Train & bus from Hingoli to Vapi
No direct train, no direct bus and 200 bus + train combinations connect Hingoli and Vapi. Fastest: 15 h 54 min via Surat. Fares from ₹120 (est.). First departure 00:05, last 23:50.
No direct train — best combinations below.
Times for a typical Wednesday — check your dateCheck your travel date
Quick picks
Fastest
Train 17295→ Surat →Train 5901002:35–18:29 · 15 h 54 min · from ₹170 (est.)Cheapest
Train 17295→ Akola →Train 59026→ Surat →Train 5946002:35–04:09 · 25 h 34 min · from ₹120 (est.)Fewest changes
Train 17295→ Surat →Train 5901002:35–18:29 · 15 h 54 min · from ₹170 (est.)
Bus + train and other combinations (200)
via Surat · 27 routes · best 15 h 54 min
Option 1: 2:35 AM6:29 PM
15 h 54 min1 changeSmallest buffer: 180 minfrom ₹170 (est.)
via Surat
- Best
- Fastest
- Earliest arrival
- Fewest changes
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 57 min · 82 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
13 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
- 4:52 PMMRLMaroli · 2 min halt
- 5:01 PMNVSNavsari · 2 min halt
- 5:14 PMVDHVedchha · 2 min halt
- 5:21 PMACLAncheli · 2 min halt
- 5:27 PMAMLAmalsad · 2 min halt
- 5:34 PMBIMBilimora Jn · 2 min halt
- 5:40 PMJRSJoravasan · 2 min halt
- 5:47 PMDGIDungri · 2 min halt
- 6:05 PMBLValsad · 5 min halt
- 6:16 PMATULAtul · 2 min halt
- 6:21 PMPADPardi · 2 min halt
6:29 PMUVDUdvada
All 27 combinations via Surat
Option 2: 2:35 AM6:43 PM
16 h 8 min1 changeSmallest buffer: 180 minfrom ₹175 (est.)
via Surat
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 2 h 11 min · 92 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹15(est.)
14 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
- 4:52 PMMRLMaroli · 2 min halt
- 5:01 PMNVSNavsari · 2 min halt
- 5:14 PMVDHVedchha · 2 min halt
- 5:21 PMACLAncheli · 2 min halt
- 5:27 PMAMLAmalsad · 2 min halt
- 5:34 PMBIMBilimora Jn · 2 min halt
- 5:40 PMJRSJoravasan · 2 min halt
- 5:47 PMDGIDungri · 2 min halt
- 6:05 PMBLValsad · 5 min halt
- 6:16 PMATULAtul · 2 min halt
- 6:21 PMPADPardi · 2 min halt
- 6:29 PMUVDUdvada · 2 min halt
6:43 PMVAPIVapi
Option 3: 2:35 AM7:03 PM
16 h 28 min1 changeSmallest buffer: 205 minfrom ₹190 (est.)
via Surat
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 205 min (3 h 25 min) Total wait: 230 min
Station change — you must travel to a different station or bus stand
- 5:22 PMSTSurat
Train19020Bandra Terminus Express
Starts from Haridwar Jn (HW) on Tue, 17 Nov at 13:30 (1:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 22:30
Runs: Daily
Indian Railways · 1 h 41 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
3 stops — Show or hide intermediate stops
- 5:48 PMNVSNavsari · 2 min halt
- 6:08 PMBIMBilimora Jn · 2 min halt
- 6:30 PMBLValsad · 5 min halt
7:03 PMVAPIVapi
via Nashik · 3 routes · best 16 h 15 min
Option 1: 4:15 AM8:30 PM
16 h 15 min1 changeSmallest buffer: 223 minfrom ₹350 (est.)
via Nashik
- Different change city
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 8 h 27 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹190CC ₹615(est.)
8 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
12:42 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 223 min (3 h 43 min) Total wait: 258 min
Station change — you must travel to a different station or bus stand
- 5:00 PMNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
8:30 PMVapi Bus Stand
All 3 combinations via Nashik
Option 2: 4:15 AM11:00 PM
18 h 45 min1 changeSmallest buffer: 403 minfrom ₹410 (est.)
via Nashik
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 8 h 27 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹190CC ₹615(est.)
8 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
12:42 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 403 min (6 h 43 min) Total wait: 438 min
Station change — you must travel to a different station or bus stand
- 8:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
11:00 PMDaman Bus Stand
Option 3: 4:15 AM1:00 AM+1 day
20 h 45 min1 changeSmallest buffer: 523 minfrom ₹410 (est.)
via Nashik
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 8 h 27 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹190CC ₹615(est.)
8 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
12:42 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 523 min (8 h 43 min) Total wait: 558 min
Station change — you must travel to a different station or bus stand
- 10:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
1:00 AM+1 dayDaman Bus Stand
via Thane · 4 routes · best 18 h 22 min
Option 1: 4:15 AM10:37 PM
18 h 22 min1 changeSmallest buffer: 209 minfrom ₹275 (est.)
via Thane
- Different change city
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 209 min (3 h 29 min) Total wait: 264 min
Station change — you must travel to a different station or bus stand
- 8:24 PMBVIBorivali
Train19143Lokshakti Express
Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 19:40 (7:40 PM) · you board on day 1
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 04:50
Runs: Daily · Running days not verified — check before booking
Indian Railways · 2 h 13 min · 137 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹40SL ₹1303A ₹4752A ₹665(est.)
5 stops — Show or hide intermediate stops
- 8:56 PMVRVirar · 2 min halt
- 9:12 PMSAHSaphale · 2 min halt
- 9:26 PMPLGPalghar · 2 min halt
- 9:39 PMBORBoisar · 2 min halt
- 10:01 PMDRDDahanu Road · 2 min halt
10:37 PMVAPIVapi
All 4 combinations via Thane
Option 2: 4:15 AM10:38 PM
18 h 23 min1 changeSmallest buffer: 199 minfrom ₹275 (est.)
via Thane
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 199 min (3 h 19 min) Total wait: 254 min
Station change — you must travel to a different station or bus stand
- 8:14 PMBVIBorivali
Train19017Vadnagar Lokshakti Exp
Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 19:40 (7:40 PM) · you board on day 1
Ends at Vadnagar (VDG) at Thu, 19 Nov 06:40
Runs: Daily
Indian Railways · 2 h 24 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹40SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
6 stops — Show or hide intermediate stops
- 8:43 PMVRVirar · 2 min halt
- 9:03 PMSAHSaphale · 2 min halt
- 9:18 PMPLGPalghar · 2 min halt
- 9:33 PMBORBoisar · 2 min halt
- 9:53 PMDRDDahanu Road · 2 min halt
- 10:18 PMUBRUmbargam Road · 2 min halt
10:38 PMVAPIVapi
Option 3: 4:15 AM10:48 PM
18 h 33 min1 changeSmallest buffer: 269 minfrom ₹290 (est.)
via Thane
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 269 min (4 h 29 min) Total wait: 324 min
Station change — you must travel to a different station or bus stand
- 9:24 PMBVIBorivali
Train12961Avantika SF Express
Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 20:55 (8:55 PM) · you board on day 1
Ends at Indore Jn (INDB) at Thu, 19 Nov 09:05
Runs: Daily
Indian Railways · 1 h 24 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹55SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)
10:48 PMVAPIVapi
via Malkapur · 14 routes · best 18 h 23 min
All 14 combinations via Malkapur
Option 2: 1:00 PM7:23 AM+1 day
18 h 23 min2 changesSmallest buffer: 180 minfrom ₹835 (est.)
via Malkapur · Surat
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 4 h · 216 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹80SL ₹1703A ₹5202A ₹710(est.)
3 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
5:00 PMMKUMalkapur Change at Malkapur
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 8:00 PMMKUMalkapur
Train12843Ahmedabad SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 17:30 (5:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 06:25
Runs: Tue, Thu, Fri, Sat
Indian Railways · 6 h 33 min · 385 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2553A ₹6202A ₹855(est.)
4 stops — Show or hide intermediate stops
- 8:50 PMBSLBhusaval Jn · 5 min halt
- 9:20 PMJLJalgaon Jn · 3 min halt
- 10:03 PMDXGDharangaon · 2 min halt
- 11:54 PMNDBNandurbar · 5 min halt
2:33 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 225 min (3 h 45 min) Total wait: 225 min
Night-time change — plan safe waiting and local transport
- 6:18 AM+1 daySTSurat
Train12954Hazrat Nizamuddin - Mumbai Central Tejas Rajdhani Express
Starts from Hazrat Nizamuddin Jn (NZM) on Wed, 18 Nov at 17:15 (5:15 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Central (MMCT) at Thu, 19 Nov 10:05
Runs: Daily
Indian Railways · 1 h 5 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.3A ₹6302A ₹8651A ₹1,410(est.)
1 stop — Show or hide intermediate stops
- 7:03 AMBLValsad · 2 min halt
7:23 AM+1 dayVAPIVapi
Option 3: 1:00 PM8:08 AM+1 day
19 h 8 min2 changesSmallest buffer: 180 minfrom ₹250 (est.)
via Malkapur · Surat
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 4 h · 216 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹80SL ₹1703A ₹5202A ₹710(est.)
3 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
5:00 PMMKUMalkapur Change at Malkapur
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 8:00 PMMKUMalkapur
Train12843Ahmedabad SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 17:30 (5:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 06:25
Runs: Tue, Thu, Fri, Sat
Indian Railways · 6 h 33 min · 385 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2553A ₹6202A ₹855(est.)
4 stops — Show or hide intermediate stops
- 8:50 PMBSLBhusaval Jn · 5 min halt
- 9:20 PMJLJalgaon Jn · 3 min halt
- 10:03 PMDXGDharangaon · 2 min halt
- 11:54 PMNDBNandurbar · 5 min halt
2:33 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 269 min (4 h 29 min) Total wait: 269 min
Night-time change — plan safe waiting and local transport
- 7:02 AM+1 daySTSurat
Train22908Madgaon Weekly SF Express
Starts from Hapa (HAPA) on Wed, 18 Nov at 21:40 (9:40 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Madgaon (MAO) at Thu, 19 Nov 22:00
Runs: Wed
Indian Railways · 1 h 6 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1603A ₹5202A ₹710(est.)
8:08 AM+1 dayVAPIVapi
Option 4: 1:00 PM8:27 AM+1 day
19 h 27 min2 changesSmallest buffer: 180 minfrom ₹235 (est.)
via Malkapur · Surat
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 4 h · 216 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹80SL ₹1703A ₹5202A ₹710(est.)
3 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
5:00 PMMKUMalkapur Change at Malkapur
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 8:00 PMMKUMalkapur
Train12843Ahmedabad SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 17:30 (5:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 06:25
Runs: Tue, Thu, Fri, Sat
Indian Railways · 6 h 33 min · 385 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2553A ₹6202A ₹855(est.)
