Pathardi atanga Mumbai train & bus
Pathardi leh Mumbai inkarah train kal tlang a awm lo, bus kal tlang a awm lo, leh bus + train combo 200 a awm. Rang ber: Ahilyanagar (Ahmednagar) kaltlangin 12 h 35 min. Man ₹140 atanga (chhut). Chhuak hmasa ber 6:00 AM, a hnuhnung ber 8:00 PM.
Train kal tlang a awm lo — combo ṭha berte a hnuaiah.
Wednesday pangngai hun — i ni en rawhI zin ni en rawh
Thlan rang
Rang ber
Bus→ Ahilyanagar (Ahmednagar) →Train 110426:00 PM – 6:35 AM · 12 h 35 min · ₹165 atangin (chhut)Man tlawm ber
Bus→ Ahilyanagar (Ahmednagar) →Train 01466→ Pune →Train 1851912:00 PM – 4:30 AM · 16 h 30 min · ₹140 atangin (chhut)Inthlak tlem ber
Bus→ Ahilyanagar (Ahmednagar) →Train 110426:00 PM – 6:35 AM · 12 h 35 min · ₹165 atangin (chhut)
Bus + train leh combo dangte (200)
Ahilyanagar (Ahmednagar) kaltlangin · Kawng 2 · tha ber 12 h 35 min
Thlan 1: +ni 1
Wed, 25 Nov Thu, 26 Nov · Ahilyanagar (Ahmednagar) kaltlangin
12 h 35 minInthlak 1from ₹165 (about)
- Night change
- Estimated bus
- +1 more
- Tha ber
- Rang ber
- Inthlak tlem ber
- Pathardi Bus Stand
BusState RTC (estimated) OrdinaryEstimated — confirm at the bus stand. Our estimate from road distance. Times and fares are not confirmed — check at the bus stand or with the operator.
1 h 20 min · 52 km · Minute 60 danah a kal
Ordinary ₹60(about)
Bus stand-ah lei rawh · minute 60 danah
Wrong timing? Tell us
CBS Maliwada Ahilyanagar (Ahmednagar)-ah inthlak rawh
- Different station: CBS Maliwada bus stand → Ahilyanagar railway station (ANG), about 15 min by auto
- 3 h 35 min wait at Ahilyanagar (Ahmednagar)comfortable
You change at Ahilyanagar (Ahmednagar) at 11:10 PM. A waiting room is recommended.
- ANGAhilyanagar
Train11042Dadar Central Express· Sun, Wed, Thu, Fri
Indian Railways · 7 h 25 min · 337 km
GN ₹105SL ₹2103A ₹5352A ₹740(about)
GN General · SL Sleeper · 3A AC 3-tier · 2A AC 2-tier · 1A AC First · CC AC Chair Car · 2S Second Sitting
Train details
Sainagar Shirdi (SNSI) atangin Wed, 25 Nov, 9:25 PM-ah a ṭan · ni 1-naah i chuang ang
Dadar (DR)-ah Thu, 26 Nov 6:35 AM-ah a tâwp
Chawlhna 9 — Kawng laia chawlhna te tihlan emaw thup rawh
- DDCCDaund Chord Line · Minute 5 chawl
- KDGKedgaon · Minute 2 chawl
- URIUruli · Minute 2 chawl
- PUNEPune Jn · Minute 5 chawl
- CCHChinchvad · Minute 2 chawl
- TGNTalegaon · Minute 2 chawl
- LNLLonavala · Minute 2 chawl
- KYNKalyan Jn · Minute 2 chawl
- TNAThane · Minute 3 chawl
IRCTC-ah emaw station ticket counter-ah book rawh
Wrong timing? Tell us
+ni 1DRDadar
Ahilyanagar (Ahmednagar) kaltlangin combo 2 zawng zawng
- Bus→ Ahilyanagar (Ahmednagar) →Train 1104210:00 AM – 6:35 AM · 20 h 35 min · ₹165 atangin (chhut)
Chhatrapati Sambhajinagar (Aurangabad) kaltlangin · Kawng 7 · tha ber 12 h 57 min
Thlan 1: +ni 1
Wed, 25 Nov Thu, 26 Nov · Chhatrapati Sambhajinagar (Aurangabad) kaltlangin
12 h 57 minInthlak 1from ₹215 (about)
- Estimated bus
- Different station
- Inthlakna khawpui dang
- Station hnai
- Amrapur Bus Stand
BusState RTC (estimated) OrdinaryEstimated — confirm at the bus stand. Our estimate from road distance. Times and fares are not confirmed — check at the bus stand or with the operator.
