt
                                            4. 5:20 AMBSLBhusaval Jn · 5 min halt
                                            5. 6:08 AMBAUBurhanpur · 2 min halt
                                            6. 7:23 AMKNWKhandwa · 2 min halt
                                            7. 8:30 AMHDHarda · 2 min halt
                                            8. 9:50 AMETItarsi Jn · 10 min halt
                                            9. 10:46 AMPPIPipariya · 2 min halt
                                            10. 11:20 AMGARGadarwara · 2 min halt
                                            11. 11:40 AMKYKareli · 2 min halt
                                            12. 11:54 AMNUNarsinghpur · 2 min halt
                                            13. 12:20 PMSRIDSridham · 2 min halt
                                            14. 1:20 PMJBPJabalpur · 10 min halt
                                            15. 2:35 PMKTEKatni · 5 min halt
                                            16. 3:28 PMMYRMaihar · 2 min halt
                                            17. 4:20 PMSTASatna · 5 min halt
                                            18. 5:50 PMMKPManikpur Jn · 2 min halt
                                            19. 6:43 PMSRJShankargarh · 1 min halt
                                            20. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                            21. 8:20 PMBDLVindhyachal · 2 min halt
                                            22. 8:35 PMMZPMirzapur · 5 min halt
                                            23. 9:13 PMCARChunar · 2 min halt
                                            24. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                            25. 11:36 PMBBUBhabua Road · 2 min halt
                                            26. 12:08 AMSSMSasaram · 2 min halt
                                            27. 12:24 AMDOSDehri ON Sone · 2 min halt
                                            28. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                            29. 2:05 AMGAYAGaya Jn · 5 min halt
                                            30. 3:28 AMKQRKoderma · 2 min halt
                                            3:45 AM+2 daysPSBParsabad
                                        Search another date

                                        via Jamshedpur · 2 routes · best 36 h 8 min

                                          All 2 combinations via Jamshedpur
                                          1. Option 2: 9:45 PM9:53 AM+2 days

                                            36 h 8 min1 changeSmallest buffer: 220 minfrom ₹905 (est.)

                                            via Jamshedpur

                                            1. 9:45 PMTNAThane

                                              Train12809Howrah Mail

                                              Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 21:10 (9:10 PM) · you board on day 1

                                              Ends at Howrah Jn (HWH) at Fri, 20 Nov 06:45

                                              Runs: Daily

                                              Indian Railways · 28 h · 1684 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹415SL ₹7753A ₹2,0102A ₹2,8251A ₹4,690(est.)

                                              38 stops — Show or hide intermediate stops
                                              1. 10:07 PMKYNKalyan Jn · 3 min halt
                                              2. 11:12 PMKSRAKasara · 3 min halt
                                              3. 11:42 PMIGPIgatpuri · 5 min halt
                                              4. 12:19 AMDVLDevlali · 1 min halt
                                              5. 12:27 AMNKNasik Road · 3 min halt
                                              6. 1:27 AMMMRManmad Jn · 3 min halt
                                              7. 2:20 AMCSNChalisgaon Jn · 2 min halt
                                              8. 3:20 AMJLJalgaon Jn · 2 min halt
                                              9. 4:05 AMBSLBhusaval Jn · 5 min halt
                                              10. 4:50 AMMKUMalkapur · 2 min halt
                                              11. 5:15 AMNNNandura · 2 min halt
                                              12. 5:29 AMJMJalamb Jn · 1 min halt
                                              13. 5:40 AMSEGShegaon · 2 min halt
                                              14. 6:20 AMAKAkola Jn · 5 min halt
                                              15. 6:58 AMMZRMurtajapur · 2 min halt
                                              16. 8:10 AMBDBadnera Jn · 5 min halt
                                              17. 8:43 AMDMNDhamangaon · 2 min halt
                                              18. 9:04 AMPLOPulgaon Jn · 1 min halt
                                              19. 9:28 AMWRWardha Jn · 2 min halt
                                              20. 11:15 AMNGPNagpur · 5 min halt
                                              21. 12:08 PMBRDBhandara Road · 2 min halt
                                              22. 12:28 PMTMRTumsar Road · 2 min halt
                                              23. 1:10 PMGGondia Jn · 5 min halt
                                              24. 2:18 PMDGGDongargarh · 2 min halt
                                              25. 2:43 PMRJNRajnandgaon · 2 min halt
                                              26. 3:25 PMDURGDurg · 5 min halt
                                              27. 4:05 PMRRaipur Jn · 10 min halt
                                              28. 5:10 PMBYTBhatapara · 2 min halt
                                              29. 6:10 PMBSPBilaspur Jn · 15 min halt
                                              30. 7:13 PMCPHChampa · 2 min halt
                                              31. 7:35 PMSKTSakti · 2 min halt
                                              32. 7:53 PMKHSKharsia · 2 min halt
                                              33. 8:25 PMRIGRaigarh · 5 min halt
                                              34. 9:05 PMBPHBelpahar · 2 min halt
                                              35. 9:18 PMBRJNBrajrajnagar · 2 min halt
                                              36. 9:50 PMJSGJharsuguda Jn · 5 min halt
                                              37. 11:10 PMROURourkela · 8 min halt
                                              38. 12:48 AMCKPChakaradharpur · 7 min halt
                                              1:45 AM+2 daysTATATatanagar Jn
                                            2. Change at Jamshedpur

                                              • Same station, no local travel
                                              • Safety buffer: 220 min (3 h 40 min) Total wait: 220 min

                                              Night-time change — plan safe waiting and local transport

                                              Partner link

                                              Long wait at Jamshedpur?

                                              Find a room near Tatanagar Jn
                                            3. 5:25 AM+2 daysTATATatanagar Jn

                                              Train20893Tatanagar - Patna Vande Bharat Express

                                              Starts from Tatanagar Jn (TATA) on Fri, 20 Nov at 05:25 (5:25 AM) · you board on day 1

                                              Ends at Patna Jn (PNBE) at Fri, 20 Nov 12:45

                                              Runs: Wed, Thu, Fri, Sat

                                              Indian Railways · 4 h 28 min · 281 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              CC ₹490EC ₹945(est.)

                                              5 stops — Show or hide intermediate stops
                                              1. 6:08 AMCNIChandil Jn · 2 min halt
                                              2. 7:08 AMMURIMuri · 2 min halt
                                              3. 7:58 AMBKSCBokaro Steel City · 2 min halt
                                              4. 8:53 AMGMONsc Bose J Gomo · 2 min halt
                                              5. 9:05 AMPNMEParasnath · 2 min halt
                                              9:53 AM+2 daysKQRKoderma
                                          2. Option 3: 9:45 PM12:00 PM+2 days

                                            38 h 15 min1 changeSmallest buffer: 277 minfrom ₹510 (est.)

                                            via Jamshedpur

                                            1. 9:45 PMTNAThane

                                              Train12809Howrah Mail

                                              Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 21:10 (9:10 PM) · you board on day 1

                                              Ends at Howrah Jn (HWH) at Fri, 20 Nov 06:45

                                              Runs: Daily

                                              Indian Railways · 28 h · 1684 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹415SL ₹7753A ₹2,0102A ₹2,8251A ₹4,690(est.)

                                              38 stops — Show or hide intermediate stops
                                              1. 10:07 PMKYNKalyan Jn · 3 min halt
                                              2. 11:12 PMKSRAKasara · 3 min halt
                                              3. 11:42 PMIGPIgatpuri · 5 min halt
                                              4. 12:19 AMDVLDevlali · 1 min halt
                                              5. 12:27 AMNKNasik Road · 3 min halt
                                              6. 1:27 AMMMRManmad Jn · 3 min halt
                                              7. 2:20 AMCSNChalisgaon Jn · 2 min halt
                                              8. 3:20 AMJLJalgaon Jn · 2 min halt
                                              9. 4:05 AMBSLBhusaval Jn · 5 min halt
                                              10. 4:50 AMMKUMalkapur · 2 min halt
                                              11. 5:15 AMNNNandura · 2 min halt
                                              12. 5:29 AMJMJalamb Jn · 1 min halt
                                              13. 5:40 AMSEGShegaon · 2 min halt
                                              14. 6:20 AMAKAkola Jn · 5 min halt
                                              15. 6:58 AMMZRMurtajapur · 2 min halt
                                              16. 8:10 AMBDBadnera Jn · 5 min halt
                                              17. 8:43 AMDMNDhamangaon · 2 min halt
                                              18. 9:04 AMPLOPulgaon Jn · 1 min halt
                                              19. 9:28 AMWRWardha Jn · 2 min halt
                                              20. 11:15 AMNGPNagpur · 5 min halt
                                              21. 12:08 PMBRDBhandara Road · 2 min halt
                                              22. 12:28 PMTMRTumsar Road · 2 min halt
                                              23. 1:10 PMGGondia Jn · 5 min halt
                                              24. 2:18 PMDGGDongargarh · 2 min halt
                                              25. 2:43 PMRJNRajnandgaon · 2 min halt
                                              26. 3:25 PMDURGDurg · 5 min halt
                                              27. 4:05 PMRRaipur Jn · 10 min halt
                                              28. 5:10 PMBYTBhatapara · 2 min halt
                                              29. 6:10 PMBSPBilaspur Jn · 15 min halt
                                              30. 7:13 PMCPHChampa · 2 min halt
                                              31. 7:35 PMSKTSakti · 2 min halt
                                              32. 7:53 PMKHSKharsia · 2 min halt
                                              33. 8:25 PMRIGRaigarh · 5 min halt
                                              34. 9:05 PMBPHBelpahar · 2 min halt
                                              35. 9:18 PMBRJNBrajrajnagar · 2 min halt
                                              36. 9:50 PMJSGJharsuguda Jn · 5 min halt
                                              37. 11:10 PMROURourkela · 8 min halt
                                              38. 12:48 AMCKPChakaradharpur · 7 min halt
                                              1:45 AM+2 daysTATATatanagar Jn
                                            2. Change at Jamshedpur

                                              • Same station, no local travel
                                              • Safety buffer: 277 min (4 h 37 min) Total wait: 277 min

                                              Night-time change — plan safe waiting and local transport

                                              Partner link

                                              Long wait at Jamshedpur?