4 stops — Show or hide intermediate stops
- 8:50 PMBSLBhusaval Jn · 5 min halt
- 9:20 PMJLJalgaon Jn · 3 min halt
- 10:03 PMDXGDharangaon · 2 min halt
- 11:54 PMNDBNandurbar · 5 min halt
2:33 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 272 min (4 h 32 min) Total wait: 272 min
Night-time change — plan safe waiting and local transport
- 7:05 AM+1 daySTSurat
Train19132Bhuj - Mumbai Bandra Kutch Exp
Starts from Bhuj (BHUJ) on Wed, 18 Nov at 19:50 (7:50 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 11:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 22 min · 97 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹665(est.)
2 stops — Show or hide intermediate stops
- 7:27 AMNVSNavsari · 2 min halt
- 8:03 AMBLValsad · 2 min halt
8:27 AM+1 dayVAPIVapi
via Washim · 14 routes · best 18 h 24 min
All 14 combinations via Washim
Option 2: 12:05 AM6:29 PM
18 h 24 min2 changesSmallest buffer: 180 minfrom ₹170 (est.)
via Washim · Surat
- 12:05 AMMLSUMalsailu
Train57584Purna Akola Passenger
Starts from Purna Jn (PAU) on Tue, 17 Nov at 22:00 (10:00 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Akola Jn (AK) at Wed, 18 Nov 03:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 38 min · 32 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 12:14 AMKNRGKanhargaon Naka · 1 min halt
- 12:24 AMPGGPenganga · 1 min halt
- 12:34 AMKKGKekatumar · 1 min halt
12:43 AMWHMWashim Change at Washim
- Same station, no local travel
- Safety buffer: 192 min (3 h 12 min) Total wait: 192 min
Night-time change — plan safe waiting and local transport
- 3:55 AMWHMWashim
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 9 h 37 min · 550 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹150SL ₹3003A ₹7752A ₹1,0901A ₹1,795(est.)
8 stops — Show or hide intermediate stops
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 57 min · 82 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
13 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
- 4:52 PMMRLMaroli · 2 min halt
- 5:01 PMNVSNavsari · 2 min halt
- 5:14 PMVDHVedchha · 2 min halt
- 5:21 PMACLAncheli · 2 min halt
- 5:27 PMAMLAmalsad · 2 min halt
- 5:34 PMBIMBilimora Jn · 2 min halt
- 5:40 PMJRSJoravasan · 2 min halt
- 5:47 PMDGIDungri · 2 min halt
- 6:05 PMBLValsad · 5 min halt
- 6:16 PMATULAtul · 2 min halt
- 6:21 PMPADPardi · 2 min halt
6:29 PMUVDUdvada
Option 3: 12:05 AM6:43 PM
18 h 38 min2 changesSmallest buffer: 180 minfrom ₹175 (est.)
via Washim · Surat
- 12:05 AMMLSUMalsailu
Train57584Purna Akola Passenger
Starts from Purna Jn (PAU) on Tue, 17 Nov at 22:00 (10:00 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Akola Jn (AK) at Wed, 18 Nov 03:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 38 min · 32 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 12:14 AMKNRGKanhargaon Naka · 1 min halt
- 12:24 AMPGGPenganga · 1 min halt
- 12:34 AMKKGKekatumar · 1 min halt
12:43 AMWHMWashim Change at Washim
- Same station, no local travel
- Safety buffer: 192 min (3 h 12 min) Total wait: 192 min
Night-time change — plan safe waiting and local transport
- 3:55 AMWHMWashim
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 9 h 37 min · 550 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹150SL ₹3003A ₹7752A ₹1,0901A ₹1,795(est.)
8 stops — Show or hide intermediate stops
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 2 h 11 min · 92 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹15(est.)
14 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
- 4:52 PMMRLMaroli · 2 min halt
- 5:01 PMNVSNavsari · 2 min halt
- 5:14 PMVDHVedchha · 2 min halt
- 5:21 PMACLAncheli · 2 min halt
- 5:27 PMAMLAmalsad · 2 min halt
- 5:34 PMBIMBilimora Jn · 2 min halt
- 5:40 PMJRSJoravasan · 2 min halt
- 5:47 PMDGIDungri · 2 min halt
- 6:05 PMBLValsad · 5 min halt
- 6:16 PMATULAtul · 2 min halt
- 6:21 PMPADPardi · 2 min halt
- 6:29 PMUVDUdvada · 2 min halt
6:43 PMVAPIVapi
Option 4: 12:05 AM7:03 PM
18 h 58 min2 changesSmallest buffer: 192 minfrom ₹190 (est.)
via Washim · Surat
- 12:05 AMMLSUMalsailu
Train57584Purna Akola Passenger
Starts from Purna Jn (PAU) on Tue, 17 Nov at 22:00 (10:00 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Akola Jn (AK) at Wed, 18 Nov 03:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 38 min · 32 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 12:14 AMKNRGKanhargaon Naka · 1 min halt
- 12:24 AMPGGPenganga · 1 min halt
- 12:34 AMKKGKekatumar · 1 min halt
12:43 AMWHMWashim Change at Washim
- Same station, no local travel
- Safety buffer: 192 min (3 h 12 min) Total wait: 192 min
Night-time change — plan safe waiting and local transport
- 3:55 AMWHMWashim
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 9 h 37 min · 550 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹150SL ₹3003A ₹7752A ₹1,0901A ₹1,795(est.)
8 stops — Show or hide intermediate stops
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 205 min (3 h 25 min) Total wait: 230 min
Station change — you must travel to a different station or bus stand
- 5:22 PMSTSurat
Train19020Bandra Terminus Express
Starts from Haridwar Jn (HW) on Tue, 17 Nov at 13:30 (1:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Wed, 18 Nov 22:30
Runs: Daily
Indian Railways · 1 h 41 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
3 stops — Show or hide intermediate stops
- 5:48 PMNVSNavsari · 2 min halt
- 6:08 PMBIMBilimora Jn · 2 min halt
- 6:30 PMBLValsad · 5 min halt
7:03 PMVAPIVapi
via Kalyan · 3 routes · best 18 h 30 min
All 3 combinations via Kalyan
Option 2: 4:15 AM10:45 PM
18 h 30 min1 changeSmallest buffer: 187 minfrom ₹400 (est.)
via Kalyan
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Local transit: 15 min · Kalyan Jn (KYN) →← Kalyan Bus Stand
- Safety buffer: 187 min (3 h 7 min) Total wait: 202 min
Station change — you must travel to a different station or bus stand
- 7:00 PMKalyan Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 45 min · 149 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹170(est.)
Buy at bus stand · every 60 min
10:45 PMVapi Bus Stand
Option 3: 4:15 AM11:05 PM
18 h 50 min1 changeSmallest buffer: 247 minfrom ₹455 (est.)
via Kalyan
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Local transit: 15 min · Kalyan Jn (KYN) →← Kalyan Bus Stand
- Safety buffer: 247 min (4 h 7 min) Total wait: 262 min
Station change — you must travel to a different station or bus stand
- 8:00 PMKalyan Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 5 min · 154 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹225(est.)
Opens AbhiBus — enter Kalyan → Daman, Wed, 18 Nov
11:05 PMDaman Bus Stand
Option 4: 4:15 AM1:05 AM+1 day
20 h 50 min1 changeSmallest buffer: 367 minfrom ₹455 (est.)
via Kalyan
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Local transit: 15 min · Kalyan Jn (KYN) →← Kalyan Bus Stand
- Safety buffer: 367 min (6 h 7 min) Total wait: 382 min
Station change — you must travel to a different station or bus stand
- 10:00 PMKalyan Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 5 min · 154 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹225(est.)
Opens AbhiBus — enter Kalyan → Daman, Wed, 18 Nov
1:05 AM+1 dayDaman Bus Stand
via Akola · 30 routes · best 18 h 33 min
All 30 combinations via Akola
Option 2: 12:20 PM6:53 AM+1 day
18 h 33 min2 changesSmallest buffer: 189 minfrom ₹225 (est.)
via Akola · Surat
- 12:20 PMHNLHingoli Deccan
Train19302Dr. Ambedkar Nagar Weekly Express
Starts from Yesvantpur Jn (YPR) on Tue, 17 Nov at 15:45 (3:45 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Dr. Ambedkar Nagar (DADN) at Thu, 19 Nov 07:05
Runs: Tue
Indian Railways · 2 h 40 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 1:19 PMWHMWashim · 1 min halt
3:00 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 195 min (3 h 15 min) Total wait: 195 min
- 6:15 PMAKAkola Jn
Train22906Okha Weekly SF Express
Starts from Shalimar (SHM) on Tue, 17 Nov at 20:15 (8:15 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Okha (OKHA) at Thu, 19 Nov 16:00
Runs: Tue
Indian Railways · 8 h 6 min · 474 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2953A ₹7302A ₹1,0051A ₹1,650(est.)
2 stops — Show or hide intermediate stops
- 8:30 PMBSLBhusaval Jn · 5 min halt
- 11:15 PMNDBNandurbar · 5 min halt
2:21 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 189 min (3 h 9 min) Total wait: 189 min
Night-time change — plan safe waiting and local transport
- 5:30 AM+1 daySTSurat
Train22936Bandra Terminus Weekly SF Express
Starts from Palitana (PIT) on Wed, 18 Nov at 20:00 (8:00 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 09:30
Runs: Wed
Indian Railways · 1 h 23 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)
6:53 AM+1 dayVAPIVapi
Option 3: 12:20 PM7:23 AM+1 day
19 h 3 min2 changesSmallest buffer: 220 minfrom ₹810 (est.)
via Akola · Surat
- 12:20 PMHNLHingoli Deccan
Train19302Dr. Ambedkar Nagar Weekly Express
Starts from Yesvantpur Jn (YPR) on Tue, 17 Nov at 15:45 (3:45 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Dr. Ambedkar Nagar (DADN) at Thu, 19 Nov 07:05
Runs: Tue
Indian Railways · 2 h 40 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 1:19 PMWHMWashim · 1 min halt
3:00 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 220 min (3 h 40 min) Total wait: 220 min
- 6:40 PMAKAkola Jn
Train12843Ahmedabad SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 17:30 (5:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 06:25
Runs: Tue, Thu, Fri, Sat
Indian Railways · 7 h 53 min · 474 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2953A ₹7302A ₹1,005(est.)