2 h 10 min · 87 km · Minute 120 danah a kal
Ordinary ₹100(about)
Bus stand-ah lei rawh · minute 120 danah
Wrong timing? Tell us
Aurangabad Central Bus Station Chhatrapati Sambhajinagar (Aurangabad)-ah inthlak rawh
- Different station: Aurangabad Central Bus Station → Chhatrapati Sambhajinagar railway station (CPSN), about 20 min by auto
- 3 h wait at Chhatrapati Sambhajinagar (Aurangabad)comfortable
- CPSNChhatrapati Sambhajinagar
Train11002Nandigram Express· Ni tin
Indian Railways · 7 h 27 min · 361 km
GN ₹115SL ₹2253A ₹5652A ₹7851A ₹1,270(about)
GN General · SL Sleeper · 3A AC 3-tier · 2A AC 2-tier · 1A AC First · CC AC Chair Car · 2S Second Sitting
Train details
Balharshah (BPQ) atangin Wed, 25 Nov, 9:15 AM-ah a ṭan · ni 1-naah i chuang ang
Chhatrapati Shivaji Maharaj Terminus (CSMT)-ah Thu, 26 Nov 5:35 AM-ah a tâwp
Chawlhna 8 — Kawng laia chawlhna te tihlan emaw thup rawh
- LSRLasur · Minute 1 chawl
- RGORotegaon · Minute 1 chawl
- MMRManmad Jn · Minute 5 chawl
- LSLasalgaon · Minute 1 chawl
- NKNasik Road · Minute 3 chawl
- IGPIgatpuri · Minute 5 chawl
- KYNKalyan Jn · Minute 3 chawl
- TNAThane · Minute 2 chawl
IRCTC-ah emaw station ticket counter-ah book rawh
Wrong timing? Tell us
+ni 1DRDadar
Chhatrapati Sambhajinagar (Aurangabad) kaltlangin combo 7 zawng zawng
- Bus→ Chhatrapati Sambhajinagar (Aurangabad) →Train 110024:00 PM – 5:35 AM · 13 h 35 min · ₹215 atangin (chhut)
- Bus→ Chhatrapati Sambhajinagar (Aurangabad) →Train 176188:00 AM – 9:36 PM · 13 h 36 min · ₹215 atangin (chhut)
Ahilyanagar (Ahmednagar) kaltlangin · Kawng 117 · tha ber 14 h 15 min
Thlan 1: +ni 1
Wed, 25 Nov Thu, 26 Nov · Ahilyanagar (Ahmednagar) · Pune kaltlangin
14 h 15 minInthlak 2from ₹450 (about)
- Night change
- Estimated bus
- +1 more
- Pathardi Bus Stand
BusState RTC (estimated) OrdinaryEstimated — confirm at the bus stand. Our estimate from road distance. Times and fares are not confirmed — check at the bus stand or with the operator.