                                              Find a room near Tatanagar Jn
                                            3. 6:22 AM+2 daysTATATatanagar Jn

                                              Train12801Purushottam Express

                                              Starts from Puri (PURI) on Thu, 19 Nov at 21:55 (9:55 PM) · you board on day 2

                                              This train starts on Thu, 19 Nov, but you board on Fri, 20 Nov. Booking sites may ask for either date — check which one before you pay.

                                              Ends at Anand Vihar Terminal (ANVT) at Sat, 21 Nov 03:50

                                              Runs: Daily

                                              Indian Railways · 5 h 38 min · 276 km

                                              Scheduled timetable. From the published timetable. Delays are possible.

                                              GN ₹95SL ₹2003A ₹5202A ₹7101A ₹1,155(est.)

                                              8 stops — Show or hide intermediate stops
                                              1. 7:23 AMCNIChandil Jn · 2 min halt
                                              2. 7:44 AMBBMBarabhum · 1 min halt
                                              3. 8:18 AMPRRPurulia Jn · 2 min halt
                                              4. 9:40 AMBKSCBokaro Steel City · 5 min halt
                                              5. 10:26 AMCRPChandrapura · 2 min halt
                                              6. 10:50 AMGMONsc Bose J Gomo · 5 min halt
                                              7. 11:08 AMPNMEParasnath · 2 min halt
                                              8. 11:30 AMHZDHazaribagh Road · 2 min halt
                                              12:00 PM+2 daysKQRKoderma

                                          via Vasai-Virar · 3 routes · best 36 h 27 min

                                            All 3 combinations via Vasai-Virar
                                            1. Option 2: 3:01 PM3:28 AM+2 days

                                              36 h 27 min2 changesSmallest buffer: 180 minfrom ₹445 (est.)

                                              via Vasai-Virar · Kalyan

                                              1. 3:01 PMKHBVKharbao

                                                Train61006Diva - Vasai Road Local

                                                Starts from Diva (DIVA) on Wed, 18 Nov at 14:33 (2:33 PM) · you board on day 1

                                                Ends at Vasai Road (BSR) at Wed, 18 Nov 15:25

                                                Runs: Daily

                                                Indian Railways · 24 min · 19 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10(est.)

                                                2 stops — Show or hide intermediate stops
                                                1. 3:08 PMKARDKaman Road · 1 min halt
                                                2. 3:15 PMJCNRJuchandra · 1 min halt
                                                3:25 PMBSRVasai Road
                                              2. Change at Vasai-Virar

                                                • Same station, no local travel
                                                • Safety buffer: 180 min (3 h) Total wait: 180 min
                                              3. 6:25 PMBSRVasai Road

                                                Train17203Bhavnagar(t)-kakinada Town Express

                                                Starts from Bhavnagar Terminus (BVC) on Wed, 18 Nov at 04:10 (4:10 AM) · you board on day 1

                                                Ends at Kakinada Town (CCT) at Thu, 19 Nov 21:00

                                                Runs: Daily · Running days not verified — check before booking

                                                Indian Railways · 1 h 15 min · 41 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10SL ₹1303A ₹4752A ₹665(est.)

                                                7:40 PMKYNKalyan Jn
                                              4. Change at Kalyan

                                                • Same station, no local travel
                                                • Safety buffer: 215 min (3 h 35 min) Total wait: 215 min
                                              5. 11:15 PMKYNKalyan Jn

                                                Train12322Howrah Mail

                                                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

                                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                Runs: Daily

                                                Indian Railways · 28 h 13 min · 1728 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹425SL ₹7903A ₹2,0502A ₹2,8851A ₹4,790(est.)

                                                31 stops — Show or hide intermediate stops
                                                1. 12:17 AMKSRAKasara · 3 min halt
                                                2. 1:35 AMNKNasik Road · 5 min halt
                                                3. 2:37 AMMMRManmad Jn · 3 min halt
                                                4. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                5. 4:48 AMJLJalgaon Jn · 2 min halt
                                                6. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                7. 6:08 AMBAUBurhanpur · 2 min halt
                                                8. 7:23 AMKNWKhandwa · 2 min halt
                                                9. 8:30 AMHDHarda · 2 min halt
                                                10. 9:50 AMETItarsi Jn · 10 min halt
                                                11. 10:46 AMPPIPipariya · 2 min halt
                                                12. 11:20 AMGARGadarwara · 2 min halt
                                                13. 11:40 AMKYKareli · 2 min halt
                                                14. 11:54 AMNUNarsinghpur · 2 min halt
                                                15. 12:20 PMSRIDSridham · 2 min halt
                                                16. 1:20 PMJBPJabalpur · 10 min halt
                                                17. 2:35 PMKTEKatni · 5 min halt
                                                18. 3:28 PMMYRMaihar · 2 min halt
                                                19. 4:20 PMSTASatna · 5 min halt
                                                20. 5:50 PMMKPManikpur Jn · 2 min halt
                                                21. 6:43 PMSRJShankargarh · 1 min halt
                                                22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                23. 8:20 PMBDLVindhyachal · 2 min halt
                                                24. 8:35 PMMZPMirzapur · 5 min halt
                                                25. 9:13 PMCARChunar · 2 min halt
                                                26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                27. 11:36 PMBBUBhabua Road · 2 min halt
                                                28. 12:08 AMSSMSasaram · 2 min halt
                                                29. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                30. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                31. 2:05 AMGAYAGaya Jn · 5 min halt
                                                3:28 AM+2 daysKQRKoderma
                                            2. Option 3: 3:01 PM3:45 AM+2 days

                                              36 h 44 min2 changesSmallest buffer: 180 minfrom ₹450 (est.)

                                              via Vasai-Virar · Kalyan

                                              1. 3:01 PMKHBVKharbao

                                                Train61006Diva - Vasai Road Local

                                                Starts from Diva (DIVA) on Wed, 18 Nov at 14:33 (2:33 PM) · you board on day 1

                                                Ends at Vasai Road (BSR) at Wed, 18 Nov 15:25

                                                Runs: Daily

                                                Indian Railways · 24 min · 19 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10(est.)

                                                2 stops — Show or hide intermediate stops
                                                1. 3:08 PMKARDKaman Road · 1 min halt
                                                2. 3:15 PMJCNRJuchandra · 1 min halt
                                                3:25 PMBSRVasai Road
                                              2. Change at Vasai-Virar

                                                • Same station, no local travel
                                                • Safety buffer: 180 min (3 h) Total wait: 180 min
                                              3. 6:25 PMBSRVasai Road

                                                Train17203Bhavnagar(t)-kakinada Town Express

                                                Starts from Bhavnagar Terminus (BVC) on Wed, 18 Nov at 04:10 (4:10 AM) · you board on day 1

                                                Ends at Kakinada Town (CCT) at Thu, 19 Nov 21:00

                                                Runs: Daily · Running days not verified — check before booking

                                                Indian Railways · 1 h 15 min · 41 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10SL ₹1303A ₹4752A ₹665(est.)

                                                7:40 PMKYNKalyan Jn
                                              4. Change at Kalyan

                                                • Same station, no local travel
                                                • Safety buffer: 215 min (3 h 35 min) Total wait: 215 min
                                              5. 11:15 PMKYNKalyan Jn

                                                Train12322Howrah Mail

                                                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

                                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                Runs: Daily

                                                Indian Railways · 28 h 30 min · 1754 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹430SL ₹8003A ₹2,0752A ₹2,9201A ₹4,845(est.)

                                                32 stops — Show or hide intermediate stops
                                                1. 12:17 AMKSRAKasara · 3 min halt
                                                2. 1:35 AMNKNasik Road · 5 min halt
                                                3. 2:37 AMMMRManmad Jn · 3 min halt
                                                4. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                5. 4:48 AMJLJalgaon Jn · 2 min halt
                                                6. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                7. 6:08 AMBAUBurhanpur · 2 min halt
                                                8. 7:23 AMKNWKhandwa · 2 min halt
                                                9. 8:30 AMHDHarda · 2 min halt
                                                10. 9:50 AMETItarsi Jn · 10 min halt
                                                11. 10:46 AMPPIPipariya · 2 min halt
                                                12. 11:20 AMGARGadarwara · 2 min halt
                                                13. 11:40 AMKYKareli · 2 min halt
                                                14. 11:54 AMNUNarsinghpur · 2 min halt
                                                15. 12:20 PMSRIDSridham · 2 min halt
                                                16. 1:20 PMJBPJabalpur · 10 min halt
                                                17. 2:35 PMKTEKatni · 5 min halt
                                                18. 3:28 PMMYRMaihar · 2 min halt
                                                19. 4:20 PMSTASatna · 5 min halt
                                                20. 5:50 PMMKPManikpur Jn · 2 min halt
                                                21. 6:43 PMSRJShankargarh · 1 min halt
                                                22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                23. 8:20 PMBDLVindhyachal · 2 min halt
                                                24. 8:35 PMMZPMirzapur · 5 min halt
                                                25. 9:13 PMCARChunar · 2 min halt
                                                26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                27. 11:36 PMBBUBhabua Road · 2 min halt
                                                28. 12:08 AMSSMSasaram · 2 min halt
                                                29. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                30. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                31. 2:05 AMGAYAGaya Jn · 5 min halt
                                                32. 3:28 AMKQRKoderma · 2 min halt
                                                3:45 AM+2 daysPSBParsabad
                                            3. Option 4: 1:40 PM3:28 AM+2 days

                                              37 h 48 min2 changesSmallest buffer: 227 minfrom ₹440 (est.)

                                              via Vasai-Virar · Kalyan

                                              1. 1:40 PMBVIBorivali

                                                Train19417Borivali - Vatva Express

                                                Starts from Borivali (BVI) on Wed, 18 Nov at 13:40 (1:40 PM) · you board on day 1

                                                Ends at Vatva (VTA) at Thu, 19 Nov 02:45

                                                Runs: Daily

                                                Indian Railways · 8 min · 18 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹5SL ₹130(est.)