6 stops — Show or hide intermediate stops
- 7:34 PMNNNandura · 1 min halt
- 7:58 PMMKUMalkapur · 2 min halt
- 8:50 PMBSLBhusaval Jn · 5 min halt
- 9:20 PMJLJalgaon Jn · 3 min halt
- 10:03 PMDXGDharangaon · 2 min halt
- 11:54 PMNDBNandurbar · 5 min halt
2:33 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 225 min (3 h 45 min) Total wait: 225 min
Night-time change — plan safe waiting and local transport
- 6:18 AM+1 daySTSurat
Train12954Hazrat Nizamuddin - Mumbai Central Tejas Rajdhani Express
Starts from Hazrat Nizamuddin Jn (NZM) on Wed, 18 Nov at 17:15 (5:15 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Central (MMCT) at Thu, 19 Nov 10:05
Runs: Daily
Indian Railways · 1 h 5 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.3A ₹6302A ₹8651A ₹1,410(est.)
1 stop — Show or hide intermediate stops
- 7:03 AMBLValsad · 2 min halt
7:23 AM+1 dayVAPIVapi
Option 4: 12:20 PM8:08 AM+1 day
19 h 48 min2 changesSmallest buffer: 220 minfrom ₹225 (est.)
via Akola · Surat
- 12:20 PMHNLHingoli Deccan
Train19302Dr. Ambedkar Nagar Weekly Express
Starts from Yesvantpur Jn (YPR) on Tue, 17 Nov at 15:45 (3:45 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Dr. Ambedkar Nagar (DADN) at Thu, 19 Nov 07:05
Runs: Tue
Indian Railways · 2 h 40 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 1:19 PMWHMWashim · 1 min halt
3:00 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 220 min (3 h 40 min) Total wait: 220 min
- 6:40 PMAKAkola Jn
Train12843Ahmedabad SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 17:30 (5:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 06:25
Runs: Tue, Thu, Fri, Sat
Indian Railways · 7 h 53 min · 474 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2953A ₹7302A ₹1,005(est.)
6 stops — Show or hide intermediate stops
- 7:34 PMNNNandura · 1 min halt
- 7:58 PMMKUMalkapur · 2 min halt
- 8:50 PMBSLBhusaval Jn · 5 min halt
- 9:20 PMJLJalgaon Jn · 3 min halt
- 10:03 PMDXGDharangaon · 2 min halt
- 11:54 PMNDBNandurbar · 5 min halt
2:33 AM+1 daySTSurat Change at Surat
- Same station, no local travel
- Safety buffer: 269 min (4 h 29 min) Total wait: 269 min
Night-time change — plan safe waiting and local transport
- 7:02 AM+1 daySTSurat
Train22908Madgaon Weekly SF Express
Starts from Hapa (HAPA) on Wed, 18 Nov at 21:40 (9:40 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Madgaon (MAO) at Thu, 19 Nov 22:00
Runs: Wed
Indian Railways · 1 h 6 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1603A ₹5202A ₹710(est.)
8:08 AM+1 dayVAPIVapi
via Mumbai · 11 routes · best 18 h 48 min
All 11 combinations via Mumbai
Option 2: 4:15 AM11:03 PM
18 h 48 min1 changeSmallest buffer: 242 minfrom ₹285 (est.)
via Mumbai
- Different change city
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 12 h 13 min · 647 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹240CC ₹790(est.)
13 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
- 4:00 PMTNAThane · 2 min halt
4:28 PMDRDadar Change at Mumbai
- Local transit: 30 min · Dadar (DR) →← Bandra Terminus (BDTS)
- Safety buffer: 242 min (4 h 2 min) Total wait: 272 min
Station change — you must travel to a different station or bus stand
- 9:00 PMBDTSBandra Terminus
Train14702Amrapur Aravali Express
Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1
Ends at Shri Ganganagar (SGNR) at Fri, 20 Nov 04:15
Runs: Daily
Indian Railways · 2 h 3 min · 157 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1303A ₹4752A ₹665(est.)
3 stops — Show or hide intermediate stops
- 9:07 PMADHAndheri · 3 min halt
- 9:27 PMBVIBorivali · 3 min halt
- 10:38 PMDRDDahanu Road · 2 min halt
11:03 PMVAPIVapi
Option 3: 4:15 AM11:28 PM
19 h 13 min1 changeSmallest buffer: 247 minfrom ₹305 (est.)
via Mumbai
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 12 h 13 min · 647 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹240CC ₹790(est.)
13 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
- 4:00 PMTNAThane · 2 min halt
4:28 PMDRDadar Change at Mumbai
- Local transit: 30 min · Dadar (DR) →← Mumbai Central (MMCT)
- Safety buffer: 247 min (4 h 7 min) Total wait: 277 min
Station change — you must travel to a different station or bus stand
- 9:05 PMMMCTMumbai Central
Train22945Saurashtra Mail
Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 21:05 (9:05 PM) · you board on day 1
Ends at Okha (OKHA) at Thu, 19 Nov 14:50
Runs: Daily
Indian Railways · 2 h 23 min · 169 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹65SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)
3 stops — Show or hide intermediate stops
- 9:20 PMDDRDadar · 5 min halt
- 9:49 PMBVIBorivali · 5 min halt
- 10:33 PMPLGPalghar · 2 min halt
11:28 PMVAPIVapi
Option 4: 4:15 AM11:37 PM
19 h 22 min1 changeSmallest buffer: 242 minfrom ₹285 (est.)
via Mumbai
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 12 h 13 min · 647 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹240CC ₹790(est.)
13 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
- 4:00 PMTNAThane · 2 min halt
4:28 PMDRDadar Change at Mumbai
- Local transit: 30 min · Dadar (DR) →← Bandra Terminus (BDTS)
- Safety buffer: 242 min (4 h 2 min) Total wait: 272 min
Station change — you must travel to a different station or bus stand
- 9:00 PMBDTSBandra Terminus
Train19707Aravalli Express
Starts from Bandra Terminus (BDTS) on Wed, 18 Nov at 21:00 (9:00 PM) · you board on day 1
Ends at Jaipur (JP) at Thu, 19 Nov 18:45
Runs: Daily · Running days not verified — check before booking
Indian Railways · 2 h 37 min · 155 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1303A ₹4752A ₹665(est.)
3 stops — Show or hide intermediate stops
- 9:17 PMADHAndheri · 2 min halt
- 9:39 PMBVIBorivali · 2 min halt
- 10:58 PMDRDDahanu Road · 2 min halt
11:37 PMVAPIVapi
via Thane · 3 routes · best 18 h 50 min
All 3 combinations via Thane
Option 2: 4:15 AM11:05 PM
18 h 50 min1 changeSmallest buffer: 215 minfrom ₹460 (est.)
via Thane
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 25 min · Thane (TNA) →← Thane Bus Stand
- Safety buffer: 215 min (3 h 35 min) Total wait: 240 min
Station change — you must travel to a different station or bus stand
- 8:00 PMThane Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 5 min · 154 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹225(est.)
Opens AbhiBus — enter Thane → Daman, Wed, 18 Nov
11:05 PMDaman Bus Stand
Option 3: 4:15 AM11:45 PM
19 h 30 min1 changeSmallest buffer: 215 minfrom ₹405 (est.)
via Thane
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 25 min · Thane (TNA) →← Thane Bus Stand
- Safety buffer: 215 min (3 h 35 min) Total wait: 240 min
Station change — you must travel to a different station or bus stand
- 8:00 PMThane Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 45 min · 149 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹170(est.)
Buy at bus stand · every 60 min
11:45 PMVapi Bus Stand
Option 4: 4:15 AM1:05 AM+1 day
20 h 50 min1 changeSmallest buffer: 335 minfrom ₹460 (est.)
via Thane
- Nearby station
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 45 min · 623 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹235CC ₹770(est.)
12 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
- 3:38 PMKYNKalyan Jn · 2 min halt
4:00 PMTNAThane Change at Thane
- Local transit: 25 min · Thane (TNA) →← Thane Bus Stand
- Safety buffer: 335 min (5 h 35 min) Total wait: 360 min
Station change — you must travel to a different station or bus stand
- 10:00 PMThane Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 5 min · 154 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹225(est.)
Opens AbhiBus — enter Thane → Daman, Wed, 18 Nov
1:05 AM+1 dayDaman Bus Stand
via Akola · 12 routes · best 18 h 50 min
All 12 combinations via Akola
Option 2: 3:40 PM10:30 AM+1 day
18 h 50 min2 changesSmallest buffer: 180 minfrom ₹320 (est.)
via Akola · Nashik
- 3:40 PMHNLHingoli Deccan
Train17641Narkher Intercity Express
Starts from Kacheguda (KCG) on Wed, 18 Nov at 07:10 (7:10 AM) · you board on day 1
Ends at Narkher (NRKR) at Wed, 18 Nov 23:00
Runs: Sun, Tue, Wed, Thu, Fri, Sat
Indian Railways · 2 h 35 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹353A ₹475(est.)
1 stop — Show or hide intermediate stops
- 4:29 PMWHMWashim · 1 min halt
6:15 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 205 min (3 h 25 min) Total wait: 205 min
- 9:40 PMAKAkola Jn
Train12146Mumbai Ltt SF Express
Starts from Puri (PURI) on Tue, 17 Nov at 21:40 (9:40 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Ltt (LTT) at Thu, 19 Nov 07:25
Runs: Tue
Indian Railways · 5 h 45 min · 396 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2603A ₹6352A ₹8751A ₹1,430(est.)
1 stop — Show or hide intermediate stops
- 11:45 PMBSLBhusaval Jn · 5 min halt
3:25 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 180 min (3 h) Total wait: 215 min
Night-time change — plan safe waiting and local transport
- 7:00 AM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
10:30 AM+1 dayVapi Bus Stand
Option 3: 1:00 PM9:00 AM+1 day
20 h2 changesSmallest buffer: 208 minfrom ₹395 (est.)
via Akola · Nashik
- Nearby station
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 2 h 55 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹50SL ₹1603A ₹5202A ₹710(est.)
1 stop — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
3:55 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 208 min (3 h 28 min) Total wait: 208 min
- 7:23 PMAKAkola Jn
Train22110Mumbai Ltt SF Express
Starts from Balharshah (BPQ) on Wed, 18 Nov at 13:40 (1:40 PM) · you board on day 1
Ends at Mumbai Ltt (LTT) at Thu, 19 Nov 05:30
Runs: Wed
Indian Railways · 6 h 20 min · 397 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2603A ₹6352A ₹875(est.)
