Skip to main content

Train & bus from Patna to Prayagraj

186 direct trains, no direct bus and 82 bus + train combinations connect Patna and Prayagraj. Fastest: 4 h 25 min. Fares from ₹85 (est.). First departure 00:03, last 23:54.

Times for a typical Wednesday — check your dateCheck your travel date

Quick picks

  • Fastest

    Train 1230919:45–00:10 · 4 h 25 min · from ₹715 (est.)
  • Cheapest

    Train 11402→ Mirzapur →Train 5410323:10–08:45 · 9 h 35 min · from ₹85 (est.)
  • Fewest changes

    Train 1230919:45–00:10 · 4 h 25 min · from ₹715 (est.)

All direct trains (186)

Bus + train and other combinations (82)

via Buxar · 17 routes · best 7 h 57 min

  1. Option 1: 4:55 PM12:52 AM+1 day

    7 h 57 min1 changeSmallest buffer: 184 minfrom ₹525 (est.)

    via Buxar

    • Different change city
    1. 4:55 PMPNBEPatna Jn

      Train12367Vikramshila Express

      Starts from Bhagalpur (BGP) on Wed, 18 Nov at 11:55 (11:55 AM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 07:35

      Runs: Daily

      Indian Railways · 1 h 15 min · 117 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹50SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

      1 stop — Show or hide intermediate stops
      1. 5:28 PMARAAra · 2 min halt
      6:10 PMBXRBuxar
    2. Change at Buxar

      • Same station, no local travel
      • Safety buffer: 184 min (3 h 4 min) Total wait: 184 min
    3. 9:14 PMBXRBuxar

      Train12569Jaynagar-delhi Anandvihart Garib Rath

      Starts from Jaynagar (JYG) on Wed, 18 Nov at 12:10 (12:10 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 08:25

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 3 h 38 min · 247 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3E ₹475(est.)

      1 stop — Show or hide intermediate stops
      1. 10:42 PMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
      12:52 AM+1 dayPRYJPrayagraj Jn
All 17 combinations via Buxar
  1. Option 2: 4:40 PM12:52 AM+1 day

    8 h 12 min1 changeSmallest buffer: 206 minfrom ₹520 (est.)

    via Buxar

    1. 4:40 PMDNRDanapur

      Train20934Udhna SF Express

      Starts from Danapur (DNR) on Wed, 18 Nov at 16:40 (4:40 PM) · you board on day 1

      Ends at Udhna Jn (UDN) at Thu, 19 Nov 21:05

      Runs: Sun, Wed

      Indian Railways · 1 h 8 min · 108 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹45SL ₹1603A ₹5202A ₹710(est.)

      1 stop — Show or hide intermediate stops
      1. 5:06 PMARAAra · 2 min halt
      5:48 PMBXRBuxar
    2. Change at Buxar

      • Same station, no local travel
      • Safety buffer: 206 min (3 h 26 min) Total wait: 206 min
    3. 9:14 PMBXRBuxar

      Train12569Jaynagar-delhi Anandvihart Garib Rath

      Starts from Jaynagar (JYG) on Wed, 18 Nov at 12:10 (12:10 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 08:25

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 3 h 38 min · 247 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3E ₹475(est.)

      1 stop — Show or hide intermediate stops
      1. 10:42 PMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
      12:52 AM+1 dayPRYJPrayagraj Jn
  2. Option 3: 4:55 PM1:35 AM+1 day

    8 h 40 min1 changeSmallest buffer: 198 minfrom ₹135 (est.)

    via Buxar

    1. 4:55 PMPNBEPatna Jn

      Train12367Vikramshila Express

      Starts from Bhagalpur (BGP) on Wed, 18 Nov at 11:55 (11:55 AM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 07:35

      Runs: Daily

      Indian Railways · 1 h 15 min · 117 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹50SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

      1 stop — Show or hide intermediate stops
      1. 5:28 PMARAAra · 2 min halt
      6:10 PMBXRBuxar
    2. Change at Buxar

      • Same station, no local travel
      • Safety buffer: 198 min (3 h 18 min) Total wait: 198 min
    3. 9:28 PMBXRBuxar

      Train12296Sanghamitra SF Express

      Starts from Danapur (DNR) on Wed, 18 Nov at 20:15 (8:15 PM) · you board on day 1

      Ends at Smvt Bengaluru (SMVB) at Fri, 20 Nov 16:10

      Runs: Daily

      Indian Railways · 4 h 7 min · 240 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹85SL ₹1803A ₹5202A ₹7101A ₹1,155(est.)