                                                1:48 PMBSRVasai Road
                                              2. Change at Vasai-Virar

                                                • Same station, no local travel
                                                • Safety buffer: 227 min (3 h 47 min) Total wait: 227 min
                                              3. 5:35 PMBSRVasai Road

                                                Train61021Vasai Road - Diva Local

                                                Starts from Vasai Road (BSR) on Wed, 18 Nov at 17:35 (5:35 PM) · you board on day 1

                                                Ends at Diva (DIVA) at Wed, 18 Nov 18:35

                                                Runs: Daily

                                                Indian Railways · 42 min · 35 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹10(est.)

                                                4 stops — Show or hide intermediate stops
                                                1. 5:42 PMJCNRJuchandra · 1 min halt
                                                2. 5:48 PMKARDKaman Road · 1 min halt
                                                3. 5:56 PMKHBVKharbao · 1 min halt
                                                4. 6:05 PMBIRDBhivandi Road · 1 min halt
                                                6:17 PMKOPRKopar
                                              4. Change at Kalyan

                                                • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                                • Safety buffer: 268 min (4 h 28 min) Total wait: 298 min

                                                Station change — you must travel to a different station or bus stand

                                                Partner link

                                                Long wait at Kalyan?

                                                Find a room near Kalyan Jn
                                              5. 11:15 PMKYNKalyan Jn

                                                Train12322Howrah Mail

                                                Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

                                                Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                Runs: Daily

                                                Indian Railways · 28 h 13 min · 1728 km

                                                Scheduled timetable. From the published timetable. Delays are possible.

                                                GN ₹425SL ₹7903A ₹2,0502A ₹2,8851A ₹4,790(est.)

                                                31 stops — Show or hide intermediate stops
                                                1. 12:17 AMKSRAKasara · 3 min halt
                                                2. 1:35 AMNKNasik Road · 5 min halt
                                                3. 2:37 AMMMRManmad Jn · 3 min halt
                                                4. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                5. 4:48 AMJLJalgaon Jn · 2 min halt
                                                6. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                7. 6:08 AMBAUBurhanpur · 2 min halt
                                                8. 7:23 AMKNWKhandwa · 2 min halt
                                                9. 8:30 AMHDHarda · 2 min halt
                                                10. 9:50 AMETItarsi Jn · 10 min halt
                                                11. 10:46 AMPPIPipariya · 2 min halt
                                                12. 11:20 AMGARGadarwara · 2 min halt
                                                13. 11:40 AMKYKareli · 2 min halt
                                                14. 11:54 AMNUNarsinghpur · 2 min halt
                                                15. 12:20 PMSRIDSridham · 2 min halt
                                                16. 1:20 PMJBPJabalpur · 10 min halt
                                                17. 2:35 PMKTEKatni · 5 min halt
                                                18. 3:28 PMMYRMaihar · 2 min halt
                                                19. 4:20 PMSTASatna · 5 min halt
                                                20. 5:50 PMMKPManikpur Jn · 2 min halt
                                                21. 6:43 PMSRJShankargarh · 1 min halt
                                                22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                23. 8:20 PMBDLVindhyachal · 2 min halt
                                                24. 8:35 PMMZPMirzapur · 5 min halt
                                                25. 9:13 PMCARChunar · 2 min halt
                                                26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                27. 11:36 PMBBUBhabua Road · 2 min halt
                                                28. 12:08 AMSSMSasaram · 2 min halt
                                                29. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                30. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                31. 2:05 AMGAYAGaya Jn · 5 min halt
                                                3:28 AM+2 daysKQRKoderma

                                            via Kanpur · 6 routes · best 36 h 33 min

                                              All 6 combinations via Kanpur
                                              1. Option 2: 4:45 PM5:18 AM+2 days

                                                36 h 33 min1 changeSmallest buffer: 485 minfrom ₹1,465 (est.)

                                                via Kanpur

                                                1. 4:45 PMTNAThane

                                                  Train12107Sitapur Jn. SF Express

                                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 16:25 (4:25 PM) · you board on day 1

                                                  Ends at Sitapur (STP) at Thu, 19 Nov 17:35

                                                  Runs: Mon, Wed, Sat

                                                  Indian Railways · 20 h 55 min · 1320 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹340SL ₹6453A ₹1,6652A ₹2,330(est.)

                                                  7 stops — Show or hide intermediate stops
                                                  1. 5:07 PMKYNKalyan Jn · 3 min halt
                                                  2. 7:25 PMNKNasik Road · 5 min halt
                                                  3. 11:15 PMBSLBhusaval Jn · 5 min halt
                                                  4. 5:35 AMBPLBhopal Jn · 10 min halt
                                                  5. 8:11 AMLARLalitpur · 2 min halt
                                                  6. 9:35 AMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                                                  7. 10:58 AMORAIOrai · 2 min halt
                                                  1:40 PM+1 dayCNBKanpur Central
                                                2. Change at Kanpur

                                                  • Same station, no local travel
                                                  • Safety buffer: 485 min (8 h 5 min) Total wait: 485 min

                                                  Partner link

                                                  Long wait at Kanpur?

                                                  Find a room near Kanpur Central
                                                3. 9:45 PM+1 dayCNBKanpur Central

                                                  Train22824New Delhi - Bhubaneswar Tejas Rajdhani Express

                                                  Starts from New Delhi (NDLS) on Thu, 19 Nov at 17:00 (5:00 PM) · you board on day 1

                                                  Ends at Bhubaneswar (BBS) at Fri, 20 Nov 17:30

                                                  Runs: Tue, Wed, Thu, Sat

                                                  Indian Railways · 7 h 33 min · 631 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  3A ₹1,1252A ₹1,5651A ₹2,590(est.)

                                                  3 stops — Show or hide intermediate stops
                                                  1. 11:51 PMPRYJPrayagraj Jn · 2 min halt
                                                  2. 1:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                  3. 4:10 AMGAYAGaya Jn · 3 min halt
                                                  5:18 AM+2 daysKQRKoderma
                                              2. Option 3: 1:00 AM1:55 PM+1 day

                                                36 h 55 min1 changeSmallest buffer: 240 minfrom ₹525 (est.)

                                                via Kanpur

                                                1. 1:00 AMTNAThane

                                                  Train22538Kushinagar SF Express

                                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 00:35 (12:35 AM) · you board on day 1

                                                  Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 07:10

                                                  Runs: Daily

                                                  Indian Railways · 22 h 15 min · 1306 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹340SL ₹6403A ₹1,6502A ₹2,3151A ₹3,840(est.)

                                                  31 stops — Show or hide intermediate stops
                                                  1. 1:17 AMKYNKalyan Jn · 3 min halt
                                                  2. 3:45 AMDVLDevlali · 1 min halt
                                                  3. 3:55 AMNKNasik Road · 5 min halt
                                                  4. 4:55 AMMMRManmad Jn · 5 min halt
                                                  5. 5:24 AMNGNNandgaon · 1 min halt
                                                  6. 6:05 AMCSNChalisgaon Jn · 2 min halt
                                                  7. 6:33 AMPCPachora Jn · 2 min halt
                                                  8. 7:18 AMJLJalgaon Jn · 2 min halt
                                                  9. 7:50 AMBSLBhusaval Jn · 5 min halt
                                                  10. 8:25 AMRVRaver · 2 min halt
                                                  11. 8:40 AMBAUBurhanpur · 2 min halt
                                                  12. 9:10 AMNPNRNepanagar · 1 min halt
                                                  13. 10:12 AMKNWKhandwa · 3 min halt
                                                  14. 11:00 AMKKNKhirkiya · 2 min halt
                                                  15. 11:23 AMHDHarda · 2 min halt
                                                  16. 11:34 AMTBNTimarni · 2 min halt
                                                  17. 12:40 PMETItarsi Jn · 10 min halt
                                                  18. 1:07 PMNDPMNarmadapuram · 2 min halt
                                                  19. 1:58 PMMDDPMandi Dip · 2 min halt
                                                  20. 2:28 PMRKMPRani Kamalapati · 2 min halt
                                                  21. 2:45 PMBPLBhopal Jn · 5 min halt
                                                  22. 3:25 PMBHSVidisha · 2 min halt
                                                  23. 4:10 PMBAQGanj Basoda · 2 min halt
                                                  24. 5:15 PMBINABina Jn · 5 min halt
                                                  25. 5:59 PMLARLalitpur · 2 min halt
                                                  26. 6:39 PMBABBabina · 1 min halt
                                                  27. 7:15 PMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                                                  28. 8:34 PMAITAit · 2 min halt
                                                  29. 8:55 PMORAIOrai · 2 min halt
                                                  30. 9:22 PMKPIKalpi · 2 min halt
                                                  31. 9:38 PMPHNPokhrayan · 2 min halt
                                                  11:15 PMBZMBhimsen
                                                2. Change at Kanpur

                                                  • Local transit: 45 min · Bhimsen (BZM) → Govindpuri (GOY)
                                                  • Safety buffer: 240 min (4 h) Total wait: 285 min

                                                  Night-time change — plan safe waiting and local transport

                                                  Partner link

                                                  Long wait at Kanpur?

                                                  Find a room near Govindpuri
                                                3. 4:00 AM+1 dayGOYGovindpuri

                                                  Train12802Purushottam Express

                                                  Starts from Anand Vihar Terminal (ANVT) on Wed, 18 Nov at 22:45 (10:45 PM) · you board on day 2

                                                  This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                  Ends at Puri (PURI) at Fri, 20 Nov 05:50

                                                  Runs: Daily

                                                  Indian Railways · 9 h 55 min · 633 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹185SL ₹3653A ₹9202A ₹1,2751A ₹2,105(est.)