3 stops — Show or hide intermediate stops
- 7:49 PMSEGShegaon · 1 min halt
- 8:23 PMMKUMalkapur · 2 min halt
- 9:40 PMBSLBhusaval Jn · 5 min halt
1:43 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 222 min (3 h 42 min) Total wait: 257 min
Night-time change — plan safe waiting and local transport
- 6:00 AM+1 dayNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Thu, 19 Nov
9:00 AM+1 dayDaman Bus Stand
Option 4: 12:20 PM8:30 AM+1 day
20 h 10 min2 changesSmallest buffer: 212 minfrom ₹305 (est.)
via Akola · Nashik
- 12:20 PMHNLHingoli Deccan
Train19302Dr. Ambedkar Nagar Weekly Express
Starts from Yesvantpur Jn (YPR) on Tue, 17 Nov at 15:45 (3:45 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Dr. Ambedkar Nagar (DADN) at Thu, 19 Nov 07:05
Runs: Tue
Indian Railways · 2 h 40 min · 127 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 1:19 PMWHMWashim · 1 min halt
3:00 PMAKAkola Jn Change at Akola
- Same station, no local travel
- Safety buffer: 243 min (4 h 3 min) Total wait: 243 min
- 7:03 PMAKAkola Jn
Train11203Nagpur - Madgaon Express
Starts from Nagpur (NGP) on Wed, 18 Nov at 15:05 (3:05 PM) · you board on day 1
Ends at Madgaon (MAO) at Thu, 19 Nov 17:45
Runs: Wed, Sat
Indian Railways · 5 h 50 min · 397 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹110SL ₹2303A ₹5902A ₹830(est.)
3 stops — Show or hide intermediate stops
- 7:23 PMSEGShegaon · 2 min halt
- 8:13 PMMKUMalkapur · 2 min halt
- 9:25 PMBSLBhusaval Jn · 5 min halt
12:53 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 212 min (3 h 32 min) Total wait: 247 min
Night-time change — plan safe waiting and local transport
- 5:00 AM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
8:30 AM+1 dayVapi Bus Stand
via Akola · 6 routes · best 19 h
All 6 combinations via Akola
Option 2: 9:00 PM4:00 PM+1 day
19 h2 changesSmallest buffer: 185 minfrom ₹480 (est.)
via Akola · Nashik
- Nearby station
- 9:00 PMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
12:15 AM+1 dayAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 185 min (3 h 5 min) Total wait: 205 min
Night-time change — plan safe waiting and local transport
- 3:40 AM+1 dayAKAkola Jn
Train17667Mumbai Ltt Weekly Express
Starts from Nanded (NED) on Wed, 18 Nov at 21:15 (9:15 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Ltt (LTT) at Thu, 19 Nov 13:00
Runs: Wed
Indian Railways · 5 h 33 min · 397 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹110SL ₹2303A ₹5902A ₹8301A ₹1,355(est.)
3 stops — Show or hide intermediate stops
- 4:38 AMMKUMalkapur · 2 min halt
- 5:35 AMBSLBhusaval Jn · 5 min halt
- 8:10 AMMMRManmad Jn · 2 min halt
9:13 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 192 min (3 h 12 min) Total wait: 227 min
Station change — you must travel to a different station or bus stand
- 1:00 PM+1 dayNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Thu, 19 Nov
4:00 PM+1 dayDaman Bus Stand
Option 3: 9:00 PM4:30 PM+1 day
19 h 30 min2 changesSmallest buffer: 185 minfrom ₹420 (est.)
via Akola · Nashik
- 9:00 PMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
12:15 AM+1 dayAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 185 min (3 h 5 min) Total wait: 205 min
Night-time change — plan safe waiting and local transport
- 3:40 AM+1 dayAKAkola Jn
Train17667Mumbai Ltt Weekly Express
Starts from Nanded (NED) on Wed, 18 Nov at 21:15 (9:15 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Ltt (LTT) at Thu, 19 Nov 13:00
Runs: Wed
Indian Railways · 5 h 33 min · 397 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹110SL ₹2303A ₹5902A ₹8301A ₹1,355(est.)
3 stops — Show or hide intermediate stops
- 4:38 AMMKUMalkapur · 2 min halt
- 5:35 AMBSLBhusaval Jn · 5 min halt
- 8:10 AMMMRManmad Jn · 2 min halt
9:13 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 192 min (3 h 12 min) Total wait: 227 min
Station change — you must travel to a different station or bus stand
- 1:00 PM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
4:30 PM+1 dayVapi Bus Stand
Option 4: 2:00 PM10:30 AM+1 day
20 h 30 min2 changesSmallest buffer: 200 minfrom ₹435 (est.)
via Akola · Nashik
- 2:00 PMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
5:15 PMAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 200 min (3 h 20 min) Total wait: 220 min
Station change — you must travel to a different station or bus stand
- 8:55 PMAKAkola Jn
Train12106Vidarbha SF Express
Starts from Gondia Jn (G) on Wed, 18 Nov at 14:30 (2:30 PM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 07:00
Runs: Daily
Indian Railways · 5 h 33 min · 396 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2603A ₹6352A ₹8751A ₹1,430(est.)
7 stops — Show or hide intermediate stops
- 9:23 PMSEGShegaon · 2 min halt
- 9:43 PMNNNandura · 2 min halt
- 10:08 PMMKUMalkapur · 2 min halt
- 11:05 PMBSLBhusaval Jn · 5 min halt
- 11:38 PMJLJalgaon Jn · 2 min halt
- 12:38 AMCSNChalisgaon Jn · 2 min halt
- 1:33 AMMMRManmad Jn · 2 min halt
2:28 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 237 min (3 h 57 min) Total wait: 272 min
Night-time change — plan safe waiting and local transport
- 7:00 AM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
10:30 AM+1 dayVapi Bus Stand
via Jalna · 1 route · best 19 h
All 1 combinations via Jalna
Option 2: 6:00 AM1:00 AM+1 day
19 h2 changesSmallest buffer: 208 minfrom ₹530 (est.)
via Jalna · Nashik
- Nearby station
- 6:00 AMHingoli Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 20 min · 166 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹240(est.)
Opens AbhiBus — enter Hingoli → Jalna, Wed, 18 Nov
9:20 AMJalna Bus Stand Change at Jalna
- Local transit: 15 min · Jalna Bus Stand →← Jalna (J)
- Safety buffer: 215 min (3 h 35 min) Total wait: 230 min
Station change — you must travel to a different station or bus stand
- 1:10 PMJJalna
Train17618Tapovan Express
Starts from Nanded (NED) on Wed, 18 Nov at 10:05 (10:05 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 22:08
Runs: Daily
Indian Railways · 4 h 47 min · 248 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹70CC ₹340(est.)
6 stops — Show or hide intermediate stops
- 2:30 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 3:04 PMLSRLasur · 1 min halt
- 3:29 PMRGORotegaon · 1 min halt
- 4:55 PMMMRManmad Jn · 5 min halt
- 5:19 PMLSLasalgaon · 1 min halt
- 5:31 PMNRNiphad · 1 min halt
5:57 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 208 min (3 h 28 min) Total wait: 243 min
Station change — you must travel to a different station or bus stand
- 10:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
1:00 AM+1 dayDaman Bus Stand
via Parbhani · 3 routes · best 19 h
All 3 combinations via Parbhani
Option 2: 6:00 AM1:00 AM+1 day
19 h2 changesSmallest buffer: 185 minfrom ₹415 (est.)
via Parbhani · Nashik
- Nearby station
- 6:00 AMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 1 h 55 min · 77 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹90(est.)
Buy at bus stand · every 60 min
7:55 AMParbhani Bus Stand Change at Parbhani
- Local transit: 15 min · Parbhani Bus Stand →← Parbhani Jn (PBN)
- Safety buffer: 185 min (3 h 5 min) Total wait: 200 min
Station change — you must travel to a different station or bus stand
- 11:15 AMPBNParbhani Jn
Train17618Tapovan Express
Starts from Nanded (NED) on Wed, 18 Nov at 10:05 (10:05 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 22:08
Runs: Daily
Indian Railways · 6 h 42 min · 362 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹105CC ₹460(est.)
10 stops — Show or hide intermediate stops
- 11:35 AMMVOManwath Road · 1 min halt
- 11:49 AMSELUSelu · 1 min halt
- 12:14 PMPTUPartur · 1 min halt
- 1:08 PMJJalna · 2 min halt
- 2:30 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 3:04 PMLSRLasur · 1 min halt
- 3:29 PMRGORotegaon · 1 min halt
- 4:55 PMMMRManmad Jn · 5 min halt
- 5:19 PMLSLasalgaon · 1 min halt
- 5:31 PMNRNiphad · 1 min halt
5:57 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 208 min (3 h 28 min) Total wait: 243 min
Station change — you must travel to a different station or bus stand
- 10:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
1:00 AM+1 dayDaman Bus Stand
Option 3: 3:00 PM10:30 AM+1 day
19 h 30 min2 changesSmallest buffer: 192 minfrom ₹355 (est.)
via Parbhani · Nashik
- 3:00 PMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 1 h 55 min · 77 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹90(est.)
Buy at bus stand · every 60 min
4:55 PMParbhani Bus Stand Change at Parbhani
- Local transit: 15 min · Parbhani Bus Stand →← Parbhani Jn (PBN)
- Safety buffer: 192 min (3 h 12 min) Total wait: 207 min
Station change — you must travel to a different station or bus stand
- 8:22 PMPBNParbhani Jn
Train17058Devagiri Express
Starts from Lingampalli (LPI) on Wed, 18 Nov at 12:25 (12:25 PM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 07:10
Runs: Daily
Indian Railways · 6 h 23 min · 362 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹105SL ₹2153A ₹5502A ₹7701A ₹1,255(est.)
8 stops — Show or hide intermediate stops
- 8:45 PMMVOManwath Road · 1 min halt
- 9:04 PMSELUSelu · 1 min halt
- 9:29 PMPTUPartur · 1 min halt
- 10:13 PMJJalna · 2 min halt
- 11:20 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:58 PMLSRLasur · 1 min halt
- 12:25 AMRGORotegaon · 1 min halt
- 1:45 AMMMRManmad Jn · 5 min halt
2:45 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 220 min (3 h 40 min) Total wait: 255 min
Night-time change — plan safe waiting and local transport
- 7:00 AM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
10:30 AM+1 dayVapi Bus Stand
Option 4: 5:00 AM1:00 AM+1 day
20 h2 changesSmallest buffer: 208 minfrom ₹415 (est.)
via Parbhani · Nashik
- Nearby station
- 5:00 AMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 1 h 55 min · 77 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹90(est.)
Buy at bus stand · every 60 min
6:55 AMParbhani Bus Stand Change at Parbhani
- Local transit: 15 min · Parbhani Bus Stand →← Parbhani Jn (PBN)
- Safety buffer: 245 min (4 h 5 min) Total wait: 260 min
Station change — you must travel to a different station or bus stand
- 11:15 AMPBNParbhani Jn
Train17618Tapovan Express
Starts from Nanded (NED) on Wed, 18 Nov at 10:05 (10:05 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 22:08
Runs: Daily
Indian Railways · 6 h 42 min · 362 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹105CC ₹460(est.)