      3 stops — Show or hide intermediate stops
      1. 9:51 PMDLNDildarnagar Jn · 2 min halt
      2. 11:13 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      3. 12:20 AMMZPMirzapur · 5 min halt
      1:35 AM+1 dayPCOIPrayagraj Chheoki
Search another date

via Ara · 13 routes · best 8 h 5 min

  1. Option 1: 6:10 PM2:15 AM+1 day

    8 h 5 min1 changeSmallest buffer: 186 minfrom ₹100 (est.)

    via Ara

    • Different change city
    1. 6:10 PMDNRDanapur

      Train06510Ksr Bengaluru Special Fare Clone Special

      Starts from Danapur (DNR) on Wed, 18 Nov at 18:10 (6:10 PM) · you board on day 1

      Ends at Ksr Bengaluru (SBC) at Fri, 20 Nov 18:20

      Runs: Wed

      Indian Railways · 29 min · 39 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10SL ₹1303A ₹475(est.)

      6:39 PMARAAra
    2. Change at Ara

      • Same station, no local travel
      • Safety buffer: 186 min (3 h 6 min) Total wait: 186 min
    3. 9:45 PMARAAra

      Train03293Anand Vihar Terminal Special Fare Festival Special

      Starts from Patna Jn (PNBE) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 13:00

      Runs: Daily

      Indian Railways · 4 h 30 min · 321 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹90SL ₹1953A ₹500(est.)

      2 stops — Show or hide intermediate stops
      1. 10:28 PMBXRBuxar · 2 min halt
      2. 12:03 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      2:15 AM+1 daySFGSubedarganj
All 13 combinations via Ara
  1. Option 2: 7:55 PM4:50 AM+1 day

    8 h 55 min1 changeSmallest buffer: 204 minfrom ₹115 (est.)

    via Ara

    1. 7:55 PMDNRDanapur

      Train12393Sampoorna Kranti Express

      Starts from Rajendra Nagar Terminal (RJPB) on Wed, 18 Nov at 19:20 (7:20 PM) · you board on day 1

      Ends at New Delhi (NDLS) at Thu, 19 Nov 08:05

      Runs: Daily

      Indian Railways · 25 min · 40 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹25SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

      8:20 PMARAAra
    2. Change at Ara

      • Same station, no local travel
      • Safety buffer: 204 min (3 h 24 min) Total wait: 204 min
    3. 11:44 PMARAAra

      Train11402Supaul - Pune Express

      Starts from Supaul (SOU) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 1

      Ends at Pune Jn (PUNE) at Fri, 20 Nov 04:00

      Runs: Daily

      Indian Railways · 5 h 6 min · 308 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹90SL ₹1903A ₹4852A ₹680(est.)

      3 stops — Show or hide intermediate stops
      1. 12:25 AMBXRBuxar · 2 min halt
      2. 2:38 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
      3. 3:38 AMMZPMirzapur · 2 min halt
      4:50 AM+1 dayPCOIPrayagraj Chheoki
  2. Option 3: 3:50 PM12:52 AM+1 day

    9 h 2 min1 changeSmallest buffer: 246 minfrom ₹500 (est.)

    via Ara

    1. 3:50 PMDNRDanapur

      Train13257Anand Vihar Terminal Jan Sadharan Express

      Starts from Danapur (DNR) on Wed, 18 Nov at 15:50 (3:50 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 10:25

      Runs: Daily

      Indian Railways · 28 min · 39 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹10SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)

      4:18 PMARAAra
    2. Change at Ara

      • Same station, no local travel
      • Safety buffer: 246 min (4 h 6 min) Total wait: 246 min

      Partner link

      Long wait at Ara?