                                                  11 stops — Show or hide intermediate stops
                                                  1. 5:00 AMFTPFatehpur · 2 min halt
                                                  2. 6:55 AMPRYJPrayagraj Jn · 5 min halt
                                                  3. 8:10 AMMZPMirzapur · 2 min halt
                                                  4. 8:35 AMCARChunar · 2 min halt
                                                  5. 9:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                  6. 10:30 AMBBUBhabua Road · 2 min halt
                                                  7. 11:04 AMSSMSasaram · 2 min halt
                                                  8. 11:20 AMDOSDehri ON Sone · 2 min halt
                                                  9. 11:38 AMAUBRAnugraha N Road · 2 min halt
                                                  10. 12:35 PMGAYAGaya Jn · 5 min halt
                                                  11. 1:18 PMPRPPaharpur · 2 min halt
                                                  1:55 PM+1 dayKQRKoderma
                                              3. Option 4: 4:45 PM6:24 AM+2 days

                                                37 h 39 min1 changeSmallest buffer: 355 minfrom ₹525 (est.)

                                                via Kanpur

                                                1. 4:45 PMTNAThane

                                                  Train12107Sitapur Jn. SF Express

                                                  Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 16:25 (4:25 PM) · you board on day 1

                                                  Ends at Sitapur (STP) at Thu, 19 Nov 17:35

                                                  Runs: Mon, Wed, Sat

                                                  Indian Railways · 20 h 55 min · 1320 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹340SL ₹6453A ₹1,6652A ₹2,330(est.)

                                                  7 stops — Show or hide intermediate stops
                                                  1. 5:07 PMKYNKalyan Jn · 3 min halt
                                                  2. 7:25 PMNKNasik Road · 5 min halt
                                                  3. 11:15 PMBSLBhusaval Jn · 5 min halt
                                                  4. 5:35 AMBPLBhopal Jn · 10 min halt
                                                  5. 8:11 AMLARLalitpur · 2 min halt
                                                  6. 9:35 AMVGLJVeerangana Lakshmibai Jhansi · 8 min halt
                                                  7. 10:58 AMORAIOrai · 2 min halt
                                                  1:40 PM+1 dayCNBKanpur Central
                                                2. Change at Kanpur

                                                  • Same station, no local travel
                                                  • Safety buffer: 355 min (5 h 55 min) Total wait: 355 min

                                                  Partner link

                                                  Long wait at Kanpur?

                                                  Find a room near Kanpur Central
                                                3. 7:35 PM+1 dayCNBKanpur Central

                                                  Train12495Pratap SF Express

                                                  Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 1

                                                  Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                                                  Runs: Thu

                                                  Indian Railways · 10 h 49 min · 631 km

                                                  Scheduled timetable. From the published timetable. Delays are possible.

                                                  GN ₹185SL ₹3653A ₹9152A ₹1,275(est.)

                                                  3 stops — Show or hide intermediate stops
                                                  1. 10:05 PMPRYJPrayagraj Jn · 5 min halt
                                                  2. 2:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                  3. 5:05 AMGAYAGaya Jn · 5 min halt
                                                  6:24 AM+2 daysKQRKoderma
                                              Search another date

                                              via Itarsi · 8 routes · best 36 h 37 min

                                                All 8 combinations via Itarsi
                                                1. Option 2: 1:00 AM1:37 PM+1 day

                                                  36 h 37 min2 changesSmallest buffer: 180 minfrom ₹465 (est.)

                                                  via Itarsi · Gaya

                                                  1. 1:00 AMTNAThane

                                                    Train22538Kushinagar SF Express

                                                    Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 00:35 (12:35 AM) · you board on day 1

                                                    Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 07:10

                                                    Runs: Daily

                                                    Indian Railways · 11 h 40 min · 716 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹205SL ₹4003A ₹1,0202A ₹1,4151A ₹2,340(est.)

                                                    16 stops — Show or hide intermediate stops
                                                    1. 1:17 AMKYNKalyan Jn · 3 min halt
                                                    2. 3:45 AMDVLDevlali · 1 min halt
                                                    3. 3:55 AMNKNasik Road · 5 min halt
                                                    4. 4:55 AMMMRManmad Jn · 5 min halt
                                                    5. 5:24 AMNGNNandgaon · 1 min halt
                                                    6. 6:05 AMCSNChalisgaon Jn · 2 min halt
                                                    7. 6:33 AMPCPachora Jn · 2 min halt
                                                    8. 7:18 AMJLJalgaon Jn · 2 min halt
                                                    9. 7:50 AMBSLBhusaval Jn · 5 min halt
                                                    10. 8:25 AMRVRaver · 2 min halt
                                                    11. 8:40 AMBAUBurhanpur · 2 min halt
                                                    12. 9:10 AMNPNRNepanagar · 1 min halt
                                                    13. 10:12 AMKNWKhandwa · 3 min halt
                                                    14. 11:00 AMKKNKhirkiya · 2 min halt
                                                    15. 11:23 AMHDHarda · 2 min halt
                                                    16. 11:34 AMTBNTimarni · 2 min halt
                                                    12:40 PMETItarsi Jn
                                                  2. Change at Itarsi

                                                    • Same station, no local travel
                                                    • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
                                                  3. 3:45 PMETItarsi Jn

                                                    Train22364Coimbatore - Dhanbad Amrit Bharat Express

                                                    Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

                                                    This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

                                                    Runs: Tue

                                                    Indian Railways · 17 h 10 min · 956 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹250SL ₹480(est.)

                                                    12 stops — Show or hide intermediate stops
                                                    1. 4:33 PMPPIPipariya · 2 min halt
                                                    2. 5:33 PMNUNarsinghpur · 2 min halt
                                                    3. 6:40 PMJBPJabalpur · 10 min halt
                                                    4. 8:03 PMKTEKatni · 2 min halt
                                                    5. 9:15 PMSTASatna · 5 min halt
                                                    6. 1:10 AMPCOIPrayagraj Chheoki · 2 min halt
                                                    7. 2:15 AMMZPMirzapur · 2 min halt
                                                    8. 5:05 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                                                    9. 5:56 AMBBUBhabua Road · 2 min halt
                                                    10. 6:30 AMSSMSasaram · 2 min halt
                                                    11. 6:48 AMDOSDehri ON Sone · 2 min halt
                                                    12. 7:03 AMAUBRAnugraha N Road · 2 min halt
                                                    8:55 AM+1 dayGAYAGaya Jn
                                                  4. Change at Gaya

                                                    • Same station, no local travel
                                                    • Safety buffer: 180 min (3 h) Total wait: 180 min
                                                  5. 11:55 AM+1 dayGAYAGaya Jn

                                                    Train53522Varanasi-asansol Passenger

                                                    Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 04:25 (4:25 AM) · you board on day 1

                                                    Ends at Asansol Jn (ASN) at Thu, 19 Nov 21:00

                                                    Runs: Daily · Running days not verified — check before booking

                                                    Indian Railways · 1 h 42 min · 53 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹10(est.)

                                                    6 stops — Show or hide intermediate stops
                                                    1. 12:07 PMMPOManpur Jn · 1 min halt
                                                    2. 12:24 PMBNFBandhua · 1 min halt
                                                    3. 12:34 PMTKNTankuppa · 1 min halt
                                                    4. 12:43 PMBNSLBansinala Halt
                                                    5. 12:51 PMPRPPaharpur · 1 min halt
                                                    6. 1:05 PMGAPGurpa · 1 min halt
                                                    1:37 PM+1 dayDLWDilwa
                                                2. Option 3: 1:00 AM1:53 PM+1 day

                                                  36 h 53 min2 changesSmallest buffer: 180 minfrom ₹465 (est.)

                                                  via Itarsi · Gaya

                                                  1. 1:00 AMTNAThane

                                                    Train22538Kushinagar SF Express

                                                    Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 00:35 (12:35 AM) · you board on day 1

                                                    Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 07:10

                                                    Runs: Daily

                                                    Indian Railways · 11 h 40 min · 716 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹205SL ₹4003A ₹1,0202A ₹1,4151A ₹2,340(est.)

                                                    16 stops — Show or hide intermediate stops
                                                    1. 1:17 AMKYNKalyan Jn · 3 min halt
                                                    2. 3:45 AMDVLDevlali · 1 min halt
                                                    3. 3:55 AMNKNasik Road · 5 min halt
                                                    4. 4:55 AMMMRManmad Jn · 5 min halt
                                                    5. 5:24 AMNGNNandgaon · 1 min halt
                                                    6. 6:05 AMCSNChalisgaon Jn · 2 min halt
                                                    7. 6:33 AMPCPachora Jn · 2 min halt
                                                    8. 7:18 AMJLJalgaon Jn · 2 min halt
                                                    9. 7:50 AMBSLBhusaval Jn · 5 min halt
                                                    10. 8:25 AMRVRaver · 2 min halt
                                                    11. 8:40 AMBAUBurhanpur · 2 min halt
                                                    12. 9:10 AMNPNRNepanagar · 1 min halt
                                                    13. 10:12 AMKNWKhandwa · 3 min halt
                                                    14. 11:00 AMKKNKhirkiya · 2 min halt
                                                    15. 11:23 AMHDHarda · 2 min halt
                                                    16. 11:34 AMTBNTimarni · 2 min halt
                                                    12:40 PMETItarsi Jn
                                                  2. Change at Itarsi

                                                    • Same station, no local travel
                                                    • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
                                                  3. 3:45 PMETItarsi Jn

                                                    Train22364Coimbatore - Dhanbad Amrit Bharat Express

                                                    Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

                                                    This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

                                                    Runs: Tue

                                                    Indian Railways · 17 h 10 min · 956 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹250SL ₹480(est.)