10 stops — Show or hide intermediate stops
- 11:35 AMMVOManwath Road · 1 min halt
- 11:49 AMSELUSelu · 1 min halt
- 12:14 PMPTUPartur · 1 min halt
- 1:08 PMJJalna · 2 min halt
- 2:30 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 3:04 PMLSRLasur · 1 min halt
- 3:29 PMRGORotegaon · 1 min halt
- 4:55 PMMMRManmad Jn · 5 min halt
- 5:19 PMLSLasalgaon · 1 min halt
- 5:31 PMNRNiphad · 1 min halt
5:57 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 208 min (3 h 28 min) Total wait: 243 min
Station change — you must travel to a different station or bus stand
- 10:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
1:00 AM+1 dayDaman Bus Stand
via Surat · 4 routes · best 19 h 4 min
All 4 combinations via Surat
Option 2: 2:35 AM9:39 PM
19 h 4 min2 changesSmallest buffer: 196 minfrom ₹190 (est.)
via Surat · Navsari
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 199 min (3 h 19 min) Total wait: 199 min
- 4:51 PMUDNUdhna Jn
Train19102Virar MEMU Express
Starts from Surat (ST) on Wed, 18 Nov at 16:45 (4:45 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 22:22
Runs: Daily
Indian Railways · 28 min · 26 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 4:54 PMBHETBhestan · 1 min halt
- 5:00 PMSCHSachin · 1 min halt
- 5:09 PMMRLMaroli · 1 min halt
5:19 PMNVSNavsari Change at Navsari
- Same station, no local travel
- Safety buffer: 196 min (3 h 16 min) Total wait: 196 min
- 8:35 PMNVSNavsari
Train11095Ahimsa Express
Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 16:00 (4:00 PM) · you board on day 1
Ends at Pune Jn (PUNE) at Thu, 19 Nov 04:45
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 4 min · 67 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹20SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 9:13 PMBLValsad · 2 min halt
9:39 PMVAPIVapi
Option 3: 2:35 AM11:33 PM
20 h 58 min2 changesSmallest buffer: 239 minfrom ₹190 (est.)
via Surat · Valsad
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 239 min (3 h 59 min) Total wait: 264 min
Station change — you must travel to a different station or bus stand
- 5:56 PMSTSurat
Train16533Ksr Bengaluru Express
Starts from Jodhpur Jn (JU) on Wed, 18 Nov at 06:15 (6:15 AM) · you board on day 1
Ends at Ksr Bengaluru (SBC) at Fri, 20 Nov 02:30
Runs: Wed
Indian Railways · 1 h 7 min · 69 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹20SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
7:03 PMBLValsad Change at Valsad
- Same station, no local travel
- Safety buffer: 252 min (4 h 12 min) Total wait: 252 min
- 11:15 PMBLValsad
Train59442Ahmedabad Mumbai Central Passenger
Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 12:05 (12:05 PM) · you board on day 1
Ends at Mumbai Central (BCT) at Thu, 19 Nov 04:40
Runs: Daily · Running days not verified — check before booking
Indian Railways · 18 min · 17 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
2 stops — Show or hide intermediate stops
- 11:22 PMATULAtul
- 11:25 PMPADPardi · 2 min halt
11:33 PMUVDUdvada
Option 4: 2:35 AM11:51 PM
21 h 16 min2 changesSmallest buffer: 239 minfrom ₹190 (est.)
via Surat · Valsad
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 239 min (3 h 59 min) Total wait: 264 min
Station change — you must travel to a different station or bus stand
- 5:56 PMSTSurat
Train16533Ksr Bengaluru Express
Starts from Jodhpur Jn (JU) on Wed, 18 Nov at 06:15 (6:15 AM) · you board on day 1
Ends at Ksr Bengaluru (SBC) at Fri, 20 Nov 02:30
Runs: Wed
Indian Railways · 1 h 7 min · 69 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹20SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
7:03 PMBLValsad Change at Valsad
- Same station, no local travel
- Safety buffer: 252 min (4 h 12 min) Total wait: 252 min
- 11:15 PMBLValsad
Train59442Ahmedabad Mumbai Central Passenger
Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 12:05 (12:05 PM) · you board on day 1
Ends at Mumbai Central (BCT) at Thu, 19 Nov 04:40
Runs: Daily · Running days not verified — check before booking
Indian Railways · 36 min · 26 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 11:22 PMATULAtul
- 11:25 PMPADPardi · 2 min halt
- 11:33 PMUVDUdvada · 2 min halt
11:51 PMVAPIVapi
via Akola · 30 routes · best 19 h 21 min
All 30 combinations via Akola
Option 2: 7:00 AM2:21 AM+1 day
19 h 21 min2 changesSmallest buffer: 203 minfrom ₹325 (est.)
via Akola · Surat
- 7:00 AMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
10:15 AMAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 205 min (3 h 25 min) Total wait: 225 min
Station change — you must travel to a different station or bus stand
- 2:00 PMAKAkola Jn
Train20625Bhagat Ki Kothi SF Express
Starts from Mgr Chennai Central (MAS) on Tue, 17 Nov at 19:35 (7:35 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bhagat KI Kothi (BGKT) at Thu, 19 Nov 11:40
Runs: Sun, Mon, Tue, Thu, Fri
Indian Railways · 7 h 25 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2903A ₹7252A ₹1,000(est.)
4 stops — Show or hide intermediate stops
- 3:03 PMMKUMalkapur · 2 min halt
- 4:05 PMBSLBhusaval Jn · 5 min halt
- 4:47 PMJLJalgaon Jn · 3 min halt
- 7:00 PMNDBNandurbar · 5 min halt
9:25 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 203 min (3 h 23 min) Total wait: 228 min
Night-time change — plan safe waiting and local transport
- 1:13 AM+1 daySTSurat
Train19723Bandra Terminus JP Bdts Exp
Starts from Jaipur (JP) on Wed, 18 Nov at 08:20 (8:20 AM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 05:10
Runs: Wed
Indian Railways · 1 h 8 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
2:21 AM+1 dayVAPIVapi
Option 3: 7:00 AM3:05 AM+1 day
20 h 5 min2 changesSmallest buffer: 200 minfrom ₹325 (est.)
via Akola · Surat
- 7:00 AMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
10:15 AMAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 205 min (3 h 25 min) Total wait: 225 min
Station change — you must travel to a different station or bus stand
- 2:00 PMAKAkola Jn
Train20625Bhagat Ki Kothi SF Express
Starts from Mgr Chennai Central (MAS) on Tue, 17 Nov at 19:35 (7:35 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bhagat KI Kothi (BGKT) at Thu, 19 Nov 11:40
Runs: Sun, Mon, Tue, Thu, Fri
Indian Railways · 7 h 25 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2903A ₹7252A ₹1,000(est.)
4 stops — Show or hide intermediate stops
- 3:03 PMMKUMalkapur · 2 min halt
- 4:05 PMBSLBhusaval Jn · 5 min halt
- 4:47 PMJLJalgaon Jn · 3 min halt
- 7:00 PMNDBNandurbar · 5 min halt
9:25 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 200 min (3 h 20 min) Total wait: 225 min
Night-time change — plan safe waiting and local transport
- 1:10 AM+1 daySTSurat
Train19144Lokshakti Express
Starts from Ahmedabad Jn (ADI) on Wed, 18 Nov at 21:05 (9:05 PM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 06:05
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 55 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹665(est.)
2 stops — Show or hide intermediate stops
- 1:42 AMNVSNavsari · 2 min halt
- 2:40 AMBLValsad · 2 min halt
3:05 AM+1 dayVAPIVapi
Option 4: 7:00 AM3:08 AM+1 day
20 h 8 min2 changesSmallest buffer: 205 minfrom ₹325 (est.)
via Akola · Surat
- 7:00 AMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 15 min · 129 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹150(est.)
Buy at bus stand · every 60 min
10:15 AMAkola Bus Stand Change at Akola
- Local transit: 20 min · Akola Bus Stand →← Akola Jn (AK)
- Safety buffer: 205 min (3 h 25 min) Total wait: 225 min
Station change — you must travel to a different station or bus stand
- 2:00 PMAKAkola Jn
Train20625Bhagat Ki Kothi SF Express
Starts from Mgr Chennai Central (MAS) on Tue, 17 Nov at 19:35 (7:35 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bhagat KI Kothi (BGKT) at Thu, 19 Nov 11:40
Runs: Sun, Mon, Tue, Thu, Fri
Indian Railways · 7 h 25 min · 471 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹145SL ₹2903A ₹7252A ₹1,000(est.)
4 stops — Show or hide intermediate stops
- 3:03 PMMKUMalkapur · 2 min halt
- 4:05 PMBSLBhusaval Jn · 5 min halt
- 4:47 PMJLJalgaon Jn · 3 min halt
- 7:00 PMNDBNandurbar · 5 min halt
9:25 PMUDNUdhna Jn Change at Surat
- Local transit: 25 min · Udhna Jn (UDN) →← Surat (ST)
- Safety buffer: 247 min (4 h 7 min) Total wait: 272 min
Night-time change — plan safe waiting and local transport
- 1:57 AM+1 daySTSurat
Train14701Amrapur Aravali Express
Starts from Shri Ganganagar (SGNR) on Tue, 17 Nov at 23:00 (11:00 PM) · you board on day 3
This train starts on Tue, 17 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 06:15
Runs: Daily
Indian Railways · 1 h 11 min · 95 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹30SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 2:13 AMNVSNavsari · 2 min halt
3:08 AM+1 dayVAPIVapi
via Malkapur · 2 routes · best 19 h 30 min
All 2 combinations via Malkapur
Option 2: 1:00 PM8:30 AM+1 day
19 h 30 min2 changesSmallest buffer: 195 minfrom ₹330 (est.)
via Malkapur · Nashik
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 4 h · 216 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹80SL ₹1703A ₹5202A ₹710(est.)
3 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
5:00 PMMKUMalkapur Change at Malkapur
- Same station, no local travel
- Safety buffer: 195 min (3 h 15 min) Total wait: 195 min
- 8:15 PMMKUMalkapur
Train11203Nagpur - Madgaon Express
Starts from Nagpur (NGP) on Wed, 18 Nov at 15:05 (3:05 PM) · you board on day 1
Ends at Madgaon (MAO) at Thu, 19 Nov 17:45
Runs: Wed, Sat
Indian Railways · 4 h 38 min · 307 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹90SL ₹1903A ₹4852A ₹675(est.)