      Find a room near Ara
    3. 8:24 PMARAAra

      Train12569Jaynagar-delhi Anandvihart Garib Rath

      Starts from Jaynagar (JYG) on Wed, 18 Nov at 12:10 (12:10 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 08:25

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 4 h 28 min · 315 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3E ₹490(est.)

      3 stops — Show or hide intermediate stops
      1. 8:55 PMDUREDumraon · 1 min halt
      2. 9:12 PMBXRBuxar · 2 min halt
      3. 10:42 PMDDUPt. Deen Dayal Upadhyaya Jn · 20 min halt
      12:52 AM+1 dayPRYJPrayagraj Jn
Search another date

via Varanasi · 43 routes · best 8 h 6 min

  1. Option 1: 9:58 PM6:04 AM+1 day

    8 h 6 min1 changeSmallest buffer: 192 minfrom ₹670 (est.)

    via Varanasi

    1. 9:58 PMDNRDanapur

      Train12423Dibrugarh - New Delhi Rajdhani Express

      Starts from Dibrugarh (DBRG) on Tue, 17 Nov at 20:35 (8:35 PM) · you board on day 2

      This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at New Delhi (NDLS) at Thu, 19 Nov 10:30

      Runs: Daily

      Indian Railways · 2 h 55 min · 202 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹6302A ₹8651A ₹1,410(est.)

      12:53 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn
    2. Change at Varanasi

      • Same station, no local travel
      • Safety buffer: 192 min (3 h 12 min) Total wait: 192 min

      Night-time change — plan safe waiting and local transport

      Partner link

      Long wait at Varanasi?

      Find a room near Pt. Deen Dayal Upadhyaya Jn
    3. 4:05 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

      Train14083Sikkim Mahananda Express

      Starts from Alipur Duar Jn (APDJ) on Wed, 18 Nov at 07:15 (7:15 AM) · you board on day 2

      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at Delhi Jn (DLI) at Thu, 19 Nov 18:10

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 1 h 59 min · 146 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹40SL ₹1303A ₹4752A ₹665(est.)

      2 stops — Show or hide intermediate stops
      1. 4:59 AMMZPMirzapur · 1 min halt
      2. 5:11 AMBDLVindhyachal · 1 min halt
      6:04 AM+1 dayNYNNaini
All 43 combinations via Varanasi
  1. Option 2: 4:40 PM12:52 AM+1 day

    8 h 12 min1 changeSmallest buffer: 182 minfrom ₹550 (est.)

    via Varanasi

    1. 4:40 PMDNRDanapur

      Train20934Udhna SF Express

      Starts from Danapur (DNR) on Wed, 18 Nov at 16:40 (4:40 PM) · you board on day 1

      Ends at Udhna Jn (UDN) at Thu, 19 Nov 21:05

      Runs: Sun, Wed

      Indian Railways · 3 h 20 min · 202 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹75SL ₹1603A ₹5202A ₹710(est.)

      2 stops — Show or hide intermediate stops
      1. 5:06 PMARAAra · 2 min halt
      2. 5:48 PMBXRBuxar · 2 min halt
      8:00 PMDDUPt. Deen Dayal Upadhyaya Jn
    2. Change at Varanasi

      • Same station, no local travel
      • Safety buffer: 182 min (3 h 2 min) Total wait: 182 min
    3. 11:02 PMDDUPt. Deen Dayal Upadhyaya Jn

      Train12569Jaynagar-delhi Anandvihart Garib Rath

      Starts from Jaynagar (JYG) on Wed, 18 Nov at 12:10 (12:10 PM) · you board on day 1

      Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 08:25

      Runs: Daily · Running days not verified — check before booking

      Indian Railways · 1 h 50 min · 152 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3E ₹475(est.)