1 h 20 min · 52 km · Minute 60 danah a kal
Ordinary ₹60(about)
Bus stand-ah lei rawh · minute 60 danah
Wrong timing? Tell us
CBS Maliwada Ahilyanagar (Ahmednagar)-ah inthlak rawh
- Different station: CBS Maliwada bus stand → Ahilyanagar railway station (ANG), about 15 min by auto
- 3 h 45 min wait at Ahilyanagar (Ahmednagar)comfortable
- ANGAhilyanagar
Train26102Ajni - Pune Vande Bharat Express· Sun, Tue, Wed, Thu, Fri, Sat
Indian Railways · 2 h 30 min · 154 km
CC ₹315EC ₹585(about)
GN General · SL Sleeper · 3A AC 3-tier · 2A AC 2-tier · 1A AC First · CC AC Chair Car · 2S Second Sitting
Train details
Ajni (AJNI) atangin Wed, 25 Nov, 9:50 AM-ah a ṭan · ni 1-naah i chuang ang
Pune Jn (PUNE)-ah Wed, 25 Nov 9:50 PM-ah a tâwp
Chawlhna 1 — Kawng laia chawlhna te tihlan emaw thup rawh
- DDCCDaund Chord Line · Minute 2 chawl
IRCTC-ah emaw station ticket counter-ah book rawh
Wrong timing? Tell us
PUNEPune Junction Pune-ah inthlak rawh
- Station khat, khawchhung kal ngai lo
- 3 h wait at Punecomfortable
You change at Pune at 12:50 AM. A waiting room is recommended.
- +ni 1PUNEPune Junction
Train12702Hussain Sagar SF Express· Ni tin
Indian Railways · 3 h 25 min · 183 km
GN ₹75SL ₹1653A ₹5352A ₹725(about)
He train hi Wed, 25 Nov-ah a ṭan a, mahse Thu, 26 Nov-ah i chuang ang. Booking site-ten ni pahnih zinga pakhat an zawt thei — pawisa i pek hmain eng nge ni tih en rawh.
Train details
Hyderabad (HYB) atangin Wed, 25 Nov, 2:55 PM-ah a ṭan · ni 2-naah i chuang ang
Chhatrapati Shivaji Maharaj Terminus (CSMT)-ah Thu, 26 Nov 4:55 AM-ah a tâwp
Chawlhna 1 — Kawng laia chawlhna te tihlan emaw thup rawh
- KYNKalyan Jn · Minute 3 chawl
IRCTC-ah emaw station ticket counter-ah book rawh
Wrong timing? Tell us
+ni 1DRDadar
Ahilyanagar (Ahmednagar) kaltlangin combo 117 zawng zawng
- Bus→ Ahilyanagar (Ahmednagar) →Train 26102→ Pune →Train 111402:00 PM – 4:21 AM · 14 h 21 min · ₹450 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Train 01466→ Pune →Train 1102012:00 PM – 2:40 AM · 14 h 40 min · ₹145 atangin (chhut)
Ahilyanagar (Ahmednagar) kaltlangin · Kawng 6 · tha ber 14 h 30 min
Ahilyanagar (Ahmednagar) kaltlangin combo 6 zawng zawng
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pune →Bus6:00 AM – 8:30 PM · 14 h 30 min · ₹515 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pune →Bus7:00 AM – 9:30 PM · 14 h 30 min · ₹515 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pimpri-Chinchwad →Bus9:00 AM – 11:50 PM · 14 h 50 min · ₹370 atangin (chhut)
Ahilyanagar (Ahmednagar) kaltlangin · Kawng 6 · tha ber 14 h 30 min
Ahilyanagar (Ahmednagar) kaltlangin combo 6 zawng zawng
- Bus→ Ahilyanagar (Ahmednagar) →Train 01466→ Pune →Bus12:00 PM – 2:30 AM · 14 h 30 min · ₹400 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Train 01474→ Pune →Bus12:00 PM – 2:30 AM · 14 h 30 min · ₹425 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Train 11078→ Pune →Bus8:00 AM – 11:00 PM · 15 h · ₹425 atangin (chhut)