1 stop — Show or hide intermediate stops
- 9:25 PMBSLBhusaval Jn · 5 min halt
12:53 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 212 min (3 h 32 min) Total wait: 247 min
Night-time change — plan safe waiting and local transport
- 5:00 AM+1 dayNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
8:30 AM+1 dayVapi Bus Stand
Option 3: 1:00 PM9:00 AM+1 day
20 h2 changesSmallest buffer: 195 minfrom ₹390 (est.)
via Malkapur · Nashik
- Nearby station
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 4 h · 216 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹80SL ₹1703A ₹5202A ₹710(est.)
3 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
5:00 PMMKUMalkapur Change at Malkapur
- Same station, no local travel
- Safety buffer: 195 min (3 h 15 min) Total wait: 195 min
- 8:15 PMMKUMalkapur
Train11203Nagpur - Madgaon Express
Starts from Nagpur (NGP) on Wed, 18 Nov at 15:05 (3:05 PM) · you board on day 1
Ends at Madgaon (MAO) at Thu, 19 Nov 17:45
Runs: Wed, Sat
Indian Railways · 4 h 38 min · 307 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹90SL ₹1903A ₹4852A ₹675(est.)
1 stop — Show or hide intermediate stops
- 9:25 PMBSLBhusaval Jn · 5 min halt
12:53 AM+1 dayNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 272 min (4 h 32 min) Total wait: 307 min
Night-time change — plan safe waiting and local transport
- 6:00 AM+1 dayNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Thu, 19 Nov
9:00 AM+1 dayDaman Bus Stand
via Purna · 1 route · best 19 h 35 min
All 1 combinations via Purna
Option 2: 5:25 AM1:00 AM+1 day
19 h 35 min2 changesSmallest buffer: 193 minfrom ₹355 (est.)
via Purna · Nashik
- Nearby station
- 5:25 AMHNLHingoli Deccan
Train17666Hazur Sahib Nanded Weekly Express
Starts from Mumbai Ltt (LTT) on Tue, 17 Nov at 16:35 (4:35 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Nanded (NED) at Wed, 18 Nov 09:10
Runs: Tue
Indian Railways · 2 h · 81 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹25SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
1 stop — Show or hide intermediate stops
- 6:24 AMBMFBasmat · 1 min halt
7:25 AMPAUPurna Jn Change at Purna
- Same station, no local travel
- Safety buffer: 193 min (3 h 13 min) Total wait: 193 min
- 10:38 AMPAUPurna Jn
Train17618Tapovan Express
Starts from Nanded (NED) on Wed, 18 Nov at 10:05 (10:05 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 22:08
Runs: Daily
Indian Railways · 7 h 19 min · 391 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹110CC ₹490(est.)
11 stops — Show or hide intermediate stops
- 11:13 AMPBNParbhani Jn · 2 min halt
- 11:35 AMMVOManwath Road · 1 min halt
- 11:49 AMSELUSelu · 1 min halt
- 12:14 PMPTUPartur · 1 min halt
- 1:08 PMJJalna · 2 min halt
- 2:30 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 3:04 PMLSRLasur · 1 min halt
- 3:29 PMRGORotegaon · 1 min halt
- 4:55 PMMMRManmad Jn · 5 min halt
- 5:19 PMLSLasalgaon · 1 min halt
- 5:31 PMNRNiphad · 1 min halt
5:57 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 208 min (3 h 28 min) Total wait: 243 min
Station change — you must travel to a different station or bus stand
- 10:00 PMNashik Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h · 151 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹220(est.)
Opens AbhiBus — enter Nashik → Daman, Wed, 18 Nov
1:00 AM+1 dayDaman Bus Stand
via Kalyan · 5 routes · best 19 h 46 min
All 5 combinations via Kalyan
Option 2: 4:15 AM12:01 AM+1 day
19 h 46 min1 changeSmallest buffer: 352 minfrom ₹275 (est.)
via Kalyan
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Same station, no local travel
- Safety buffer: 352 min (5 h 52 min) Total wait: 352 min
- 9:30 PMKYNKalyan Jn
Train16210Mysuru - Ajmer Express
Starts from Mysuru Jn (MYS) on Tue, 17 Nov at 20:30 (8:30 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Ajmer Jn (AII) at Thu, 19 Nov 14:25
Runs: Tue, Thu
Indian Railways · 2 h 31 min · 163 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
3 stops — Show or hide intermediate stops
- 10:08 PMBIRDBhivandi Road · 2 min halt
- 10:35 PMBSRVasai Road · 5 min halt
- 11:03 PMPLGPalghar · 2 min halt
12:01 AM+1 dayVAPIVapi
Option 3: 4:15 AM1:00 AM+1 day
20 h 45 min1 changeSmallest buffer: 367 minfrom ₹280 (est.)
via Kalyan
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Same station, no local travel
- Safety buffer: 367 min (6 h 7 min) Total wait: 367 min
- 9:45 PMKYNKalyan Jn
Train16508Bangalore - Bhagat KI Kothi Exp
Starts from Ksr Bengaluru (SBC) on Tue, 17 Nov at 21:55 (9:55 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Jodhpur Jn (JU) at Thu, 19 Nov 16:35
Runs: Daily · Running days not verified — check before booking
Indian Railways · 3 h 15 min · 165 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹50SL ₹1303A ₹4752A ₹665(est.)
2 stops — Show or hide intermediate stops
- 10:19 PMBIRDBhivandi Road · 1 min halt
- 11:05 PMBSRVasai Road · 5 min halt
1:00 AM+1 dayVAPIVapi
Option 4: 4:15 AM1:03 AM+1 day
20 h 48 min1 changeSmallest buffer: 392 minfrom ₹275 (est.)
via Kalyan
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Same station, no local travel
- Safety buffer: 392 min (6 h 32 min) Total wait: 392 min
- 10:10 PMKYNKalyan Jn
Train14810Jodhpur Hdp-ju Express
Same timings: 20496
Starts from Hadapsar (HDP) on Wed, 18 Nov at 19:15 (7:15 PM) · you board on day 1
Ends at Jodhpur Jn (JU) at Thu, 19 Nov 15:10
Runs: Daily
Indian Railways · 2 h 53 min · 162 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹45SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
1 stop — Show or hide intermediate stops
- 11:20 PMBSRVasai Road · 5 min halt
1:03 AM+1 dayVAPIVapi
via Manmad · 1 route · best 20 h 15 min
All 1 combinations via Manmad
Option 2: 4:15 AM12:30 AM+1 day
20 h 15 min2 changesSmallest buffer: 215 minfrom ₹360 (est.)
via Manmad · Nashik
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 7 h 30 min · 398 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹165CC ₹545(est.)
7 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
11:45 AMMMRManmad Jn Change at Manmad
- Same station, no local travel
- Safety buffer: 250 min (4 h 10 min) Total wait: 250 min
- 3:55 PMMMRManmad Jn
Train12166Mumbai Ltt SF Express
Starts from Gorakhpur Jn (GKP) on Tue, 17 Nov at 15:25 (3:25 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Mumbai Ltt (LTT) at Wed, 18 Nov 20:50
Runs: Tue, Fri, Sat
Indian Railways · 55 min · 73 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1603A ₹5202A ₹710(est.)
4:50 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 215 min (3 h 35 min) Total wait: 250 min
Station change — you must travel to a different station or bus stand
- 9:00 PMNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
12:30 AM+1 dayVapi Bus Stand
via Basmat · 1 route · best 20 h 25 min
All 1 combinations via Basmat
Option 2: 12:05 AM8:30 PM
20 h 25 min2 changesSmallest buffer: 223 minfrom ₹345 (est.)
via Basmat · Nashik
- 12:05 AMHNLHingoli Deccan
Train17683Akola - Purna Express
Starts from Akola Jn (AK) on Tue, 17 Nov at 22:15 (10:15 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Purna Jn (PAU) at Wed, 18 Nov 02:00
Runs: Daily
Indian Railways · 53 min · 58 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹15SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
12:58 AMBMFBasmat Change at Basmat
- Same station, no local travel
- Safety buffer: 237 min (3 h 57 min) Total wait: 237 min
Night-time change — plan safe waiting and local transport
- 4:55 AMBMFBasmat
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 7 h 47 min · 413 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹170CC ₹560(est.)
7 stops — Show or hide intermediate stops
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
12:42 PMNKNasik Road Change at Nashik
- Local transit: 35 min · Nasik Road (NK) →← Nashik Bus Stand
- Safety buffer: 223 min (3 h 43 min) Total wait: 258 min
Station change — you must travel to a different station or bus stand
- 5:00 PMNashik Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 3 h 30 min · 140 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹160(est.)
Buy at bus stand · every 60 min
8:30 PMVapi Bus Stand
via Surat · 8 routes · best 20 h 30 min
All 8 combinations via Surat
Option 2: 2:35 AM11:05 PM
20 h 30 min2 changesSmallest buffer: 180 minfrom ₹265 (est.)
via Surat · Navsari
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 20 min · 18 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
2 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
4:52 PMMRLMaroli Change at Navsari
- Local transit: 45 min · Maroli (MRL) →← Navsari Bus Stand
- Safety buffer: 203 min (3 h 23 min) Total wait: 248 min
Station change — you must travel to a different station or bus stand
- 9:00 PMNavsari Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 2 h 5 min · 83 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹95(est.)
Buy at bus stand · every 60 min
11:05 PMVapi Bus Stand
Option 3: 2:35 AM11:05 PM
20 h 30 min2 changesSmallest buffer: 186 minfrom ₹265 (est.)
via Surat · Navsari
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 199 min (3 h 19 min) Total wait: 199 min
- 4:51 PMUDNUdhna Jn
Train19102Virar MEMU Express
Starts from Surat (ST) on Wed, 18 Nov at 16:45 (4:45 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 22:22
Runs: Daily
Indian Railways · 18 min · 17 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
2 stops — Show or hide intermediate stops
- 4:54 PMBHETBhestan · 1 min halt
- 5:00 PMSCHSachin · 1 min halt
5:09 PMMRLMaroli Change at Navsari
- Local transit: 45 min · Maroli (MRL) →← Navsari Bus Stand
- Safety buffer: 186 min (3 h 6 min) Total wait: 231 min
Station change — you must travel to a different station or bus stand
- 9:00 PMNavsari Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 2 h 5 min · 83 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹95(est.)
Buy at bus stand · every 60 min
11:05 PMVapi Bus Stand
Option 4: 2:35 AM11:05 PM
20 h 30 min2 changesSmallest buffer: 180 minfrom ₹265 (est.)
via Surat · Navsari
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 10 h 57 min · 598 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹160SL ₹3203A ₹8352A ₹1,1701A ₹1,930(est.)