                                                    12 stops — Show or hide intermediate stops
                                                    1. 4:33 PMPPIPipariya · 2 min halt
                                                    2. 5:33 PMNUNarsinghpur · 2 min halt
                                                    3. 6:40 PMJBPJabalpur · 10 min halt
                                                    4. 8:03 PMKTEKatni · 2 min halt
                                                    5. 9:15 PMSTASatna · 5 min halt
                                                    6. 1:10 AMPCOIPrayagraj Chheoki · 2 min halt
                                                    7. 2:15 AMMZPMirzapur · 2 min halt
                                                    8. 5:05 AMDDUPt. Deen Dayal Upadhyaya Jn · 10 min halt
                                                    9. 5:56 AMBBUBhabua Road · 2 min halt
                                                    10. 6:30 AMSSMSasaram · 2 min halt
                                                    11. 6:48 AMDOSDehri ON Sone · 2 min halt
                                                    12. 7:03 AMAUBRAnugraha N Road · 2 min halt
                                                    8:55 AM+1 dayGAYAGaya Jn
                                                  4. Change at Gaya

                                                    • Same station, no local travel
                                                    • Safety buffer: 180 min (3 h) Total wait: 180 min
                                                  5. 11:55 AM+1 dayGAYAGaya Jn

                                                    Train53522Varanasi-asansol Passenger

                                                    Starts from Varanasi Jn (BSB) on Thu, 19 Nov at 04:25 (4:25 AM) · you board on day 1

                                                    Ends at Asansol Jn (ASN) at Thu, 19 Nov 21:00

                                                    Runs: Daily · Running days not verified — check before booking

                                                    Indian Railways · 1 h 58 min · 59 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹10(est.)

                                                    7 stops — Show or hide intermediate stops
                                                    1. 12:07 PMMPOManpur Jn · 1 min halt
                                                    2. 12:24 PMBNFBandhua · 1 min halt
                                                    3. 12:34 PMTKNTankuppa · 1 min halt
                                                    4. 12:43 PMBNSLBansinala Halt
                                                    5. 12:51 PMPRPPaharpur · 1 min halt
                                                    6. 1:05 PMGAPGurpa · 1 min halt
                                                    7. 1:37 PMDLWDilwa · 1 min halt
                                                    1:53 PM+1 dayGJDGujhandi
                                                3. Option 4: 12:50 AM1:55 PM+1 day

                                                  37 h 5 min2 changesSmallest buffer: 210 minfrom ₹490 (est.)

                                                  via Itarsi · Prayagraj

                                                  1. 12:50 AMTNAThane

                                                    Train11093Bnrs Mahanagari Express

                                                    Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 00:15 (12:15 AM) · you board on day 1

                                                    Ends at Banaras (BNRS) at Thu, 19 Nov 03:45

                                                    Runs: Daily

                                                    Indian Railways · 11 h 25 min · 717 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹190SL ₹3753A ₹9752A ₹1,3751A ₹2,270(est.)

                                                    11 stops — Show or hide intermediate stops
                                                    1. 1:12 AMKYNKalyan Jn · 3 min halt
                                                    2. 2:53 AMIGPIgatpuri · 5 min halt
                                                    3. 3:40 AMNKNasik Road · 5 min halt
                                                    4. 4:38 AMMMRManmad Jn · 2 min halt
                                                    5. 4:55 AMNGNNandgaon · 1 min halt
                                                    6. 5:26 AMCSNChalisgaon Jn · 1 min halt
                                                    7. 6:00 AMPCPachora Jn · 1 min halt
                                                    8. 6:33 AMJLJalgaon Jn · 2 min halt
                                                    9. 7:15 AMBSLBhusaval Jn · 5 min halt
                                                    10. 8:15 AMBAUBurhanpur · 2 min halt
                                                    11. 9:47 AMKNWKhandwa · 3 min halt
                                                    12:15 PMETItarsi Jn
                                                  2. Change at Itarsi

                                                    • Same station, no local travel
                                                    • Safety buffer: 210 min (3 h 30 min) Total wait: 210 min
                                                  3. 3:45 PMETItarsi Jn

                                                    Train22364Coimbatore - Dhanbad Amrit Bharat Express

                                                    Starts from Coimbatore Jn (CBE) on Tue, 17 Nov at 07:50 (7:50 AM) · you board on day 2

                                                    This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Dhanbad Jn (DHN) at Thu, 19 Nov 13:00

                                                    Runs: Tue

                                                    Indian Railways · 9 h 25 min · 605 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹165SL ₹320(est.)

                                                    5 stops — Show or hide intermediate stops
                                                    1. 4:33 PMPPIPipariya · 2 min halt
                                                    2. 5:33 PMNUNarsinghpur · 2 min halt
                                                    3. 6:40 PMJBPJabalpur · 10 min halt
                                                    4. 8:03 PMKTEKatni · 2 min halt
                                                    5. 9:15 PMSTASatna · 5 min halt
                                                    1:10 AM+1 dayPCOIPrayagraj Chheoki
                                                  4. Change at Prayagraj

                                                    • Local transit: 40 min · Prayagraj Chheoki (PCOI) → Prayagraj Jn (PRYJ)
                                                    • Safety buffer: 310 min (5 h 10 min) Total wait: 350 min

                                                    Night-time change — plan safe waiting and local transport

                                                    Partner link

                                                    Long wait at Prayagraj?

                                                    Find a room near Prayagraj Jn
                                                  5. 7:00 AM+1 dayPRYJPrayagraj Jn

                                                    Train12802Purushottam Express

                                                    Starts from Anand Vihar Terminal (ANVT) on Wed, 18 Nov at 22:45 (10:45 PM) · you board on day 2

                                                    This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                    Ends at Puri (PURI) at Fri, 20 Nov 05:50

                                                    Runs: Daily

                                                    Indian Railways · 6 h 55 min · 436 km

                                                    Scheduled timetable. From the published timetable. Delays are possible.

                                                    GN ₹135SL ₹2753A ₹6852A ₹9401A ₹1,545(est.)

                                                    9 stops — Show or hide intermediate stops
                                                    1. 8:10 AMMZPMirzapur · 2 min halt
                                                    2. 8:35 AMCARChunar · 2 min halt
                                                    3. 9:43 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                    4. 10:30 AMBBUBhabua Road · 2 min halt
                                                    5. 11:04 AMSSMSasaram · 2 min halt
                                                    6. 11:20 AMDOSDehri ON Sone · 2 min halt
                                                    7. 11:38 AMAUBRAnugraha N Road · 2 min halt
                                                    8. 12:35 PMGAYAGaya Jn · 5 min halt
                                                    9. 1:18 PMPRPPaharpur · 2 min halt
                                                    1:55 PM+1 dayKQRKoderma
                                                Search another date

                                                via Bhiwandi · 2 routes · best 36 h 55 min

                                                  All 2 combinations via Bhiwandi
                                                  1. Option 2: 2:33 PM3:28 AM+2 days

                                                    36 h 55 min2 changesSmallest buffer: 196 minfrom ₹445 (est.)

                                                    via Bhiwandi · Kalyan

                                                    1. 2:33 PMDIVADiva

                                                      Train61006Diva - Vasai Road Local

                                                      Starts from Diva (DIVA) on Wed, 18 Nov at 14:33 (2:33 PM) · you board on day 1

                                                      Ends at Vasai Road (BSR) at Wed, 18 Nov 15:25

                                                      Runs: Daily

                                                      Indian Railways · 17 min · 13 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹10(est.)

                                                      1 stop — Show or hide intermediate stops
                                                      1. 2:42 PMKOPRKopar · 1 min halt
                                                      2:50 PMBIRDBhivandi Road
                                                    2. Change at Bhiwandi

                                                      • Same station, no local travel
                                                      • Safety buffer: 196 min (3 h 16 min) Total wait: 196 min
                                                    3. 6:06 PMBIRDBhivandi Road

                                                      Train61021Vasai Road - Diva Local

                                                      Starts from Vasai Road (BSR) on Wed, 18 Nov at 17:35 (5:35 PM) · you board on day 1

                                                      Ends at Diva (DIVA) at Wed, 18 Nov 18:35

                                                      Runs: Daily

                                                      Indian Railways · 11 min · 8 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹10(est.)

                                                      6:17 PMKOPRKopar
                                                    4. Change at Kalyan

                                                      • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                                      • Safety buffer: 268 min (4 h 28 min) Total wait: 298 min

                                                      Station change — you must travel to a different station or bus stand

                                                      Partner link

                                                      Long wait at Kalyan?

                                                      Find a room near Kalyan Jn
                                                    5. 11:15 PMKYNKalyan Jn

                                                      Train12322Howrah Mail

                                                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

                                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                      Runs: Daily

                                                      Indian Railways · 28 h 13 min · 1728 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹425SL ₹7903A ₹2,0502A ₹2,8851A ₹4,790(est.)

                                                      31 stops — Show or hide intermediate stops
                                                      1. 12:17 AMKSRAKasara · 3 min halt
                                                      2. 1:35 AMNKNasik Road · 5 min halt
                                                      3. 2:37 AMMMRManmad Jn · 3 min halt
                                                      4. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                      5. 4:48 AMJLJalgaon Jn · 2 min halt
                                                      6. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                      7. 6:08 AMBAUBurhanpur · 2 min halt
                                                      8. 7:23 AMKNWKhandwa · 2 min halt
                                                      9. 8:30 AMHDHarda · 2 min halt
                                                      10. 9:50 AMETItarsi Jn · 10 min halt
                                                      11. 10:46 AMPPIPipariya · 2 min halt
                                                      12. 11:20 AMGARGadarwara · 2 min halt
                                                      13. 11:40 AMKYKareli · 2 min halt
                                                      14. 11:54 AMNUNarsinghpur · 2 min halt
                                                      15. 12:20 PMSRIDSridham · 2 min halt
                                                      16. 1:20 PMJBPJabalpur · 10 min halt
                                                      17. 2:35 PMKTEKatni · 5 min halt
                                                      18. 3:28 PMMYRMaihar · 2 min halt
                                                      19. 4:20 PMSTASatna · 5 min halt
                                                      20. 5:50 PMMKPManikpur Jn · 2 min halt
                                                      21. 6:43 PMSRJShankargarh · 1 min halt
                                                      22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                      23. 8:20 PMBDLVindhyachal · 2 min halt
                                                      24. 8:35 PMMZPMirzapur · 5 min halt
                                                      25. 9:13 PMCARChunar · 2 min halt
                                                      26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                      27. 11:36 PMBBUBhabua Road · 2 min halt
                                                      28. 12:08 AMSSMSasaram · 2 min halt
                                                      29. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                      30. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                      31. 2:05 AMGAYAGaya Jn · 5 min halt
                                                      3:28 AM+2 daysKQRKoderma
                                                  2. Option 3: 2:33 PM3:45 AM+2 days

                                                    37 h 12 min2 changesSmallest buffer: 196 minfrom ₹450 (est.)