      12:52 AM+1 dayPRYJPrayagraj Jn
  2. Option 3: 6:10 PM2:30 AM+1 day

    8 h 20 min1 changeSmallest buffer: 206 minfrom ₹690 (est.)

    via Varanasi

    1. 6:10 PMDNRDanapur

      Train06510Ksr Bengaluru Special Fare Clone Special

      Starts from Danapur (DNR) on Wed, 18 Nov at 18:10 (6:10 PM) · you board on day 1

      Ends at Ksr Bengaluru (SBC) at Fri, 20 Nov 18:20

      Runs: Wed

      Indian Railways · 3 h 4 min · 202 km

      Scheduled timetable. From the published timetable. Delays are possible.

      GN ₹60SL ₹1303A ₹475(est.)

      1 stop — Show or hide intermediate stops
      1. 6:39 PMARAAra · 2 min halt
      9:14 PMDDUPt. Deen Dayal Upadhyaya Jn
    2. Change at Varanasi

      • Same station, no local travel
      • Safety buffer: 206 min (3 h 26 min) Total wait: 206 min

      Night-time change — plan safe waiting and local transport

    3. 12:40 AM+1 dayDDUPt. Deen Dayal Upadhyaya Jn

      Train22811Bhubaneswar - New Delhi Tejas Rajdhani Express

      Starts from Bhubaneswar (BBS) on Wed, 18 Nov at 10:35 (10:35 AM) · you board on day 2

      This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

      Ends at New Delhi (NDLS) at Thu, 19 Nov 09:55

      Runs: Sun, Wed

      Indian Railways · 1 h 50 min · 155 km

      Scheduled timetable. From the published timetable. Delays are possible.

      3A ₹6302A ₹8651A ₹1,410(est.)

      2:30 AM+1 dayPRYJPrayagraj Jn
Search another date

via Mirzapur · 6 routes · best 8 h 55 min

    All 6 combinations via Mirzapur
    1. Option 2: 7:55 PM4:50 AM+1 day

      8 h 55 min1 changeSmallest buffer: 259 minfrom ₹120 (est.)

      via Mirzapur

      1. 7:55 PMDNRDanapur

        Train12393Sampoorna Kranti Express

        Starts from Rajendra Nagar Terminal (RJPB) on Wed, 18 Nov at 19:20 (7:20 PM) · you board on day 1

        Ends at New Delhi (NDLS) at Thu, 19 Nov 08:05

        Runs: Daily

        Indian Railways · 3 h 26 min · 268 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹95SL ₹1953A ₹5202A ₹7101A ₹1,155(est.)

        2 stops — Show or hide intermediate stops
        1. 8:20 PMARAAra · 2 min halt
        2. 10:23 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        11:21 PMMZPMirzapur
      2. Change at Mirzapur

        • Same station, no local travel
        • Safety buffer: 259 min (4 h 19 min) Total wait: 259 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Mirzapur?

        Find a room near Mirzapur
      3. 3:40 AM+1 dayMZPMirzapur

        Train11402Supaul - Pune Express

        Starts from Supaul (SOU) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Pune Jn (PUNE) at Fri, 20 Nov 04:00

        Runs: Daily

        Indian Railways · 1 h 10 min · 80 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹25SL ₹1303A ₹4752A ₹665(est.)

        4:50 AM+1 dayPCOIPrayagraj Chheoki
    2. Option 3: 3:17 AM12:15 PM

      8 h 58 min1 changeSmallest buffer: 185 minfrom ₹120 (est.)

      via Mirzapur

      • Different change city
      1. 3:17 AMDNRDanapur

        Train15483Sikkim Mahananda Express

        Starts from Alipur Duar Jn (APDJ) on Tue, 17 Nov at 10:30 (10:30 AM) · you board on day 2

        This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Delhi Jn (DLI) at Wed, 18 Nov 21:45

        Runs: Daily

        Indian Railways · 4 h 33 min · 268 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹80SL ₹1653A ₹4752A ₹6651A ₹1,080(est.)