9 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
- 8:15 AMBSLBhusaval Jn · 5 min halt
- 8:50 AMJLJalgaon Jn · 2 min halt
- 9:33 AMDXGDharangaon · 2 min halt
- 9:54 AMANAmalner · 2 min halt
- 11:25 AMNDBNandurbar · 5 min halt
1:32 PMUDNUdhna Jn Change at Surat
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 4:32 PMUDNUdhna Jn
Train59010Bharuch Virar Passenger
Starts from Bharuch Jn (BH) on Wed, 18 Nov at 14:05 (2:05 PM) · you board on day 1
Ends at Virar (VR) at Wed, 18 Nov 21:30
Runs: Daily · Running days not verified — check before booking
Indian Railways · 29 min · 26 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
3 stops — Show or hide intermediate stops
- 4:38 PMBHETBhestan · 2 min halt
- 4:44 PMSCHSachin · 2 min halt
- 4:52 PMMRLMaroli · 2 min halt
5:01 PMNVSNavsari Change at Navsari
- Local transit: 25 min · Navsari (NVS) →← Navsari Bus Stand
- Safety buffer: 214 min (3 h 34 min) Total wait: 239 min
Station change — you must travel to a different station or bus stand
- 9:00 PMNavsari Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 2 h 5 min · 83 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹95(est.)
Buy at bus stand · every 60 min
11:05 PMVapi Bus Stand
via Kalyan · 6 routes · best 20 h 46 min
All 6 combinations via Kalyan
Option 2: 4:15 AM1:01 AM+1 day
20 h 46 min2 changesSmallest buffer: 186 minfrom ₹275 (est.)
via Kalyan · Thane
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Same station, no local travel
- Safety buffer: 192 min (3 h 12 min) Total wait: 192 min
- 6:50 PMKYNKalyan Jn
Train11030Koyna Express
Starts from Kolhapur (KOP) on Wed, 18 Nov at 08:25 (8:25 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 20:05
Runs: Daily
Indian Railways · 17 min · 21 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹5CC ₹100SL ₹1303A ₹4752A ₹6651A ₹1,080(est.)
7:07 PMTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 186 min (3 h 6 min) Total wait: 241 min
Station change — you must travel to a different station or bus stand
- 11:08 PMBVIBorivali
Train09183Mau Special Fare AC Special
Starts from Mumbai Central (MMCT) on Wed, 18 Nov at 22:30 (10:30 PM) · you board on day 1
Ends at Mau Jn (MAU) at Fri, 20 Nov 10:00
Runs: Wed
Indian Railways · 1 h 53 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹403A ₹4752A ₹6651A ₹1,080(est.)
1 stop — Show or hide intermediate stops
- 11:53 PMPLGPalghar · 2 min halt
1:01 AM+1 dayVAPIVapi
Option 3: 4:15 AM1:18 AM+1 day
21 h 3 min2 changesSmallest buffer: 180 minfrom ₹300 (est.)
via Kalyan · Bhiwandi
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Local transit: 30 min · Kalyan Jn (KYN) →← Kopar (KOPR)
- Safety buffer: 229 min (3 h 49 min) Total wait: 259 min
Station change — you must travel to a different station or bus stand
- 7:57 PMKOPRKopar
Train69161Panvel - Dahanu Road Local
Starts from Panvel (PNVL) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1
Ends at Dahanu Road (DRD) at Wed, 18 Nov 22:30
Runs: Daily
Indian Railways · 8 min · 8 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
8:05 PMBIRDBhivandi Road Change at Bhiwandi
- Same station, no local travel
- Safety buffer: 180 min (3 h) Total wait: 180 min
- 11:05 PMBIRDBhivandi Road
Train22186Ahimsa SF Express
Starts from Pune Jn (PUNE) on Wed, 18 Nov at 20:10 (8:10 PM) · you board on day 1
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 07:35
Runs: Wed
Indian Railways · 2 h 13 min · 149 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹60SL ₹1603A ₹5202A ₹710(est.)
2 stops — Show or hide intermediate stops
- 11:35 PMBSRVasai Road · 5 min halt
- 12:43 AMDRDDahanu Road · 2 min halt
1:18 AM+1 dayVAPIVapi
Option 4: 4:15 AM1:44 AM+1 day
21 h 29 min2 changesSmallest buffer: 185 minfrom ₹275 (est.)
via Kalyan · Vasai-Virar
- 4:15 AMHNLHingoli Deccan
Train11070Hingoli Deccan - Mumbai Csmt Jan Shatabdi Express
Starts from Hingoli Deccan (HNL) on Wed, 18 Nov at 04:15 (4:15 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Wed, 18 Nov 16:50
Runs: Daily
Indian Railways · 11 h 23 min · 603 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹230CC ₹750(est.)
11 stops — Show or hide intermediate stops
- 4:54 AMBMFBasmat · 1 min halt
- 5:25 AMPAUPurna Jn · 5 min halt
- 6:08 AMPBNParbhani Jn · 2 min halt
- 6:54 AMSELUSelu · 1 min halt
- 7:24 AMPTUPartur · 1 min halt
- 8:23 AMJJalna · 2 min halt
- 9:35 AMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:45 AMMMRManmad Jn · 5 min halt
- 12:42 PMNKNasik Road · 3 min halt
- 1:50 PMIGPIgatpuri · 2 min halt
- 2:22 PMKSRAKasara · 2 min halt
3:38 PMKYNKalyan Jn Change at Kalyan
- Local transit: 30 min · Kalyan Jn (KYN) →← Kopar (KOPR)
- Safety buffer: 229 min (3 h 49 min) Total wait: 259 min
Station change — you must travel to a different station or bus stand
- 7:57 PMKOPRKopar
Train69161Panvel - Dahanu Road Local
Starts from Panvel (PNVL) on Wed, 18 Nov at 19:05 (7:05 PM) · you board on day 1
Ends at Dahanu Road (DRD) at Wed, 18 Nov 22:30
Runs: Daily
Indian Railways · 48 min · 35 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹10(est.)
4 stops — Show or hide intermediate stops
- 8:05 PMBIRDBhivandi Road · 1 min halt
- 8:10 PMKHBVKharbao · 1 min halt
- 8:27 PMKARDKaman Road · 1 min halt
- 8:34 PMJCNRJuchandra · 1 min halt
8:45 PMBSRVasai Road Change at Vasai-Virar
- Same station, no local travel
- Safety buffer: 185 min (3 h 5 min) Total wait: 185 min
- 11:50 PMBSRVasai Road
Train11096Ahimsa Express
Starts from Pune Jn (PUNE) on Wed, 18 Nov at 19:50 (7:50 PM) · you board on day 1
Ends at Ahmedabad Jn (ADI) at Thu, 19 Nov 07:45
Runs: Daily · Running days not verified — check before booking
Indian Railways · 1 h 54 min · 124 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹35SL ₹1303A ₹4752A ₹665(est.)
1 stop — Show or hide intermediate stops
- 1:08 AMDRDDahanu Road · 2 min halt
1:44 AM+1 dayVAPIVapi
via Jalna · 8 routes · best 20 h 53 min
All 8 combinations via Jalna
Option 2: 10:00 PM6:53 PM+1 day
20 h 53 min2 changesSmallest buffer: 197 minfrom ₹1,505 (est.)
via Jalna · Thane
- 10:00 PMHingoli Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 20 min · 166 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹240(est.)
Opens AbhiBus — enter Hingoli → Jalna, Wed, 18 Nov
1:20 AM+1 dayJalna Bus Stand Change at Jalna
- Local transit: 15 min · Jalna Bus Stand →← Jalna (J)
- Safety buffer: 360 min (6 h) Total wait: 375 min
Night-time change — plan safe waiting and local transport
- 7:35 AM+1 dayJJalna
Train20705Nanded - Mumbai Csmt Vande Bharat Express
Starts from Nanded (NED) on Thu, 19 Nov at 05:20 (5:20 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 14:15
Runs: Sun, Mon, Tue, Thu, Fri, Sat
Indian Railways · 5 h 53 min · 400 km
Scheduled timetable. From the published timetable. Delays are possible.CC ₹635EC ₹1,240(est.)
4 stops — Show or hide intermediate stops
- 8:23 AMCPSNChhatrapati Sambhajinagar · 2 min halt
- 9:58 AMMMRManmad Jn · 2 min halt
- 10:58 AMNKNasik Road · 2 min halt
- 1:08 PMKYNKalyan Jn · 2 min halt
1:28 PM+1 dayTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 197 min (3 h 17 min) Total wait: 252 min
Station change — you must travel to a different station or bus stand
- 5:40 PM+1 dayBVIBorivali
Train12953Mumbai Central - Hazrat Nizamuddin Tejas Rajdhani Express
Starts from Mumbai Central (MMCT) on Thu, 19 Nov at 17:10 (5:10 PM) · you board on day 1
Ends at Hazrat Nizamuddin Jn (NZM) at Fri, 20 Nov 09:43
Runs: Daily
Indian Railways · 1 h 13 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.3A ₹6302A ₹8651A ₹1,410(est.)
6:53 PM+1 dayVAPIVapi
Option 3: 10:00 PM7:09 PM+1 day
21 h 9 min2 changesSmallest buffer: 199 minfrom ₹930 (est.)
via Jalna · Thane
- 10:00 PMHingoli Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 20 min · 166 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹240(est.)
Opens AbhiBus — enter Hingoli → Jalna, Wed, 18 Nov
1:20 AM+1 dayJalna Bus Stand Change at Jalna
- Local transit: 15 min · Jalna Bus Stand →← Jalna (J)
- Safety buffer: 360 min (6 h) Total wait: 375 min
Night-time change — plan safe waiting and local transport
- 7:35 AM+1 dayJJalna
Train20705Nanded - Mumbai Csmt Vande Bharat Express
Starts from Nanded (NED) on Thu, 19 Nov at 05:20 (5:20 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 14:15
Runs: Sun, Mon, Tue, Thu, Fri, Sat
Indian Railways · 5 h 53 min · 400 km
Scheduled timetable. From the published timetable. Delays are possible.CC ₹635EC ₹1,240(est.)
4 stops — Show or hide intermediate stops
- 8:23 AMCPSNChhatrapati Sambhajinagar · 2 min halt
- 9:58 AMMMRManmad Jn · 2 min halt
- 10:58 AMNKNasik Road · 2 min halt
- 1:08 PMKYNKalyan Jn · 2 min halt
1:28 PM+1 dayTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 199 min (3 h 19 min) Total wait: 254 min
Station change — you must travel to a different station or bus stand
- 5:42 PM+1 dayBVIBorivali
Train12979Jaipur SF Express
Starts from Bandra Terminus (BDTS) on Thu, 19 Nov at 17:05 (5:05 PM) · you board on day 1
Ends at Jaipur (JP) at Fri, 20 Nov 10:05
Runs: Tue, Thu, Sat
Indian Railways · 1 h 27 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹55SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)
1 stop — Show or hide intermediate stops
- 6:23 PMPLGPalghar · 2 min halt
7:09 PM+1 dayVAPIVapi
Option 4: 10:00 PM7:53 PM+1 day
21 h 53 min2 changesSmallest buffer: 229 minfrom ₹930 (est.)
via Jalna · Thane
- 10:00 PMHingoli Bus Stand
BusState RTC / Private (estimated) Express
State RTC / Private (estimated) · 3 h 20 min · 166 km
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Express ₹240(est.)