                                                    via Bhiwandi · Kalyan

                                                    1. 2:33 PMDIVADiva

                                                      Train61006Diva - Vasai Road Local

                                                      Starts from Diva (DIVA) on Wed, 18 Nov at 14:33 (2:33 PM) · you board on day 1

                                                      Ends at Vasai Road (BSR) at Wed, 18 Nov 15:25

                                                      Runs: Daily

                                                      Indian Railways · 17 min · 13 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹10(est.)

                                                      1 stop — Show or hide intermediate stops
                                                      1. 2:42 PMKOPRKopar · 1 min halt
                                                      2:50 PMBIRDBhivandi Road
                                                    2. Change at Bhiwandi

                                                      • Same station, no local travel
                                                      • Safety buffer: 196 min (3 h 16 min) Total wait: 196 min
                                                    3. 6:06 PMBIRDBhivandi Road

                                                      Train61021Vasai Road - Diva Local

                                                      Starts from Vasai Road (BSR) on Wed, 18 Nov at 17:35 (5:35 PM) · you board on day 1

                                                      Ends at Diva (DIVA) at Wed, 18 Nov 18:35

                                                      Runs: Daily

                                                      Indian Railways · 11 min · 8 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹10(est.)

                                                      6:17 PMKOPRKopar
                                                    4. Change at Kalyan

                                                      • Local transit: 30 min · Kopar (KOPR) → Kalyan Jn (KYN)
                                                      • Safety buffer: 268 min (4 h 28 min) Total wait: 298 min

                                                      Station change — you must travel to a different station or bus stand

                                                      Partner link

                                                      Long wait at Kalyan?

                                                      Find a room near Kalyan Jn
                                                    5. 11:15 PMKYNKalyan Jn

                                                      Train12322Howrah Mail

                                                      Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 1

                                                      Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                      Runs: Daily

                                                      Indian Railways · 28 h 30 min · 1754 km

                                                      Scheduled timetable. From the published timetable. Delays are possible.

                                                      GN ₹430SL ₹8003A ₹2,0752A ₹2,9201A ₹4,845(est.)

                                                      32 stops — Show or hide intermediate stops
                                                      1. 12:17 AMKSRAKasara · 3 min halt
                                                      2. 1:35 AMNKNasik Road · 5 min halt
                                                      3. 2:37 AMMMRManmad Jn · 3 min halt
                                                      4. 3:33 AMCSNChalisgaon Jn · 2 min halt
                                                      5. 4:48 AMJLJalgaon Jn · 2 min halt
                                                      6. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                      7. 6:08 AMBAUBurhanpur · 2 min halt
                                                      8. 7:23 AMKNWKhandwa · 2 min halt
                                                      9. 8:30 AMHDHarda · 2 min halt
                                                      10. 9:50 AMETItarsi Jn · 10 min halt
                                                      11. 10:46 AMPPIPipariya · 2 min halt
                                                      12. 11:20 AMGARGadarwara · 2 min halt
                                                      13. 11:40 AMKYKareli · 2 min halt
                                                      14. 11:54 AMNUNarsinghpur · 2 min halt
                                                      15. 12:20 PMSRIDSridham · 2 min halt
                                                      16. 1:20 PMJBPJabalpur · 10 min halt
                                                      17. 2:35 PMKTEKatni · 5 min halt
                                                      18. 3:28 PMMYRMaihar · 2 min halt
                                                      19. 4:20 PMSTASatna · 5 min halt
                                                      20. 5:50 PMMKPManikpur Jn · 2 min halt
                                                      21. 6:43 PMSRJShankargarh · 1 min halt
                                                      22. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                      23. 8:20 PMBDLVindhyachal · 2 min halt
                                                      24. 8:35 PMMZPMirzapur · 5 min halt
                                                      25. 9:13 PMCARChunar · 2 min halt
                                                      26. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                      27. 11:36 PMBBUBhabua Road · 2 min halt
                                                      28. 12:08 AMSSMSasaram · 2 min halt
                                                      29. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                      30. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                      31. 2:05 AMGAYAGaya Jn · 5 min halt
                                                      32. 3:28 AMKQRKoderma · 2 min halt
                                                      3:45 AM+2 daysPSBParsabad

                                                  via Harda · 2 routes · best 37 h 18 min

                                                    All 2 combinations via Harda
                                                    1. Option 2: 2:10 PM3:28 AM+2 days

                                                      37 h 18 min1 changeSmallest buffer: 479 minfrom ₹470 (est.)

                                                      via Harda

                                                      1. 2:10 PMTNAThane

                                                        Train11071Kamayani Express

                                                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 13:50 (1:50 PM) · you board on day 1

                                                        Ends at Ballia (BUI) at Thu, 19 Nov 22:35

                                                        Runs: Daily

                                                        Indian Railways · 10 h 23 min · 640 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹170SL ₹3403A ₹8852A ₹1,245(est.)

                                                        16 stops — Show or hide intermediate stops
                                                        1. 2:32 PMKYNKalyan Jn · 3 min halt
                                                        2. 4:17 PMIGPIgatpuri · 5 min halt
                                                        3. 5:07 PMNKNasik Road · 3 min halt
                                                        4. 5:37 PMLSLasalgaon · 1 min halt
                                                        5. 6:03 PMMMRManmad Jn · 2 min halt
                                                        6. 6:17 PMNGNNandgaon · 1 min halt
                                                        7. 6:43 PMCSNChalisgaon Jn · 2 min halt
                                                        8. 7:21 PMPCPachora Jn · 2 min halt
                                                        9. 8:05 PMJLJalgaon Jn · 2 min halt
                                                        10. 8:45 PMBSLBhusaval Jn · 5 min halt
                                                        11. 9:26 PMRVRaver · 1 min halt
                                                        12. 9:41 PMBAUBurhanpur · 2 min halt
                                                        13. 10:14 PMNPNRNepanagar · 1 min halt
                                                        14. 11:17 PMKNWKhandwa · 3 min halt
                                                        15. 11:50 PMCAERChhanera · 2 min halt
                                                        16. 12:13 AMKKNKhirkiya · 2 min halt
                                                        12:33 AM+1 dayHDHarda
                                                      2. Change at Harda

                                                        • Same station, no local travel
                                                        • Safety buffer: 479 min (7 h 59 min) Total wait: 479 min

                                                        Night-time change — plan safe waiting and local transport

                                                        Partner link

                                                        Long wait at Harda?

                                                        Find a room near Harda
                                                      3. 8:32 AM+1 dayHDHarda

                                                        Train12322Howrah Mail

                                                        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                                        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                        Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                        Runs: Daily

                                                        Indian Railways · 18 h 56 min · 1108 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹300SL ₹5703A ₹1,4652A ₹2,0451A ₹3,395(est.)

                                                        22 stops — Show or hide intermediate stops
                                                        1. 9:50 AMETItarsi Jn · 10 min halt
                                                        2. 10:46 AMPPIPipariya · 2 min halt
                                                        3. 11:20 AMGARGadarwara · 2 min halt
                                                        4. 11:40 AMKYKareli · 2 min halt
                                                        5. 11:54 AMNUNarsinghpur · 2 min halt
                                                        6. 12:20 PMSRIDSridham · 2 min halt
                                                        7. 1:20 PMJBPJabalpur · 10 min halt
                                                        8. 2:35 PMKTEKatni · 5 min halt
                                                        9. 3:28 PMMYRMaihar · 2 min halt
                                                        10. 4:20 PMSTASatna · 5 min halt
                                                        11. 5:50 PMMKPManikpur Jn · 2 min halt
                                                        12. 6:43 PMSRJShankargarh · 1 min halt
                                                        13. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                        14. 8:20 PMBDLVindhyachal · 2 min halt
                                                        15. 8:35 PMMZPMirzapur · 5 min halt
                                                        16. 9:13 PMCARChunar · 2 min halt
                                                        17. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                        18. 11:36 PMBBUBhabua Road · 2 min halt
                                                        19. 12:08 AMSSMSasaram · 2 min halt
                                                        20. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                        21. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                        22. 2:05 AMGAYAGaya Jn · 5 min halt
                                                        3:28 AM+2 daysKQRKoderma
                                                    2. Option 3: 2:10 PM3:45 AM+2 days

                                                      37 h 35 min1 changeSmallest buffer: 479 minfrom ₹475 (est.)

                                                      via Harda

                                                      1. 2:10 PMTNAThane

                                                        Train11071Kamayani Express

                                                        Starts from Mumbai Ltt (LTT) on Wed, 18 Nov at 13:50 (1:50 PM) · you board on day 1

                                                        Ends at Ballia (BUI) at Thu, 19 Nov 22:35

                                                        Runs: Daily

                                                        Indian Railways · 10 h 23 min · 640 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹170SL ₹3403A ₹8852A ₹1,245(est.)