        3 stops — Show or hide intermediate stops
        1. 3:45 AMARAAra · 2 min halt
        2. 4:40 AMBXRBuxar · 2 min halt
        3. 6:48 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        7:50 AMMZPMirzapur
      2. Change at Mirzapur

        • Same station, no local travel
        • Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
      3. 10:55 AMMZPMirzapur

        Train12307Jodhpur Superfast Express

        Starts from Howrah Jn (HWH) on Tue, 17 Nov at 23:30 (11:30 PM) · you board on day 2

        This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Jodhpur Jn (JU) at Thu, 19 Nov 05:15

        Runs: Sun, Tue, Wed, Sat

        Indian Railways · 1 h 20 min · 89 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹40SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)

        12:15 PMPRYJPrayagraj Jn
    3. Option 4: 7:55 PM5:05 AM+1 day

      9 h 10 min1 changeSmallest buffer: 264 minfrom ₹120 (est.)

      via Mirzapur

      1. 7:55 PMDNRDanapur

        Train12393Sampoorna Kranti Express

        Starts from Rajendra Nagar Terminal (RJPB) on Wed, 18 Nov at 19:20 (7:20 PM) · you board on day 1

        Ends at New Delhi (NDLS) at Thu, 19 Nov 08:05

        Runs: Daily

        Indian Railways · 3 h 26 min · 268 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹95SL ₹1953A ₹5202A ₹7101A ₹1,155(est.)

        2 stops — Show or hide intermediate stops
        1. 8:20 PMARAAra · 2 min halt
        2. 10:23 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
        11:21 PMMZPMirzapur
      2. Change at Mirzapur

        • Same station, no local travel
        • Safety buffer: 264 min (4 h 24 min) Total wait: 264 min

        Night-time change — plan safe waiting and local transport

        Partner link

        Long wait at Mirzapur?

        Find a room near Mirzapur
      3. 3:45 AM+1 dayMZPMirzapur

        Train13007Udyan Abha Toofan Express

        Starts from Howrah Jn (HWH) on Wed, 18 Nov at 09:35 (9:35 AM) · you board on day 2

        This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.

        Ends at Shri Ganganagar (SGNR) at Fri, 20 Nov 07:10

        Runs: Daily · Running days not verified — check before booking

        Indian Railways · 1 h 20 min · 89 km

        Scheduled timetable. From the published timetable. Delays are possible.

        GN ₹25SL ₹1303A ₹475(est.)

        1 stop — Show or hide intermediate stops
        1. 3:54 AMBDLVindhyachal · 1 min halt
        5:05 AM+1 dayPRYJPrayagraj Jn
    Search another date

    via Ara · 2 routes · best 9 h 15 min

      All 2 combinations via Ara
      1. Option 2: 5:00 PM2:15 AM+1 day

        9 h 15 min1 changeSmallest buffer: 190 minfrom ₹150 (est.)

        via Ara

        1. 5:00 PMPatna Bus Stand

          BusState RTC (estimated) Ordinary

          State RTC (estimated) · 1 h 20 min · 54 km · Runs every 60 min

          Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

          Ordinary ₹60(est.)

          Buy at bus stand · every 60 min

          6:20 PMAra Bus Stand
        2. Change at Ara

          • Local transit: 15 min · Ara Bus Stand → Ara (ARA)
          • Safety buffer: 190 min (3 h 10 min) Total wait: 205 min

          Station change — you must travel to a different station or bus stand

        3. 9:45 PMARAAra

          Train03293Anand Vihar Terminal Special Fare Festival Special

          Starts from Patna Jn (PNBE) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1

          Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 13:00

          Runs: Daily

          Indian Railways · 4 h 30 min · 321 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹90SL ₹1953A ₹500(est.)

          2 stops — Show or hide intermediate stops
          1. 10:28 PMBXRBuxar · 2 min halt
          2. 12:03 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
          2:15 AM+1 daySFGSubedarganj
      2. Option 3: 9:00 AM2:15 AM+1 day

        17 h 15 min1 changeSmallest buffer: 670 minfrom ₹150 (est.)

        via Ara

        1. 9:00 AMPatna Bus Stand

          BusState RTC (estimated) Ordinary

          State RTC (estimated) · 1 h 20 min · 54 km · Runs every 60 min

          Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.