Opens AbhiBus — enter Hingoli → Jalna, Wed, 18 Nov
1:20 AM+1 dayJalna Bus Stand Change at Jalna
- Local transit: 15 min · Jalna Bus Stand →← Jalna (J)
- Safety buffer: 360 min (6 h) Total wait: 375 min
Night-time change — plan safe waiting and local transport
- 7:35 AM+1 dayJJalna
Train20705Nanded - Mumbai Csmt Vande Bharat Express
Starts from Nanded (NED) on Thu, 19 Nov at 05:20 (5:20 AM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 14:15
Runs: Sun, Mon, Tue, Thu, Fri, Sat
Indian Railways · 5 h 53 min · 400 km
Scheduled timetable. From the published timetable. Delays are possible.CC ₹635EC ₹1,240(est.)
4 stops — Show or hide intermediate stops
- 8:23 AMCPSNChhatrapati Sambhajinagar · 2 min halt
- 9:58 AMMMRManmad Jn · 2 min halt
- 10:58 AMNKNasik Road · 2 min halt
- 1:08 PMKYNKalyan Jn · 2 min halt
1:28 PM+1 dayTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 229 min (3 h 49 min) Total wait: 284 min
Station change — you must travel to a different station or bus stand
- 6:12 PM+1 dayBVIBorivali
Train22955Kutch SF Express
Starts from Bandra Terminus (BDTS) on Thu, 19 Nov at 17:45 (5:45 PM) · you board on day 1
Ends at Bhuj (BHUJ) at Fri, 20 Nov 08:30
Runs: Daily
Indian Railways · 1 h 41 min · 139 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹55SL ₹1603A ₹5202A ₹7101A ₹1,155(est.)
1 stop — Show or hide intermediate stops
- 6:58 PMPLGPalghar · 2 min halt
7:53 PM+1 dayVAPIVapi
via Parbhani · 1 route · best 21 h 49 min
All 1 combinations via Parbhani
Option 2: 3:00 PM12:49 PM+1 day
21 h 49 min2 changesSmallest buffer: 192 minfrom ₹245 (est.)
via Parbhani · Thane
- 3:00 PMHingoli Bus Stand
BusState RTC (estimated) Ordinary
State RTC (estimated) · 1 h 55 min · 77 km · Runs every 60 min
Estimated — verify on partner. Our estimate from road distance. Times and fares are not confirmed — check on the partner site.Ordinary ₹90(est.)
Buy at bus stand · every 60 min
4:55 PMParbhani Bus Stand Change at Parbhani
- Local transit: 15 min · Parbhani Bus Stand →← Parbhani Jn (PBN)
- Safety buffer: 192 min (3 h 12 min) Total wait: 207 min
Station change — you must travel to a different station or bus stand
- 8:22 PMPBNParbhani Jn
Train17058Devagiri Express
Starts from Lingampalli (LPI) on Wed, 18 Nov at 12:25 (12:25 PM) · you board on day 1
Ends at Mumbai Csmt (CSMT) at Thu, 19 Nov 07:10
Runs: Daily
Indian Railways · 9 h 38 min · 514 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹140SL ₹2803A ₹7302A ₹1,0301A ₹1,690(est.)
11 stops — Show or hide intermediate stops
- 8:45 PMMVOManwath Road · 1 min halt
- 9:04 PMSELUSelu · 1 min halt
- 9:29 PMPTUPartur · 1 min halt
- 10:13 PMJJalna · 2 min halt
- 11:20 PMCPSNChhatrapati Sambhajinagar · 5 min halt
- 11:58 PMLSRLasur · 1 min halt
- 12:25 AMRGORotegaon · 1 min halt
- 1:45 AMMMRManmad Jn · 5 min halt
- 2:45 AMNKNasik Road · 5 min halt
- 4:08 AMIGPIgatpuri · 2 min halt
- 5:42 AMKYNKalyan Jn · 3 min halt
6:00 AM+1 dayTNAThane Change at Thane
- Local transit: 55 min · Thane (TNA) →← Borivali (BVI)
- Safety buffer: 214 min (3 h 34 min) Total wait: 269 min
Station change — you must travel to a different station or bus stand
- 10:29 AM+1 dayBVIBorivali
Train59045Mumbai Central- Vapi Passenger
Starts from Mumbai Central (MMCT) on Thu, 19 Nov at 09:55 (9:55 AM) · you board on day 1
Ends at Vapi (VAPI) at Thu, 19 Nov 13:30
Runs: Daily
Indian Railways · 2 h 20 min · 116 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹15(est.)
7 stops — Show or hide intermediate stops
- 10:58 AMVRVirar · 2 min halt
- 11:14 AMSAHSaphale · 1 min halt
- 11:33 AMPLGPalghar · 2 min halt
- 11:48 AMBORBoisar · 2 min halt
- 12:08 PMDRDDahanu Road · 2 min halt
- 12:19 PMGVDGholvad · 1 min halt
- 12:33 PMUBRUmbargam Road · 2 min halt
12:49 PM+1 daySJNSanjan
via Bhusawal · 1 route · best 23 h 18 min
All 1 combinations via Bhusawal
Option 2: 2:35 AM1:53 AM+1 day
23 h 18 min1 changeSmallest buffer: 630 minfrom ₹205 (est.)
via Bhusawal
- 2:35 AMHNLHingoli Deccan
Train17295Hisar Weekly Express
Starts from Kakinada Town (CCT) on Tue, 17 Nov at 05:40 (5:40 AM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Hisar (HSR) at Thu, 19 Nov 13:40
Runs: Tue
Indian Railways · 5 h 40 min · 267 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹75SL ₹1653A ₹4752A ₹6651A ₹1,080(est.)
4 stops — Show or hide intermediate stops
- 3:54 AMWHMWashim · 1 min halt
- 5:40 AMAKAkola Jn · 5 min halt
- 6:10 AMSEGShegaon · 1 min halt
- 6:43 AMMKUMalkapur · 2 min halt
8:15 AMBSLBhusaval Jn Change at Bhusawal
- Same station, no local travel
- Safety buffer: 630 min (10 h 30 min) Total wait: 630 min
- 6:45 PMBSLBhusaval Jn
Train22914Saharsa - Bandra Terminus Humsafar Express
Starts from Saharsa Jn (SHC) on Tue, 17 Nov at 17:20 (5:20 PM) · you board on day 2
This train starts on Tue, 17 Nov, but you board on Wed, 18 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 04:45
Runs: Tue
Indian Railways · 7 h 8 min · 419 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹130SL ₹2703A ₹665(est.)
3 stops — Show or hide intermediate stops
- 9:25 PMNDBNandurbar · 5 min halt
- 12:15 AMBHETBhestan · 5 min halt
- 1:25 AMBLValsad · 5 min halt
1:53 AM+1 dayVAPIVapi
via Khandwa · 1 route · best 25 h 23 min
All 1 combinations via Khandwa
Option 2: 1:00 PM2:23 PM+1 day
25 h 23 min1 changeSmallest buffer: 553 minfrom ₹275 (est.)
via Khandwa
- 1:00 PMHNLHingoli Deccan
Train12421Amritsar SF Express
Starts from Nanded (NED) on Wed, 18 Nov at 11:05 (11:05 AM) · you board on day 1
Ends at Amritsar Jn (ASR) at Thu, 19 Nov 18:35
Runs: Wed
Indian Railways · 7 h 12 min · 383 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹125SL ₹2503A ₹6202A ₹850(est.)
4 stops — Show or hide intermediate stops
- 1:49 PMWHMWashim · 1 min halt
- 3:55 PMAKAkola Jn · 5 min halt
- 4:29 PMSEGShegaon · 1 min halt
- 5:00 PMMKUMalkapur · 2 min halt
8:12 PMKNWKhandwa Change at Khandwa
- Same station, no local travel
- Safety buffer: 553 min (9 h 13 min) Total wait: 553 min
- 5:25 AM+1 dayKNWKhandwa
Train15067Bandra Terminus Weekly Express
Starts from Gorakhpur Jn (GKP) on Wed, 18 Nov at 05:05 (5:05 AM) · you board on day 2
This train starts on Wed, 18 Nov, but you board on Thu, 19 Nov. Booking sites may ask for either date — check which one before you pay.
Ends at Bandra Terminus (BDTS) at Thu, 19 Nov 17:45
Runs: Wed
Indian Railways · 8 h 58 min · 542 km
Scheduled timetable. From the published timetable. Delays are possible.GN ₹150SL ₹2953A ₹7652A ₹1,0751A ₹1,770(est.)
4 stops — Show or hide intermediate stops
- 7:20 AMBSLBhusaval Jn · 5 min halt
- 7:55 AMJLJalgaon Jn · 5 min halt
- 10:30 AMNDBNandurbar · 5 min halt
- 1:15 PMBHETBhestan · 5 min halt
2:23 PM+1 dayVAPIVapi
Alternatives
Start from a nearby station
- Nanded → Vapi · 67 km away · best 14 h 55 min
- Parbhani → Vapi · 64 km away · best 13 h 45 min
Change at a different city
- via Akola · 78 routes
- via Surat · 39 routes
- via Malkapur · 16 routes
- via Kalyan · 14 routes
- via Washim · 14 routes
- via Mumbai · 11 routes
- via Jalna · 9 routes
- via Thane · 7 routes
- via Parbhani · 4 routes
- via Nashik · 3 routes
- via Basmat · 1 route
- via Bhusawal · 1 route
- via Khandwa · 1 route
- via Manmad · 1 route
- via Purna · 1 route
Other dates
Search another dateFrequently asked questions
- Is there a direct train from Hingoli to Vapi?
- No direct train on a typical day. The fastest option is Train 17295 → Surat → Train 59010, taking 15 h 54 min in total.
- What is the fastest way from Hingoli to Vapi?
- Train 17295 → Surat → Train 59010: 15 h 54 min in total, including a safe connection buffer.
- What is the cheapest way from Hingoli to Vapi?
- From about ₹120 (estimate): Train 17295 → Akola → Train 59026 → Surat → Train 59460.
- When are the first and last departures from Hingoli to Vapi?
- The first departure is at 00:05 and the last at 23:50 on a typical day.
- Where can I change between Hingoli and Vapi?
- Combinations change at Surat, Nashik, Thane, Malkapur.
Timetable data as of 2026-11-18. Always verify on the operator or partner site.