Ahilyanagar (Ahmednagar) kaltlangin · Kawng 29 · tha ber 14 h 33 min
Ahilyanagar (Ahmednagar) kaltlangin combo 29 zawng zawng
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pune →Train 221067:00 AM – 9:33 PM · 14 h 33 min · ₹275 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pune →Train 121286:00 AM – 8:38 PM · 14 h 38 min · ₹275 atangin (chhut)
- Bus→ Ahilyanagar (Ahmednagar) →Bus→ Pune →Train 1102012:00 PM – 2:40 AM · 14 h 40 min · ₹260 atangin (chhut)
Chhatrapati Sambhajinagar (Aurangabad) kaltlangin · Kawng 30 · tha ber 15 h 53 min
Chhatrapati Sambhajinagar (Aurangabad) kaltlangin combo 30 zawng zawng
- Bus→ Chhatrapati Sambhajinagar (Aurangabad) →Train 11002→ Kalyan →Train 952024:00 PM – 7:53 AM · 15 h 53 min · ₹210 atangin (chhut)
- Bus→ Chhatrapati Sambhajinagar (Aurangabad) →Train 11002→ Kalyan →Train 957044:00 PM – 8:00 AM · 16 h · ₹210 atangin (chhut)
- Bus→ Chhatrapati Sambhajinagar (Aurangabad) →Train 11002→ Thane →Train 966124:00 PM – 8:00 AM · 16 h · ₹215 atangin (chhut)
Shrirampur kaltlangin · Kawng 3 · tha ber 16 h 30 min
Shrirampur kaltlangin combo 3 zawng zawng
- Bus→ Shrirampur →Train 11033→ Manmad →Train 055871:00 PM – 5:30 AM · 16 h 30 min · ₹200 atangin (chhut)
- Bus→ Shrirampur →Train 11033→ Manmad →Train 121061:00 PM – 6:04 AM · 17 h 4 min · ₹220 atangin (chhut)
- Bus→ Shrirampur →Train 11033→ Manmad →Train 170581:00 PM – 6:29 AM · 17 h 29 min · ₹205 atangin (chhut)
Thlan dang
Station hnai atangin ṭan rawh
- Daund → Mumbai · 101 km hla · tha ber 4 h 2 min
- Ahilyanagar (Ahmednagar) → Mumbai · 46 km hla · tha ber 7 h 25 min
Khawpui dangah inthlak rawh
- Ahilyanagar (Ahmednagar) kaltlangin · Kawng 160
- Chhatrapati Sambhajinagar (Aurangabad) kaltlangin · Kawng 37
- Shrirampur kaltlangin · Kawng 3
Ni dang
Ni dang zawng rawhZawhna zawh fo
- Pathardi atanga Mumbai kal tlang train a awm em?
- Ni pangngaiah train kal tlang a awm lo. Thlan rang ber chu Bus → Ahilyanagar (Ahmednagar) → Train 11042 a ni, a vaiin 12 h 35 min a duh.
- Pathardi atanga Mumbai kalna kawng rang ber chu eng nge?
- Bus → Ahilyanagar (Ahmednagar) → Train 11042: a vaiin 12 h 35 min, inthlakna hun dah him tel.
- Pathardi atanga Mumbai kalna kawng man tlawm ber chu eng nge?
- ₹140 vel atanga (chhut): Bus → Ahilyanagar (Ahmednagar) → Train 01466 → Pune → Train 18519.
- Pathardi atanga Mumbai chhuak hmasa ber leh hnuhnung ber hun eng nge?
- Ni pangngaiah chhuak hmasa ber chu 6:00 AM a ni a, a hnuhnung ber chu 8:00 PM.
- Pathardi leh Mumbai inkarah khawiah nge ka inthlak theih?
- Combo te hi Ahilyanagar (Ahmednagar), Chhatrapati Sambhajinagar (Aurangabad), Shrirampur-ah an inthlak.
Timetable data as of 2026-11-25. Always check with IRCTC or the bus operator.