          Ordinary ₹60(est.)

          Buy at bus stand · every 60 min

          10:20 AMAra Bus Stand
        2. Change at Ara

          • Local transit: 15 min · Ara Bus Stand → Ara (ARA)
          • Safety buffer: 670 min (11 h 10 min) Total wait: 685 min

          Station change — you must travel to a different station or bus stand

          Partner link

          Long wait at Ara?

          Find a room near Ara
        3. 9:45 PMARAAra

          Train03293Anand Vihar Terminal Special Fare Festival Special

          Starts from Patna Jn (PNBE) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1

          Ends at Anand Vihar Terminal (ANVT) at Thu, 19 Nov 13:00

          Runs: Daily

          Indian Railways · 4 h 30 min · 321 km

          Scheduled timetable. From the published timetable. Delays are possible.

          GN ₹90SL ₹1953A ₹500(est.)

          2 stops — Show or hide intermediate stops
          1. 10:28 PMBXRBuxar · 2 min halt
          2. 12:03 AMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
          2:15 AM+1 daySFGSubedarganj

      via Gaya · 1 route · best 9 h 35 min

        All 1 combinations via Gaya
        1. Option 2: 3:00 PM12:35 AM+1 day

          9 h 35 min1 changeSmallest buffer: 180 minfrom ₹140 (est.)

          via Gaya

          1. 3:00 PMPNBEPatna Jn

            Train03253Charlapalli Special Fare Special

            Starts from Patna Jn (PNBE) on Wed, 18 Nov at 15:00 (3:00 PM) · you board on day 1

            Ends at Charlapalli (CHZ) at Fri, 20 Nov 03:30

            Runs: Mon, Wed

            Indian Railways · 2 h · 92 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹25SL ₹1303A ₹475(est.)

            2 stops — Show or hide intermediate stops
            1. 3:38 PMTEATaregna · 2 min halt
            2. 3:58 PMJHDJehanabad · 2 min halt
            5:00 PMGAYAGaya Jn
          2. Change at Gaya

            • Same station, no local travel
            • Safety buffer: 180 min (3 h) Total wait: 180 min
          3. 8:00 PMGAYAGaya Jn

            Train12319Gwalior SF Express

            Starts from Kolkatta Terminal (KOAA) on Wed, 18 Nov at 13:10 (1:10 PM) · you board on day 1

            Ends at Gwalior Jn (GWL) at Thu, 19 Nov 13:10

            Runs: Wed

            Indian Railways · 4 h 35 min · 360 km

            Scheduled timetable. From the published timetable. Delays are possible.

            GN ₹115SL ₹2403A ₹5902A ₹8101A ₹1,325(est.)

            1 stop — Show or hide intermediate stops
            1. 10:33 PMDDUPt. Deen Dayal Upadhyaya Jn · 7 min halt
            12:35 AM+1 dayPRYJPrayagraj Jn

        Alternatives

        Change at a different city

        Other dates

        Search another date

        Frequently asked questions

        Is there a direct train from Patna to Prayagraj?
        Yes. 186 direct trains run on a typical day; the fastest is 12309 Rajendra Nagar - New Delhi Tejas Rajdhani Express at 4 h 25 min.
        What is the fastest way from Patna to Prayagraj?
        Train 12309: 4 h 25 min in total, including a safe connection buffer.
        What is the cheapest way from Patna to Prayagraj?
        From about ₹85 (estimate): Train 11402 → Mirzapur → Train 54103.
        When are the first and last departures from Patna to Prayagraj?
        The first departure is at 00:03 and the last at 23:54 on a typical day.
        Where can I change between Patna and Prayagraj?
        Combinations change at Buxar, Ara, Varanasi, Mirzapur.

        Timetable data as of 2026-11-18. Always verify on the operator or partner site.