                                                        16 stops — Show or hide intermediate stops
                                                        1. 2:32 PMKYNKalyan Jn · 3 min halt
                                                        2. 4:17 PMIGPIgatpuri · 5 min halt
                                                        3. 5:07 PMNKNasik Road · 3 min halt
                                                        4. 5:37 PMLSLasalgaon · 1 min halt
                                                        5. 6:03 PMMMRManmad Jn · 2 min halt
                                                        6. 6:17 PMNGNNandgaon · 1 min halt
                                                        7. 6:43 PMCSNChalisgaon Jn · 2 min halt
                                                        8. 7:21 PMPCPachora Jn · 2 min halt
                                                        9. 8:05 PMJLJalgaon Jn · 2 min halt
                                                        10. 8:45 PMBSLBhusaval Jn · 5 min halt
                                                        11. 9:26 PMRVRaver · 1 min halt
                                                        12. 9:41 PMBAUBurhanpur · 2 min halt
                                                        13. 10:14 PMNPNRNepanagar · 1 min halt
                                                        14. 11:17 PMKNWKhandwa · 3 min halt
                                                        15. 11:50 PMCAERChhanera · 2 min halt
                                                        16. 12:13 AMKKNKhirkiya · 2 min halt
                                                        12:33 AM+1 dayHDHarda
                                                      2. Change at Harda

                                                        • Same station, no local travel
                                                        • Safety buffer: 479 min (7 h 59 min) Total wait: 479 min

                                                        Night-time change — plan safe waiting and local transport

                                                        Partner link

                                                        Long wait at Harda?

                                                        Find a room near Harda
                                                      3. 8:32 AM+1 dayHDHarda

                                                        Train12322Howrah Mail

                                                        Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                                        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                        Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                        Runs: Daily

                                                        Indian Railways · 19 h 13 min · 1134 km

                                                        Scheduled timetable. From the published timetable. Delays are possible.

                                                        GN ₹305SL ₹5803A ₹1,4852A ₹2,0801A ₹3,450(est.)

                                                        23 stops — Show or hide intermediate stops
                                                        1. 9:50 AMETItarsi Jn · 10 min halt
                                                        2. 10:46 AMPPIPipariya · 2 min halt
                                                        3. 11:20 AMGARGadarwara · 2 min halt
                                                        4. 11:40 AMKYKareli · 2 min halt
                                                        5. 11:54 AMNUNarsinghpur · 2 min halt
                                                        6. 12:20 PMSRIDSridham · 2 min halt
                                                        7. 1:20 PMJBPJabalpur · 10 min halt
                                                        8. 2:35 PMKTEKatni · 5 min halt
                                                        9. 3:28 PMMYRMaihar · 2 min halt
                                                        10. 4:20 PMSTASatna · 5 min halt
                                                        11. 5:50 PMMKPManikpur Jn · 2 min halt
                                                        12. 6:43 PMSRJShankargarh · 1 min halt
                                                        13. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                        14. 8:20 PMBDLVindhyachal · 2 min halt
                                                        15. 8:35 PMMZPMirzapur · 5 min halt
                                                        16. 9:13 PMCARChunar · 2 min halt
                                                        17. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                        18. 11:36 PMBBUBhabua Road · 2 min halt
                                                        19. 12:08 AMSSMSasaram · 2 min halt
                                                        20. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                        21. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                        22. 2:05 AMGAYAGaya Jn · 5 min halt
                                                        23. 3:28 AMKQRKoderma · 2 min halt
                                                        3:45 AM+2 daysPSBParsabad

                                                    via Bharatpur · 1 route · best 37 h 44 min

                                                      All 1 combinations via Bharatpur
                                                      1. Option 2: 7:18 PM9:02 AM+2 days

                                                        37 h 44 min2 changesSmallest buffer: 197 minfrom ₹595 (est.)

                                                        via Bharatpur · Agra

                                                        1. 7:18 PMBVIBorivali

                                                          Train12903Golden Temple Mail

                                                          Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 18:45 (6:45 PM) · you board on day 1

                                                          Ends at Amritsar Jn (ASR) at Thu, 19 Nov 23:45

                                                          Runs: Daily

                                                          Indian Railways · 15 h 35 min · 1185 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹315SL ₹5953A ₹1,5352A ₹2,1501A ₹3,565(est.)

                                                          16 stops — Show or hide intermediate stops
                                                          1. 9:59 PMSTSurat · 5 min halt
                                                          2. 11:34 PMBRCVadodara Jn · 10 min halt
                                                          3. 12:49 AMGDAGodhra Jn · 2 min halt
                                                          4. 1:38 AMDHDDahod · 2 min halt
                                                          5. 2:04 AMMGNMeghnagar · 2 min halt
                                                          6. 3:30 AMRTMRatlam Jn · 5 min halt
                                                          7. 4:23 AMNADNagda Jn · 5 min halt
                                                          8. 5:23 AMSGZShamgarh · 2 min halt
                                                          9. 5:48 AMBWMBhawani Mandi · 2 min halt
                                                          10. 6:08 AMRMARamganj Mandi · 2 min halt
                                                          11. 7:05 AMKOTAKota Jn · 10 min halt
                                                          12. 8:25 AMSWMSawai Madhopur · 5 min halt
                                                          13. 9:10 AMGGCGangapur City · 5 min halt
                                                          14. 9:38 AMSMVJShri Mahaveerji · 2 min halt
                                                          15. 9:53 AMHANHindaun City · 2 min halt
                                                          16. 10:23 AMBXNBayana Jn · 2 min halt
                                                          10:53 AM+1 dayBTEBharatpur Jn
                                                        2. Change at Bharatpur

                                                          • Same station, no local travel
                                                          • Safety buffer: 197 min (3 h 17 min) Total wait: 197 min
                                                        3. 2:10 PM+1 dayBTEBharatpur Jn

                                                          Train12495Pratap SF Express

                                                          Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 1

                                                          Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                                                          Runs: Thu

                                                          Indian Railways · 1 h 10 min · 53 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹30SL ₹1603A ₹5202A ₹710(est.)

                                                          1 stop — Show or hide intermediate stops
                                                          1. 2:36 PMAHAchhnera Jn · 2 min halt
                                                          3:20 PM+1 dayAFAgra Fort
                                                        4. Change at Agra

                                                          • Same station, no local travel
                                                          • Safety buffer: 205 min (3 h 25 min) Total wait: 205 min
                                                        5. 6:45 PM+1 dayAFAgra Fort

                                                          Train12988Sealdah SF Express

                                                          Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 1

                                                          Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

                                                          Runs: Daily

                                                          Indian Railways · 14 h 17 min · 883 km

                                                          Scheduled timetable. From the published timetable. Delays are possible.

                                                          GN ₹250SL ₹4753A ₹1,2202A ₹1,7001A ₹2,815(est.)

                                                          8 stops — Show or hide intermediate stops
                                                          1. 8:20 PMTDLTundla Jn · 5 min halt
                                                          2. 10:55 PMGOYGovindpuri · 10 min halt
                                                          3. 1:50 AMPRYJPrayagraj Jn · 5 min halt
                                                          4. 4:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                          5. 5:35 AMBBUBhabua Road · 2 min halt
                                                          6. 6:05 AMSSMSasaram · 2 min halt
                                                          7. 6:20 AMDOSDehri ON Sone · 2 min halt
                                                          8. 7:50 AMGAYAGaya Jn · 5 min halt
                                                          9:02 AM+2 daysKQRKoderma

                                                      via Agra · 2 routes · best 40 h 2 min

                                                        All 2 combinations via Agra
                                                        1. Option 2: 2:22 PM6:24 AM+2 days

                                                          40 h 2 min1 changeSmallest buffer: 360 minfrom ₹555 (est.)

                                                          via Agra

                                                          1. 2:22 PMBVIBorivali

                                                            Train05092Gorakhpur Special Fare Festival Special

                                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                            Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                            Runs: Wed

                                                            Indian Railways · 18 h 48 min · 1226 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹305SL ₹5803A ₹1,5302A ₹2,160(est.)

                                                            7 stops — Show or hide intermediate stops
                                                            1. 3:51 PMVAPIVapi · 2 min halt
                                                            2. 5:00 PMSTSurat · 5 min halt
                                                            3. 6:40 PMBRCVadodara Jn · 5 min halt
                                                            4. 11:30 PMRTMRatlam Jn · 5 min halt
                                                            5. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                            6. 3:30 AMKOTAKota Jn · 10 min halt
                                                            7. 6:06 AMGGCGangapur City · 5 min halt
                                                            9:10 AM+1 dayIDHIdgah Agra Jn
                                                          2. Change at Agra

                                                            • Local transit: 20 min · Idgah Agra Jn (IDH) → Agra Fort (AF)
                                                            • Safety buffer: 360 min (6 h) Total wait: 380 min

                                                            Station change — you must travel to a different station or bus stand

                                                            Partner link

                                                            Long wait at Agra?

                                                            Find a room near Agra Fort
                                                          3. 3:30 PM+1 dayAFAgra Fort

                                                            Train12495Pratap SF Express

                                                            Starts from Bikaner Jn (BKN) on Thu, 19 Nov at 06:00 (6:00 AM) · you board on day 1

                                                            Ends at Kolkatta Terminal (KOAA) at Fri, 20 Nov 13:05

                                                            Runs: Thu

                                                            Indian Railways · 14 h 54 min · 885 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹250SL ₹4803A ₹1,2202A ₹1,705(est.)

                                                            5 stops — Show or hide intermediate stops
                                                            1. 4:30 PMTDLTundla Jn · 5 min halt
                                                            2. 7:30 PMCNBKanpur Central · 5 min halt
                                                            3. 10:05 PMPRYJPrayagraj Jn · 5 min halt
                                                            4. 2:18 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                            5. 5:05 AMGAYAGaya Jn · 5 min halt
                                                            6:24 AM+2 daysKQRKoderma
                                                        2. Option 3: 2:22 PM9:02 AM+2 days

                                                          42 h 40 min1 changeSmallest buffer: 555 minfrom ₹555 (est.)

                                                          via Agra

                                                          1. 2:22 PMBVIBorivali

                                                            Train05092Gorakhpur Special Fare Festival Special

                                                            Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 13:45 (1:45 PM) · you board on day 1

                                                            Ends at Gorakhpur Jn (GKP) at Thu, 19 Nov 23:55

                                                            Runs: Wed

                                                            Indian Railways · 18 h 48 min · 1226 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹305SL ₹5803A ₹1,5302A ₹2,160(est.)

                                                            7 stops — Show or hide intermediate stops
                                                            1. 3:51 PMVAPIVapi · 2 min halt
                                                            2. 5:00 PMSTSurat · 5 min halt
                                                            3. 6:40 PMBRCVadodara Jn · 5 min halt
                                                            4. 11:30 PMRTMRatlam Jn · 5 min halt
                                                            5. 1:58 AMBWMBhawani Mandi · 2 min halt
                                                            6. 3:30 AMKOTAKota Jn · 10 min halt
                                                            7. 6:06 AMGGCGangapur City · 5 min halt
                                                            9:10 AM+1 dayIDHIdgah Agra Jn
                                                          2. Change at Agra

                                                            • Local transit: 20 min · Idgah Agra Jn (IDH) → Agra Fort (AF)
                                                            • Safety buffer: 555 min (9 h 15 min) Total wait: 575 min

                                                            Station change — you must travel to a different station or bus stand

                                                            Partner link

                                                            Long wait at Agra?

                                                            Find a room near Agra Fort
                                                          3. 6:45 PM+1 dayAFAgra Fort

                                                            Train12988Sealdah SF Express

                                                            Starts from Ajmer Jn (AII) on Thu, 19 Nov at 12:50 (12:50 PM) · you board on day 1

                                                            Ends at Sealdah (SDAH) at Fri, 20 Nov 15:50

                                                            Runs: Daily

                                                            Indian Railways · 14 h 17 min · 883 km

                                                            Scheduled timetable. From the published timetable. Delays are possible.

                                                            GN ₹250SL ₹4753A ₹1,2202A ₹1,7001A ₹2,815(est.)

                                                            8 stops — Show or hide intermediate stops
                                                            1. 8:20 PMTDLTundla Jn · 5 min halt
                                                            2. 10:55 PMGOYGovindpuri · 10 min halt
                                                            3. 1:50 AMPRYJPrayagraj Jn · 5 min halt
                                                            4. 4:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                            5. 5:35 AMBBUBhabua Road · 2 min halt
                                                            6. 6:05 AMSSMSasaram · 2 min halt
                                                            7. 6:20 AMDOSDehri ON Sone · 2 min halt
                                                            8. 7:50 AMGAYAGaya Jn · 5 min halt
                                                            9:02 AM+2 daysKQRKoderma

                                                        via Jalgaon · 1 route · best 45 h 18 min

                                                          All 1 combinations via Jalgaon
                                                          1. Option 2: 6:10 AM3:28 AM+2 days

                                                            45 h 18 min1 changeSmallest buffer: 697 minfrom ₹405 (est.)

                                                            via Jalgaon

                                                            1. 6:10 AMDIVADiva

                                                              Train51153Mumbai Bhusaval Passenger

                                                              Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 05:20 (5:20 AM) · you board on day 1

                                                              Ends at Bhusaval Jn (BSL) at Wed, 18 Nov 17:50

                                                              Runs: Daily · Running days not verified — check before booking

                                                              Indian Railways · 11 h 3 min · 375 km

                                                              Scheduled timetable. From the published timetable. Delays are possible.

                                                              GN ₹55(est.)

                                                              45 stops — Show or hide intermediate stops
                                                              1. 6:14 AMKOPRKopar
                                                              2. 6:15 AMDIDombivli
                                                              3. 6:17 AMTHKThakruli
                                                              4. 6:20 AMKYNKalyan Jn · 5 min halt
                                                              5. 6:36 AMSHADShahad · 2 min halt
                                                              6. 6:41 AMABYAmbivli · 2 min halt
                                                              7. 6:48 AMTLATitvala · 1 min halt
                                                              8. 6:58 AMKDVKhadavli · 2 min halt
                                                              9. 7:59 AMVSDVasind · 2 min halt
                                                              10. 8:06 AMASOAsangaon · 2 min halt
                                                              11. 8:18 AMATGAtgaon · 2 min halt
                                                              12. 8:34 AMKEKhardi · 2 min halt
                                                              13. 8:51 AMKSRAKasara · 2 min halt
                                                              14. 9:35 AMIGPIgatpuri · 5 min halt
                                                              15. 10:07 AMGOGhoti · 1 min halt
                                                              16. 10:22 AMAVAsvali · 1 min halt
                                                              17. 10:31 AMLTLahavit · 1 min halt
                                                              18. 10:42 AMDVLDevlali · 1 min halt
                                                              19. 10:47 AMNKNasik Road · 3 min halt
                                                              20. 11:12 AMODHAOdha · 1 min halt
                                                              21. 11:21 AMKWKhervadi · 1 min halt
                                                              22. 11:30 AMKBSNKasbe-sukene · 1 min halt
                                                              23. 11:39 AMNRNiphad · 1 min halt
                                                              24. 11:48 AMUGNUgaon · 1 min halt
                                                              25. 11:59 AMLSLasalgaon · 1 min halt
                                                              26. 12:13 PMSUMSummit · 1 min halt
                                                              27. 1:15 PMMMRManmad Jn · 15 min halt
                                                              28. 1:38 PMPNVPanevadi · 1 min halt
                                                              29. 1:47 PMHSLHisvahal · 1 min halt
                                                              30. 1:55 PMPJNPanjhan · 1 min halt
                                                              31. 2:02 PMNGNNandgaon · 1 min halt
                                                              32. 2:16 PMPKEPimpar Khed · 1 min halt
                                                              33. 2:26 PMNINaydongri · 1 min halt
                                                              34. 2:33 PMRHNERohini · 1 min halt
                                                              35. 2:41 PMHPRHirapur · 1 min halt
                                                              36. 2:47 PMCSNChalisgaon Jn · 5 min halt
                                                              37. 3:04 PMVGLVaghli · 1 min halt
                                                              38. 3:12 PMKJKajgaon · 1 min halt
                                                              39. 3:21 PMNGDNagardevla · 1 min halt
                                                              40. 3:31 PMGAAGalan · 1 min halt
                                                              41. 3:45 PMPCPachora Jn · 2 min halt
                                                              42. 3:55 PMPHQPardhande · 1 min halt
                                                              43. 4:03 PMMYJMaheji · 1 min halt
                                                              44. 4:15 PMMWDMhasavad · 1 min halt
                                                              45. 4:34 PMSSShirsoli · 1 min halt
                                                              5:13 PMJLJalgaon Jn
                                                            2. Change at Jalgaon

                                                              • Same station, no local travel
                                                              • Safety buffer: 697 min (11 h 37 min) Total wait: 697 min

                                                              Night-time change — plan safe waiting and local transport

                                                              Partner link

                                                              Long wait at Jalgaon?

                                                              Find a room near Jalgaon Jn
                                                            3. 4:50 AM+1 dayJLJalgaon Jn

                                                              Train12322Howrah Mail

                                                              Starts from Mumbai Csmt (CSMT) on Wed, 18 Nov at 22:15 (10:15 PM) · you board on day 2

                                                              This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

                                                              Ends at Howrah Jn (HWH) at Fri, 20 Nov 11:10

                                                              Runs: Daily

                                                              Indian Railways · 22 h 38 min · 1363 km

                                                              Scheduled timetable. From the published timetable. Delays are possible.

                                                              GN ₹350SL ₹6603A ₹1,7052A ₹2,3901A ₹3,965(est.)

                                                              26 stops — Show or hide intermediate stops
                                                              1. 5:20 AMBSLBhusaval Jn · 5 min halt
                                                              2. 6:08 AMBAUBurhanpur · 2 min halt
                                                              3. 7:23 AMKNWKhandwa · 2 min halt
                                                              4. 8:30 AMHDHarda · 2 min halt
                                                              5. 9:50 AMETItarsi Jn · 10 min halt
                                                              6. 10:46 AMPPIPipariya · 2 min halt
                                                              7. 11:20 AMGARGadarwara · 2 min halt
                                                              8. 11:40 AMKYKareli · 2 min halt
                                                              9. 11:54 AMNUNarsinghpur · 2 min halt
                                                              10. 12:20 PMSRIDSridham · 2 min halt
                                                              11. 1:20 PMJBPJabalpur · 10 min halt
                                                              12. 2:35 PMKTEKatni · 5 min halt
                                                              13. 3:28 PMMYRMaihar · 2 min halt
                                                              14. 4:20 PMSTASatna · 5 min halt
                                                              15. 5:50 PMMKPManikpur Jn · 2 min halt
                                                              16. 6:43 PMSRJShankargarh · 1 min halt
                                                              17. 7:30 PMPCOIPrayagraj Chheoki · 5 min halt
                                                              18. 8:20 PMBDLVindhyachal · 2 min halt
                                                              19. 8:35 PMMZPMirzapur · 5 min halt
                                                              20. 9:13 PMCARChunar · 2 min halt
                                                              21. 10:48 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
                                                              22. 11:36 PMBBUBhabua Road · 2 min halt
                                                              23. 12:08 AMSSMSasaram · 2 min halt
                                                              24. 12:24 AMDOSDehri ON Sone · 2 min halt
                                                              25. 12:40 AMAUBRAnugraha N Road · 2 min halt
                                                              26. 2:05 AMGAYAGaya Jn · 5 min halt
                                                              3:28 AM+2 daysKQRKoderma

                                                          Alternatives

                                                          Start from a nearby station

                                                          End at a nearby station

                                                          Change at a different city

                                                          Other dates

                                                          Search another date

                                                          Frequently asked questions

                                                          Is there a direct train from Thane to Koderma?
                                                          No direct train on a typical day. The fastest option is Train 22183 → Prayagraj → Train 12802, taking 31 h 35 min in total.
                                                          What is the fastest way from Thane to Koderma?
                                                          Train 22183 → Prayagraj → Train 12802: 31 h 35 min in total, including a safe connection buffer.
                                                          What is the cheapest way from Thane to Koderma?
                                                          From about ₹385 (estimate): Train 01051 → Prayagraj → Train 65118 → Varanasi → Train 53522.
                                                          When are the first and last departures from Thane to Koderma?
                                                          The first departure is at 00:18 and the last at 23:58 on a typical day.
                                                          Where can I change between Thane and Koderma?
                                                          Combinations change at Prayagraj, Chalisgaon, Kalyan, Nashik.

                                                          Timetable data as of 2026-11-18. Always verify on the operator or partner site.